Loading...
HomeMy WebLinkAbout3.3 ITEM 3.3 TOWN OF LOS ALTOS HILLS April 7, 2016 Staff Report to the Planning Commission SUBJECT: CONDITIONAL DEVELOPMENT PERMIT FOR A NEW RESIDENCE; LANDS OF DILIGENT OPERATIONS LTD; 12930 LA CRESTA DRIVE; FILE#398-15-ZP-SD-GD-CDP FROM: Suzanne Avila,AICP, Planning Director S' RECOMMENDATION: That the Planning Commission: Approve the Conditional Development and Site Development Permits for a new residence subject to the findings in Attachment 1 and recommended conditions in Attachment 2. BACKGROUND. , . The subject property is a 1.146 acre parcel located on'the east side of La Cresta Drive, between Viscaino -Road and;Nina,Place. ,;The rear property line abuts, Anacapa Drive. The .existing residence with attached garage was constructed in ,1962. Surrounding properties are developed with single-family:homes., .The property,has a relatively small area for development primarily due to steep slopes and the presence of a driveway easement serving an adjacent property further limits„the building envelope. The average slope of the property is 41.5% which results in a Lot Unit Factor (LUF) of .372. There are 32 trees on the property, many of which are in poor condition. CODE REQUIREMENTS ' • As required by Section 10-1.1007 of the Zoning Ordinance, this application has been forwarded to,the Planning. Commission for review and approval. A Conditional Development Permit is required when_a proposed project is located on a property with a LUF of 0.50 or less. Pursuant to Section ''10-1.1007 (3) of theZoning Ordinance, in reviewing a Conditional Development Permit application the Planning Commission determines whether the proposed development meets the standards of the Town by considering evidence in support of the findings for approval (see Attachment;l): Pursuant to Section 10-2.301 of the Site Development Ordinance, a Site Development Permit is required to construct a new residence. While the proposed residence qualifies for the Fast Track process based on its size, height; and conformance to setbacks and MDA and MFA, the project was forwarded to the Planning Commission for review because of the requirement for a Conditional Development Permit(CDP). Staff Report to the Planning Commission Lands of Diligent Operations Ltd. 12930 La Cresta Drive April 7,2016 Page 2 of 12 Site Data: Net Lot Area: 1.146 acres Average Slope: 41.5% Lot Unit Factor: 0.372 Floor Area and Development Area: Area (sq.ft.) Maximum Existing Proposed Increase Remaining Development 6,520* 8,951 6,457 -2,494 63 Floor 3,920 2,059 3,920** +988 0 *includes 500 square foot roof mounted solar bonus **excludes 2,409 square foot basement DISCUSSION The applicant is requesting approval of a Conditional Development Permit to construct a 3,444 square foot residence with a 476 square foot attached garage and a 2,409 square foot basement. The maximum sectional height of the home will be 25 feet six inches, with a height of 35 feet measured from the lowest to highest point. Story poles have been placed on the site to show the location and height of the proposed residence and perspectives are on the cover sheet of the plans. Exterior materials will consist of smooth stucco and stone veneer siding, wood windows, trim and detailing, iron railings and clay tile roofing. Elevations are shown on sheets A3.0 and A3.1 of the development plans (Attachment 8). The existing development area on the property exceeds the allowable MDA and there is hardscape and a shed in the side setback. The development area will be reduced by about 2,500 square feet, bringing it into compliance with the allowable MDA, and the shed and paving will be removed. All proposed development complies with the Town's setback requirements. Draft findings for approval of the Conditional Development Permit (CDP) are included in Attachment 1. The applicant's CDP findings are included in Attachment 3. Outdoor Lighting Proposed exterior light fixtures consist of down directed sconces (see sheets A3.0 and A3.1 of the development plans). These lights comply with the Town's Outdoor Lighting Policy. Trees &Landscaping The applicant is proposing to remove 15 Eucalyptus trees from the property as required by Section 10-2.802 (g) of the Municipal Code. Four additional trees that are in poor condition will also be removed, including an evergreen pear, Chinese elm, California pepper and a fruit tree. Staff Report to the Planning Commission Lands of Diligent Operations Ltd. 12930 La Cresta Drive April 7,2016 Page 3 of 12 Thirteen trees will be retained including eight oaks, one xylosma, one Monterey cypress, one ash and two pines. Condition#6 requires a landscape screening plan be submitted following framing of the new residence. Landscaping required for screening or erosion control must be planted prior to final inspection. The landscape plan is also required to comply with the newly adopted Water Efficient Landscape Ordinance. Grading and Drainage A drainage system will be installed which includes area drains around the foundation and outdoor area with a detention pipe and two energy dissipaters downslope of the construction (see sheet C3 of the development plans). The Town Geotechnical Consultant recommended supplemental evaluation of the proposed drainage release onto the slope below the proposed residence (included in condition#25). This evaluation will be done prior to acceptance of plans for building permit plan check. Proposed grading includes 1,545 cubic yards of cut and 44 cubic yards of fill, with 1,504 cubic yards of export. Proposed grading is compliant with the Town's Grading Policy. The Engineering Department has reviewed the civil plans and determined that the drainage design meets Town requirements. Engineering staff will review the final grading and drainage plans prior to acceptance of construction plans for building plan check, and will conduct site inspections as needed to determine that the as-built conditions are in conformance with the approved plans. Geotechnical Review The applicant submitted a geotechnical investigation that was reviewed by the Town Geotechnical Consultant, Cotton Shires and Associates (see Attachment 4). Condition #25 requires the project consultant to review construction plans for compliance with geotechnical recommendations, to conduct required inspections during construction, and to submit a final plan review letter to the Town prior to final inspection. Fire Department Review The Santa Clara County Fire Department reviewed the proposed plans and provided comments that have been incorporated into the recommended conditions of approval (see Attachment 2). Committee Review The Environmental Design and Protection Committee (EDPC) commented that landscape screening will be needed along the right side of the new residence since the existing Eucalyptus trees will be removed. The Committee also expressed concern about a skylight element in the library. Condition#6 requires a landscape screening plan to be submitted after the new residence has been framed. The landscape plan will be forwarded to the EDPC for review at that time. Staff Report to the Planning Commission Lands of Diligent Operations Ltd. 12930 La Cresta Drive April 7,2016 Page 4 of 12 Condition #4 requires skylights to be designed to reduce emitted light and no lighting may be placed within skylight wells. The Committee also commented that the new residence will have a three story appearance. Although the flat building elevation reads as three stories, there are not three stacked stories at any point and the upper level is substantially set back from other wall planes (see perspectives on the cover sheet of the development plans). The Open Space Committee recommended that an open space easement be dedicated over the steeper portion of the property starting at the 414 foot contour, extending to the edge of the property along the Anacapa Drive frontage (see Attachment 6). The Committee also recommended an open space easement be dedicated over the steep slope on the south side of the property below La Cresta Drive. Staff believes that an open space easement is not needed in this area. The access easement that serves the property to the south encompasses the first 15 feet from the property line, a portion of the neighbor's driveway extends outside the easement, and the remainder of the area is within the 30 foot setback where no structures can be located. Condition #13 has been included to require the agreement for the open space easement on the lower portion of the property to be completed prior to acceptance of plans for building plan check. The Pathway Committee requested that a type 2B path be installed along the La Cresta Drive frontage (see Attachment 7). Condition#24 has been included requiring the pathway installation prior to final inspection for the new residence. Public Comment To date, staff has not been contacted and no correspondence has been received from the public. CEQA STATUS The project is categorically exempt under CEQA per Section 15303(a) which allows for the construction of one single family residence. ATTACHMENTS 1. Recommended Conditional Development Permit Findings (one page) 2. Recommended Conditions of Approval (six pages) 3. Applicant's Conditional Development Permit Findings (two pages), received February 5, 2016 4. Report from Cotton, Shires &Associates (four pages), dated November 17, 2015 5. Environmental Design and Protection Committee comments (one page), received November 6, 2015 6. Open Space Committee recommendation(one page), received December 15, 2015 7. Pathways Committee recommendation(one page),received November 23, 2015 8. Development plans (16 sheets) Staff Report to the Planning Commission ATTACHMENT 1 Lands of Diligent Operations Ltd. 12930 La Cresta Drive April 7,2016 Page 5 of 12 ATTACHMENT 1 RECOMMENDED FINDINGS FOR CONDITIONAL DEVELOPMENT PERMIT FOR A NEW RESIDENCE WITH BASEMENT LANDS OF DILIGENT OPERATIONS LTD.; 12930 LA CRESTA DRIVE File#398-15-ZP-SD-CDP 1. The site for the proposed development is adequate in size, shape and topography to accommodate the proposed intensity of development, including all structures,yards, open spaces, parking, landscaping, walls and fences, and such other features as may be required by this chapter. The proposed residence will be constructed on the flatter portion of the property and has been designed to meet all setback, height, floor and development area regulations. The new residence will be located in a similar location to the existing house and is in the most appropriate location given the topography. Existing nonconforming development will be removed and the development area will be reduced to comply with the maximum allowable MDA. 2. The size and design of the proposed structures create a proper balance, unity and harmonious appearance in relation to the size, shape and topography of the site and in relation to the surrounding neighborhood The proposed residence is well designed, is compliant with Town standards, and will fit into the site and surroundings. 3. The rural character of the site has been preserved as much as feasible by minimizing vegetation and tree removal, excessive and unsightly grading and alteration of natural land forms. The new residence will be located in about the same location as the existing home that will be removed, and will eliminate nonconforming aspects of the existing improvements on the property including setback encroachments and excess development area. Most of the trees that being removed are eucalyptus which the Municipal Code requires to be taken out. An open space easement will be placed over the lower portion of the site to preserve it in a natural state. 4. The proposed development is in compliance with all regulations and policies set forth in the Site Development ordinance. The proposed residence is in compliance with the regulations and policies set forth in the Site Development Ordinance. The proposed home size is compatible with homes on surrounding properties and will not exceed the allowable MFA. Staff Report to the Planning Commission ATTACHMENT 2 Lands of Diligent Operations Ltd. 12930 La Cresta Drive April 7,2016 Page 6 of 12 ATTACHMENT 2 RECOMMENDED CONDITIONS FOR CONDITIONAL DEVELOPMENT PERMIT FOR A NEW RESIDENCE WITH BASEMENT LANDS OF DILIGENT OPERATIONS LTD.; 12930 LA CRESTA DRIVE File#398-15-ZP-SD-CDP PLANNING DEPARTMENT: 1. No other modifications to the approved plans are allowed except as otherwise first reviewed and approved by the Planning Director or the Planning Commission, depending on the scope of the changes. 2. No new fencing is approved. Any new fencing or gates shall require review and approval by the Planning Depai tment prior to installation. 3. Exterior house lighting isapproved as,shown on the plans. Any additional outdoor lighting shall be approved by the Planning Department prior to installation. 4. Skylights shall be designed and constructed to reduce emitted light (tinted or colored glass, or other material). No lighting may be placed within skylight wells. 5. All existing Blue Gum (E. globulus), Pink Ironbark (E. sideroxylon rosea), River Red Gum (E. camaldulensis), Swamp Gum (E. rudis), Honey Gum (E. melliodora), or Manna Gum (E. viminalis) eucalyptus trees on the property located within 150' of any structures or roadways shall be removed prior to final inspection of the new residence. Removal of eucalyptus trees shall take place between the beginning of August and the end of January to avoid disturbance of nesting birds protected under the Federal Migratory Bird Treaty Act (MBTA) and California Department of Fish and Game Code Section 3500 et seq unless a nesting bird survey is first conducted and there is a determination that there are no active nests within the tree. 6. After completion of rough framing or at least six (6) months prior to scheduling a final inspection, the applicant shall submit landscape screening and erosion control plans for review by the Site Development Committee. The application for landscape screening and erosion control shall be accompanied by the applicable fee and deposit. The plans shall be reviewed at a noticed public hearing. Attention shall be given to plantings which will be adequate to break up the view of the new residence from surrounding properties and streets. All landscaping required for screening purposes and for erosion control (as determined by the City Engineer) must be installed prior to final inspection of the new residence. The landscape screening plan shall comply with Section 10-2.809 (water efficient landscaping) of the Los Altos Hills Municipal Code. Staff Report to the Planning Commission Lands of Diligent Operations Ltd. 12930 La Cresta Drive April 7,2016 Page 7 of 12 7. Prior to beginning any grading operation, all significant trees, particularly the heritage oak trees, are to be fenced at the drip line. The fencing shall be of a material and structure (chain-link) to clearly delineate the drip line. Town staff must inspect the fencing and the trees to be fenced prior to commencement of grading. The property owner shall call for said inspection at least three days in advance of the inspection. The fencing must remain throughout the course of construction. No storage of equipment, vehicles or debris shall be allowed within the drip lines of these trees. Existing perimeter plantings shall be fenced and retained throughout the entire construction period. 8. Prior to requesting the final inspection, a registered civil engineer or licensed land surveyor shall certify in writing and state that "the location of the addition, including roof eaves, is no less than 20' from the side property line." The elevation of the addition shall be similarly certified in writing to state that "the elevation of the addition matches the elevation and location shown on the Site Development plan." The applicant shall submit the stamped and signed letter(s) to the Planning Department prior to requesting a final inspection. 9. Prior to requesting the final inspection, a registered civil engineer or licensed land surveyor shall certify in writing and state that "the height of the addition complies with the 27'-0" maximum structure height, measured as the vertical distance at any point from the bottom of the crawl space or basement ceiling if excavated below natural grade, to the highest part of the structure directly above (including roof materials)." The overall structure height shall be similarly certified in writing and state that "all points of the building (including chimneys and 'appurtenances) lie within a thirty-five (35') foot horizontal band based, measured from the lowest visible natural or finished grade topographical elevation of the structure along the building line and the highest topographical elevation of the roof of the structure." The applicant shall submit the stamped and signed letter(s) to the Planning Depar tment prior to requesting a final inspection. 10. The exterior color for the addition shall match the existing residence, or if the exterior color is changed, it shall have a light reflectivity value of 50 or less and roof materials shall have a light reflectivity value of 40 or less, per manufacturer specifications. All color samples shall be submitted to the Planning Department for approval prior to acceptance of plans for building plan check. All applicable structures shall be painted in conformance with the approved color(s)prior to final inspection. 11. Fire retardant roofing(Class A) is required for all new construction. 12. All properties shall pay School District fees to either the Los Altos School District or the Palo Alto Unified School District, as applicable,prior to acceptance of plans for building plan check. The applicant must take a copy of worksheet#2 to school district offices (both elementary and high school in the Los Altos School District), pay the appropriate fees and provide the Town with a copy of the receipts Staff Report to the Planning Commission Lands of Diligent Operations Ltd. 12930 La Cresta Drive April 7,2016 Page 8 of 12 13. The property owner shall grant an Open Space Easement to the Town over the lower portion of the property, beginning at the 414 foot contour, extending to the rear property line. No structures are permitted and no grading or fill shall be permitted. Native vegetation may be planted within the easement but no irrigation or sprinkler systems are permitted. The property owner shall provide legal description and plat exhibits that are prepared by a licensed land surveyor and the Town shall prepare the grant document. The grant document shall be signed and notarized by the property owner and returned to the Town prior to acceptance of plans for building permit. ENGINEERING DEPARTMENT: 14. Peak discharge at 12930 La Cresta Drive, as a result of Site Development Permit 140-14, shall not exceed the existing pre-development peak discharge value of the property. Detention storage must be incorporated into the project to reduce the predicted peak discharge to the pre-development value. Provide the data and peak discharge hydrologic model(s) utilized, as well as, the calculations of the peak discharge value prior and post development. Determine the design peak runoff rate for a 10-year return period storm and provide detention storage design plans to reduce the predicted peak discharge to the pre- development value. All documentation, calculations, and detention storage design (2 plan copies) shall be submitted for review and approval to the satisfaction of the City Engineer prior to acceptance of plans for building plan check. 15. The Engineer of Record shall observe the installation of the drainage system, construction of the energy dissipaters, and completion of the-grading activities and state that items have been installed and constructed per the approved plans. A stamped and signed letter shall be prepared and submitted to the Town prior to final inspection. 16. All hydrant use is strictly prohibited by the Purissima Hills Water District. A permit for obtaining water for grading and construction purposes must be obtained from the Purissima Hills Water District, and submitted for approval to the Town Engineering Department prior to acceptance of plans for building check. The permit will authorize the use of water from specific on-site or off-site water sources. 17. All public utility services serving this property shall be placed underground. The applicant should contact PG&E immediately after issuance of building permit to start the application process for undergrounding utilities which can take up to 6-8 months. 18. Any, and all, changes to the approved grading and drainage plan shall be submitted as revisions from the project engineer and shall first be approved by the Town Engineering Department. No grading shall take place during the grading moratorium (October 15 to April 15) except with prior approval from the City Engineer. No grading shall take place within ten feet of any property line except to allow for the construction of the driveway access. Staff Report to the Planning Commission Lands of Diligent Operations Ltd. 12930 La Cresta Drive April 7,2016 Page 9 of 12 19. Two copies of an erosion and sediment control plan shall be submitted for review and approval by the Engineering Department prior to acceptance of plans for building plan check. The contractor and the property owner shall comply with all appropriate requirements of the Town's NPDES permit relative to grading and erosion/sediment control. The first 100 feet of the driveway shall be rocked during construction and all cut and fill slopes shall be protected from erosion. All areas on the site that have the native soil disturbed shall be protected for erosion control during the rainy season and shall be replanted prior to final inspection. 20. The property owner shall inform the Town of any damage and shall repair any damage caused by the construction of the project to pathways, private driveways, and public and private roadways, prior to final inspection and release of occupancy permits and shall provide the Town with photographs of the existing conditions of the roadways and pathways prior to acceptance of plans for building plan check. 21. Two copies of a grading and construction operation plan shall be submitted by the property owner for review and approval by the City Engineer and Planning Director prior to acceptance of plans for building plan check. The grading/construction operation plan shall address truck traffic issues regarding dust, noise, and vehicular and pedestrian traffic safety on Deerfield Drive and surrounding roadways, storage of construction materials, placement of sanitary facilities, parking for construction vehicles, clean-up area, and parking for construction personnel. A debris box (trash dumpster) shall be placed on site for collection of construction debris. Arrangements must be made with the GreenWaste Recovery, Inc. for the debris box, since they have a franchise with the Town and no other hauler is allowed within the Town limits. 22. The property owner shall dedicate a 10 foot wide sanitary sewer easement along the existing sanitary sewer main line to the Town. The property owner shall provide legal description and plat exhibits that are prepared by a registered civil engineer or a licensed land surveyor and the Town shall prepare the dedication document. The dedication document, including the approved exhibits, shall be signed and notarized by the property owner and returned to the Town prior to acceptance of plans for building plan check. 23. The property owner shall be required to connect to the public sanitary sewer prior to final inspection. A sewer hookup permit shall be required by the Town's Public Works Department prior to acceptance of plans for building plan check. 24. The property owner shall construct a Type 2B pathway along the La Cresta Drive frontage to the satisfaction of the Engineering Department prior to final inspection. An encroachment permit shall be obtained from the Town's Public Works Department for all work within the public right-of-way,prior to start of work. Staff Report to the Planning Commission Lands of Diligent Operations Ltd. 12930 La Cresta Drive April 7,2016 Page 10 of 12 25. As recommended by Cotton, Shires & Associates, Inc., in their report dated November 17, 2015, the applicant shall comply with the following: a. Geotechnical Plan Review—The applicant's geotechnical consultant shall review and approve all geotechnical aspects of the project building and grading plans (i.e., site preparation and grading, site drainage improvements and design parameters for foundations, retaining walls and driveway) to ensure that their recommendations have been properly incorporated. The consultant shall verify their keying and benching recommendations for fill on slopes and should consider providing recommendations on keying and benching of engineered fill into bedrock and compaction of engineered fill to minimum 90 percent relative compaction. The consultant shall evaluate the location of the storm drain discharge on the slope with respect to potential slope instability and/or erosion. If appropriate the consultant shall provide a recommendation for alternative storm drain discharge location(s) and/or design. The results of the plan review shall be summarized by the geotechnical consultant in a letter and submitted to the Town Engineer for review prior to acceptance of plans for building plan check b. Geotechnical Construction Inspection—The geotechnical consultant shall inspect, test (as needed), and approve all geotechnical aspects of the project construction. The inspections should include, but not necessarily be limited to: site preparation and grading, site surface and subsurface drainage improvements, and excavations for foundations and retaining walls prior to the placement of steel and concrete. Encountered fault locations should be documented (and photographed) and adequate positioning of compressible materials should be confirmed. The results of these inspections and the as-built conditions of the project shall be described by the geotechnical consultant in a letter and submitted to the Town Engineer for review prior to final inspection. For further details on the above geotechnical requirements, please refer to the letter from Cotton, Shires &Associates, Inc., dated November 17, 2015. SANTA CLARA COUNTY FIRE DEPARTMENT: 26. An automatic residential fire sprinkler system approved by the Santa Clara County Fire Department shall be included in all portions of the building. Three sets of plans prepared by a sprinkler contractor shall be submitted to the Santa Clara County Fire Department Fire Prevention Division (16795 Lark Avenue, Suite 200, Los Gatos, CA 95032) for review and approval. The sprinklers shall be inspected and approved by the Fire Department,prior to final inspection and occupancy of the new residence. Staff Report to the Planning Commission Lands of Diligent Operations Ltd. 12930 La Cresta Drive April 7,2016 Page 11 of 12 27. The project is located within the designated Wildland Urban Interface Fire Area. Building construction shall comply with the provisions of California Building Code (CBC) Chapter 7A. Vegetation clearance shall be in compliance with CBC Section 701A.3.2.4 prior to final inspection. 28. The driveway shall be surfaced with asphalt, concrete or other engineer surface acceptable to the Fire Department. For alternative surfaces such as turf block the boundary edges of the alternate material shall be delineated as approved by the Fire Department. Delineation shall be by concrete curbs,borders,posts or other means that clearly delineate the location and extent of the driving surface. 29. Potable water supplies shall be protected from contamination cause by fire protection water supplies. It is the responsibility of the applicant and any contractors to contact the water purveyor supplying the site of such project, and to comply with the requirements of that purveyor. Such requirements shall be incorporated into the design of any water based fire protection systems, and/or fire suppression water supply systems or storage. 30. All construction shall comply with applicable provisions of the CFC Chapter 33 and Standard Detail and Specifications SI-7. 31. Approved numbers or addresses shall be placed on all new and existing buildings in such a position that it is plainly visible and legible from the street or road fronting the property. Numbers shall be a minimum of four-inches high with a minimum stroke width of 0.5 inch (12.7 mm) and shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. CONDITION NUMBERS 10, 12, 13, 14, 19, 20, 21, 22, 23 AND 25a SHALL BE COMPLETED AND SIGNED OFF BY THE ENGINEERING DEPARTMENT PRIOR TO ACCEPTANCE OF CONSTRUCTION PLANS FOR PLAN CHECK BY THE BUILDING DEPARTMENT. Project approval may be appealed if done so in writing within 22 days of the date of the hearing. The building permit cannot be issued until the appeal period has lapsed. The applicant may submit construction plans to the Building Department after the appeal period provided the applicant has completed all conditions of approval required prior to acceptance of plans for building plan check. Please refer to the Conditions of Project Approval set forth herein. If you believe that these conditions impose any fees, dedications, reservation or other exactions under the California Government Code Section 66000, you are hereby notified that these conditions constitute written notice of a statement of the amount of such fees, and/or a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest such fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. Staff Report to the Planning Commission Lands of Diligent Operations Ltd. 12930 La Cresta Drive April 7,2016 Page 12 of 12 Upon completion of the construction, a final inspection shall be required to be set with the Planning and Engineering Departments two weeks prior to final building inspection approval. NOTE: The Conditional Development Permit is valid for one year from the approval date (until April 7, 2017). All required building permits must be obtained within that year and work on items not requiring a building permit shall be commenced within one year and completed within two years. r.\\ ATTA Atm I3 2016 TOWN OF LOS AL FOS HILLS cka ARCHITECTS CONDITIONAL DEVELOPMENT PERMIT AND SITE DEVELOPMENT PLAN 12930 LA CRESTA DRIVE, LOS ALTOS HILLS. The proposed development encompasses the demolition of an existing single-family home and the construction of a new single-family home on approximately the same pad location of the removed. In all aspects of the design the intention has been to preserve the attractive qualities of the lot, those being its open natural atmosphere, the considerable vista and the verdant, semi-rural character. Site development minimization and design strategies have tried to follow closely the guidelines laid out in the town of LAH"Fast Track Guide for New Residences". While the site is quite steep, particularly in the lower half of the property, the removal of the existing home will create an adequate area to house the new development and minimize the impact of construction as much as possible. This siting of the proposed residence will maintain the minimal off-site view of the house from both La Cresta and Anacapa frontages.The intent to preserve much of the existing vegetation will help maintain the secluded character of the property despite the neighborhood's density.The proposed house design "steps"up the hillside—following the contour of the land while keeping within the height restrictions and utilizing more cut than fill. A considerable amount of the square footage of the house is nestled underground, minimizing visual impact to the neighborhood and allowing for efficient usage of space. East facing decks protect the lower floors from harsh sun while promoting grand views from social areas of the house. Where there are two story elements, they are set far back from the sightline of Anacapa Drive and largely hidden from La Cresta Drive by existing topography and vegetation. The consistent,minimally sloping roofs are intended to reduce the visual bulk of the house. The design also utilizes a portion of the existing driveway and its approach to the new house, including also a reduction of paved area compared to what exists. The intensity of the proposal is minimized by concentrating development on the existing building pad. This placement hides the house from public view, maximizes open space, conceals building bulk underground in the basement and maintains existing topography. The design of the structure has tried to strike a balance with the surrounding landscape and neighborhood.The proposed design will be minimially visible from La Cresta and Anacapa public views maintaining the status quo in relation to the immediate surroundings. The building mass steps down the hill in harmony with the existing topography. The design utilizes balconies and trellises along the side and rear of the house to soften the design's bulk while providing pristine outdoor social areas. These elements also help avoid large uninterrupted exterior walls.The garage is kept part of the main building in order to maximize open space around the house and distance between the proposed structure and neighboring properties. Earth tones and natural materials are proposed for the building's façade to minimize light reflection: earthen,pastel stucco, wood windows and stone with a dark metal roof. No exterior uplighting has been proposed. CHRIS KUMMERER & ASSOCIATES 650.233.0342 I CONTACT@CKA-ARCHITECTS 12089 AVY AVENUE,MENLO PARK CA 94025 I CKA-ARCHITECTS.COM PAGE 2 OF 2 Apart from the required removal of existing Eucalyptus trees,the desire is to keep much of the existing, mature vegetation, which will aid in screening the house from off-site view and help preserve the semi-rural character of the site. No grading is proposed within 10' of the property line. The concentration of the construction around the existing building pad ensures minimal alteration to the visible land forms as seen from Anacapa and La Cresta. No entry gate or columns are proposed nor fences along the roadways. A landscape architect and civil engineer are being employed to ensure both natural and technical drainage and erosion control measures are implemented. The proposed residence is designed to be in compliance with the regulations set forth by the town of Los Altos Hills. The design was conceived to be humble in its massing and natural in its appearance to complement the existing landscape and semi-rural setting. CHRIS KUMMERER & ASSOCIATES 650.233.0342 I CONTACT@CKA-ARCHITECTS 12089 AVY AVENUE.MENLO PARK CA 94025 I CKA-ARCHITECTS.COM reiCOTTON, SHIRES AND ASSOCIATES, INC. ATTACHMENT 4 CONSULTING ENGINEERS AND GEOLOGISTS November 17, 2015 L5335 TO: Suzanne Avila TOWN OF LOS ALTOS HILLS 26379 Fremont Road Los Altos Hills, California 94022 SUBJECT: Geotechnical Peer Review RE: Diligent Operations Ltd./Chan, New Residence #398-15-ZP-SD-GD-CDP 12930 La Cresta Drive • At your request, we have completed a geotechnical peer review of the subject building permit application using: • Engineering Geologic Sr Geotechnical Investigation, Chan Residence (Report),prepared by Murray Engineers, dated February 19,2015; • Architectural Plans (10 Sheets, various scales) prepared by CKA architects, dated October 28,2015; • Civil Plans (2 Sheets, various scales)prepared by Guiliani &Kull, Inc., dated October 21,2015;and • Topographic -Map (1 Sheet, 10 scale), prepared by L. Wade Hammond, dated April 25, 2014. In addition, we have reviewed pertinent documents, maps, and aerial photographs from our office files and completed a recent site reconnaissance. DISCUSSION Based on our review of the referenced documents received from the Town, we understand that the applicant proposes to demolish an existing residence and construct a new residence with basement near the location of the existing residence. According to the project grading plans, the proposed site grading will consist of approximately 1,545 cubic yards of cut and 41 cubic yards of fill. The remaining material generated during excavation will be hauled off site for disposal. Access to the proposed residence will be provided by a new driveway extending from La Cresta Drive. SITE CONDITIONS The proposed location of the new residence would be on an existing cut/fill pad near the southwestboundary of the property. Previous site grading has resulted in very steep to precipitous cut slopes (55 to 100 percent inclination) and steep to very steep fill slopes (40 to 78 percent inclination). Drainage at the site is characterized by sheet flow toward Anacapa Drive. Northern California Office Central California Office Southern California Office 330 Village Lane 6417 Dogtown Road 2804 Camino Dos Rios,Suite 201 Los Gatos,CA 95030-7218 San Andreas,CA 95249-9640 Thousand Oaks,CA 91320-1170 (408)354-5542 a Fax(408)354-1852 (209)736-4252 G Fax(209)736-1212 (805)375-1050•Fax(805)3754059 www.cottonshires.com Suzanne Avila November 17, 2015 Page 2 L5335 According to the Town Geologic Map, the southwest portion of the property is underlain by bedrock of the Ladera Sandstone, and the northeast portion is underlain by landslide debris. The proposed location of the new residence (in the southwest portion of theproperty) is within Geotechnical Hazard Zone A, which encompasses the hillside terrain outside of the defined geotechnical hazard zones. The northeast portion of the property is within Geotechnical Hazard Zone S, which is the Slope Instability Zone that encompasses mapped landslide deposits. Hazard mapping by the California Geological Survey places the entire subject property within an earthquake-induced landslide hazard zone. The mapped trace of the active San Andreas fault is located 3.8 miles (6.1 km) southwest of the site. The Monta Vista fault is located 0.5 miles (0.8 km) southwest of the site, and.the Berrocal fault is located 1.5 miles (2.4 km) southwest of the site. The Pulgas fault is located 1.3 miles (2.1 km)northeast of the site. The Project Geotechnical Consultant conducted a geotechnical investigation of the subject property,which included drilling seven exploratory borings near the location of the proposed new residence and within the downslope areas northeast of the residence. In the exploratory borings, the consultant encountered fill and/or colluvium over siltstone bedrock. Geotechnical laboratory testing conducted by the consultant has determined that the colluvium is highly expansive clay soil. CONCLUSIONS AND RECOMMENDED ACTION The proposed construction site is potentially constrained by potentially unstable ground conditions, compressible/creeping old fill and colluvium, expansive soil, and strong seismic ground shaking. To address these constraints, the Project Geotechnical Consultant has provided recommendations for 20-foot deep foundation piers with minimum embedment of 15 feet into bedrock. The consultant has provided recommendations for keying and benching of fill into "supportive material"which is not specified. The standard of care in the Town calls for keying and benching of fill into bedrock below the colluvium. Theconsultant should consider providing recommendations for keying and benching of all fill on slopes into bedrock. The consultant has provided recommendations for compaction of expansive subgrade material beneath hardscape to 87 to 90 percent relative compaction. The standard of care in the Town calls for compaction of all engineered fill material to a minimum 90 percent relative compaction. For conformance with the Town standards, the consultant should consider providing recommendations for minimum 90 percent relative compaction of all engineered fill. The project plans show that the proposed storm drain outfall is located in the northeast portion of the property where potential slope instability had been previously identified. The consultant should evaluate the location of the storm drain outfall to confirm that runoff will not result in slope instability or erosion. If necessary, the consultant should recommend an alternative storm drain outfall location(s). We recommend that the following Item 1 be satisfactorily addressed prior to issuance of building permits: We do not have geotechnical objections to the basic layout COTTON,SHIRES AND ASSOCIATES, INC. • Suzanne Avila November 17, 2015 Page 3 L5335 of site improvements and recommend geotechnical approval of the site development application. 1. Geotechnical Clarification and Plan Review — The Project Geotechnical Consultant should review and approve all geotechnical aspects of the project building and grading plans (i.e., site preparation and grading, building set-backs, site drainage improvements and design parameters for foundations, retaining walls and driveway) to ensure that their recommendations have been properly incorporated. The consultant should clarify their keying and benching recommendations for fill on slopes. The consultant should consider providing recommendations for keying and benching of engineered fill into bedrock. The consultant should also consider providing recommendations for compaction of all engineered fill to minimum 90 percent relative compaction. The consultant should evaluate the depicted location of the storm drain discharge on the slope with respect to potential slope instability and/or erosion. If appropriate, the consultant should provide a recommendation. for alternative storm drain discharge location(s) and/or design. The results of the geotechnical plan review should be summarized by the geotechnical consultant in a letter and submitted to the Town along with other documents for building permit plan-check. 2. Geotechnical Construction Inspections — The geotechnical consultant should inspect, test (as needed), and approve all geotechnical aspects of the project construction. The inspections should include, but not necessarily be limited to: site preparation and grading, site surface and subsurface drainage improvements, and excavations for foundations and retaining walls prior to the placement of steel and concrete. The results of these inspections and the as-built conditions of the project should be described by the geotechnical consultant in a letter and submitted to the Town Engineer for review prior to final (as-built) project approval. COTTON,SHIRES AND ASSOCIATES, INC. Suzanne Avila November 17, 2015 Page 4 L5335 LIMITATIONS This geotechnical peer review has been performed to provide technical advice to assist the Town with its discretionary permit decisions. Our services have been limited to review of the documents previously identified and a preparation of this letter. Our opinions and conclusions are made in accordance with generally accepted principles and practices of the geotechnical profession. This warranty is in lieu of all other warranties, either expressed or.implied. Respectfully submitted, COTTON, SHIRES AND ASSOCIATES,INC. TOWN GEOTECHNICAL CONSULTANT flA Philip L.Johns Supervising Engineering Geologist PG 6196, CEG 2019 Patrick O. Shires Senior Principal Geotechnical Engineer GE 770 PJ:POS:TS:st COTTON,SHIRES AND ASSOCIATES, INC. a '7'3 d4_ ,,,_,,,,, ATTAMENT 5 RECEIVED ENVIROMENTAL DESIGN and PROTECTION COMMITTEE ivut/ 0 ; 2Q? Application For: `7-ci_i_o ye.,,,Le,,,,.._, / v TOWN OFin.5A1��� t��„3 Applicant Name: `�!1 i Q - p V� ����± Address /2`7. *- '1_1-4_6-61—e-1 Reviewed by e .-e. - gam, `yzc,c_i Date: - D • z5 C^^MMENT�+ '..l::f:.3L: i7 Site Impact Lighting (--1'b-tet rj Gi -ham --FD Q c-h..+VG1 ) P-1 wy S-e.x-t, rho (,t, 'V€.- c, ( Jct 5kciUr k+ c,/1 ` 1. •- Noise i ( 2s e___ G 6;3 0:9 w.e,U 5 LAI t •'fi ,2_ k 1 Creeks S ,cc - � — Drainage cw:e- `11--9.-it -1"1— `11\A17--, c±an L1 e C�RAs IYe s- W -� I� � J Kc.<.3 17.E ye w, ove_o1 r e-1,, Easements i1-,2-• 1/36\4 Sr (,-),`( I 1/1 e-c1 1^^1'4-;� 6*Existing Vegitation j,e-f,.o .-1-L .,� �,,, - N,1 j k- _: - Mitigation wlw: Volunteer-LAH 4/6/15 ATTACHMENT 6 Suzanne Avila From: George Clifford <george@clifford.net> Sent: Tuesday, December 15, 2015 6:39 PM To: Suzanne Avila Cc: Nancy Couperus Subject: 12930 La Cresta Dr. Suzanne,. Two members of the Open Space Committee inspected the site at 12930 La Cresta Drive.At the December 10th OSC meeting,the Committee reviewed their findings and voted to submit the following recommendation: Recommendation: This property is very steep with a number of mature oak trees, and the lower portion of the site has an old landslide. The OSC recommends the Town ask for dedication of an open space easement below the 414 foot contour line at the northeast portion of the property extending to the edge of the property on Anacapa Dr. We also recommend an open space easement to the south side of the property for slopes greater than 30 percent. George Clifford Open Space Committee Co-chair 1 ATTACHMENT 7 Pathway Committee Meeting Date: November 23, 2015 File#: 398-15-ZP-SD-GD-CDP Applicant Name: Diligent Operations Limited Property Address: 12930 La Cresta Dr. Recommendation: In-Lieu Fee Construct Type II B Pathway Notes/comments: Construct a IIB pathway within the road right of way if the existing path is in the right-of-way. If not, then grant an easement for a roadside path and build the path on the easement. Dedicate pathway easement Notes/comments: Restore existing pathway Notes/comments: Other Notes/comments: