TOWN OF LOS ALTOS HILLS August 23, 2016
Staff Report to the Planning Commission
SUBJECT: APPEAL OF A SITE DEVELOPMENT PERMIT APPROVAL FOR A NEW
5,975 SQUARE FOOT TWO-STORY RESIDENCE INCLUDING A
SECOND UNIT AND GARAGE SPACE (MAXIMUM HEIGHT 26'6"), a
2,815 SQUARE FOOT BASEMENT, 480 SQUARE FOOT DETACHED
POOL HOUSE AND A SWIIVIMING POOL; LANDS OF ZEISLER AND
BAILEY; 25975 ALICANTE LANE; FILE#221-16-MISC.
FROM: Suzanne Avila,Planning Director a,
RECOMMENDATION: That the Planning Commission:
Uphold the.Fast-track approval of the Site Development Permit for the new residence with a
basement, second unit,pool house and pool subject to the conditions in Attachment#1.
BACKGROUND
The subject property is located on the north side of Alicante Lane, two lots east of Manuella
_ Road. The property is developed with a single-family residence,accessory building,volleyball
court,hardscape and pool. All existing improvements will be demolished as part of the project.
The property is relatively flat with an average slope of 5.2%. There are a number of large
mature trees on the site including three heritage oaks.
The project was approved at a Fast Track hearing on June 7,2016. The adjacent neighbors,Jo
Crosby and Consuelo Crosby,were in attendance and requested that the common property line
be staked and that some redwood trees located close to the common property line be removed.
On June 23,Ms. Crosby met with staff and re-reviewed the plans. At that meeting Ms. Crosby
indicated a preference to have the driveway moved to the opposite side of the property,where
it is currently located. The Crosbys are concerned about the new driveway being located in
close proximity to their home, and potential noise impacts and headlight intrusion from
vehicles entering and exiting the side facing garage.
CODE REQUIREMENTS
Pursuant to Section 10-2.301 of the Site Development Ordinance, a Site Development Permit
is required to construct a new residence. The project qualified for the Fast Track process based
on its conformance to setbacks, height requirements, allowable MDA and MFA, and
compliance with the Fast Track Guidelines.
Pursuant to Section 10-2.1305.1(b)(12)of the Municipal Code,any interested party may appeal
a decision of the Planning Director to the Planning Commission by filing a written notice of
Staff Report to the Planning Commission
Lands of Zeisler and bailey
25975 Alicante Lane •
August 23,2016
Page 2of11
appeal within 22 days of the decision. The Fast Track approval was appealed on June 29,2016
by Jo K. Crosby(see Attachment 2).
DISCUSSION
•
Site Data:
Gross Lot Area: 1.076 acres
Net Lot Area: 1.076 acres
, Average Slope: 5.2%
Lot Unit Factor: 1.076
Area Maximum Proposed Existing Increase Remaining
Development 16,140 15,145 16,874 -1,729 995
Floor 6,456 6,454* 6,455 2 1
*excludes 2,815 sq.ft. basement
Site and Architecture
The project includes a 4,957 square foot two-story residence that includes a second unit, an
831 square foot attached garage,2,815 square foot basement, a pool and a 480 square foot pool
house. The proposed residence complies with all setbacks, floor area, development area, and
height requirements as well as the Grading and Outdoor Lighting Policies.
Exterior materials for the new residence and pool house include cedar shingle siding, stone
veneer and wood trim,metal railings and wood shingle roofing(see elevations on sheets A2.3,
A4.1 and A4.2 of the development plans, Attachment 7).
The residence will be 26'6" at its highest point where a maximum of 27 feet is allowed. The
pool house will be 14'11". The roof of the new residence has been designed to accommodate
solar photovoltaic panels. Story poles were installed prior to the June 7, 2016 Fast Track
meeting and are still in place for the Commission's review.
Driveway&Parking
A total of five parking spaces are required for the new residence and second unit (au pair
quarters). The plans include attached one-car and two-car garageswith side facing entries.
The one-car garage is 38'6" from the east property line and the two-car garage is 36'6" from
the property line. The driveway is 10'6" from the property line (a minimum of 10 feet is
required). In addition to the garage parking, there are three uncovered guest spaces on the
north side of the garage (see sheets A1.0 and A2.1 of the development plans).
Staff Report to the Planning Commission
Lands of Zeisler and bailey
25975 Alicante Lane
August 23,2016
Page 3 of 11
Outdoor Lighting
Outdoor lighting locations are shown on the floor plans (sheets A2.1 and A2.3 of the
development plans). Condition#9 requires that fixtures be down lights, shielded and/or have
frosted or opaque glass. The applicant is required to submit landscape lighting details with the
required landscape screening plan.
Grading&Drainage
The Engineering Department reviewed the project civil engineering plans and determined that
the proposal complies with the Grading Policy and the Town's drainage standards. Grading
quantities include the following:
• 2,305 cubic yards of cut
• 205 cubic yards of fill
• 2,100 cubic yards export
The site grading and cut are primarily for the basement and pool excavation. There is also
some grading for the pool deck pool house and driveway.
Geotechnical Review
Geotechnical peer review was not required for this project since the property is located in Zone
A and the slope is less than 15%.
Trees &Landscaping
The site is well landscaped with a mix of native and imported trees that includes olive, Chinese
pistache, birch,mayten, redwood, flowering pear and coast live oak. There are three heritage
oaks on the property. One is located in the southwest corner of the front yard and two are in
the rear yard. One of the oaks is located among a group of three redwoods that are proposed
to be removed. Care will need to be taken when removing the redwoods in order to preserve
the oak. The project arborist recommends pruning of this oak to lighten the heavy lateral limbs
In addition to the removal of the three redwoods, some smaller trees will be removed (three
birch,two crabapples, one photinia and one Irish yew tree). '
Condition#3 requires the applicant to submit a landscape plan once the new residence has been
framed. The need for replacement trees and landscape screening will be evaluated at that time.
Staff Report to the Planning Commission
Lands of Zeisler and bailey
25975 Alicante Lane
August 23,2016
Page 4 of 11
Green Building Ordinance
The applicant has submitted a GreenPoint checklist in compliance with the Town's Green
Building Ordinance. The project is designed to achieve a minimum of 78 points (50 points is
required for certification).
Fire Depaitaient Review
The Santa Clara County Fire Department reviewed the plans and has required that the buildings
be equipped with fire sprinklers (see Attachment 5). The property is located outside the
Wildland Urban Interface Zone. Fire Department requirements have been included as
conditions#30 through#33.
Sanitation
The new residence will connect to the existing sewer line. No additional easements are
required.
Committee Review
The Pathways Committee recommended payment of a pathway in-lieu fee (Condition#29).
The Environmental Design and Protection Committee commented that existing heritage oaks
should be fenced and protected during construction. Condition #5 requires protective tree
fencing and includes a provision requiring the project arborist's recommendations to be
implemented.
APPEAL
The appellant is requesting that the project be redesigned to locate the driveway on the west
side of the property where it is currently. The appellant states that the location of the garage
and its proximity to their home will result in noise and light intrusion into the living room and
master bedroom. The appellant does not believe that additional landscaping will adequately
screen the new development from their home, nor would it abate the light and noise concerns.
The applicant's complete appeal statement is included as Attachment 2.
Municipal Code Section 10-1.505(a) allows driveway and necessary backup area to be located
within setbacks. Section 10-2.407 specifies that no grading is permitted within ten feet of
property lines,hence the requirement for driveways and backup areas to have at least a 10 foot
setback. There is an existing hedge along the east property line that is relatively dense and a
row of redwood trees that extend from the end of the hedge to the front property line. There
is also a solid wood fence on the common property line that extends to the front edge of the
existing house. Retaining the wood fence and augmenting the existing trees and shrubs
Staff Report to the Planning Commission
Lands of Zeisler and bailey
25975 Alicante Lane
August 23,2016
Page 5 of 11
between the two properties with evergreen shrubs would improve the screening and eliminate
or reduce any light intrusion from exterior lighting or vehicles.
At the Fast Track hearing the Crosbys requested that the applicant remove the redwood trees
along the east property line. These trees provide screening from the second floor of the Crosby
residence, and if removed,would exacerbate the situation(light and noise intrusion).
PUBLIC COMMENT
Notice of the Planning Commission hearing was mailed to property owners within 500 feet of
the subject property. Other than the appellant's statement, no other written comments have
been received, and staff has not been contacted by any other interested party.
ENVIRONMENTAL CLEARANCE(CEQA)
The proposed single family residence and secondary dwelling unit are categorically exempt
from the provisions of the California Environmental Quality Act per Section 15303(a) which
allows for the construction of a new single family residence and secondary unit in a residential
zone.
ATTACHMENTS
1. Recommended conditions of approval (six pages)
2. Appeal statement(two pages), received June 29, 2016
3. June 7, 2016 Fast Track Hearing Report(one page)
4. June 7, 2016 Fast,Track Fact Sheet(one page)
5. Fire Department comments (three pages total), received April 7 and May 4, 2016
6. Arborist Report(eight pages),received March 18, 2016
7. Development Plans—Planning Commission only
Staff Report to the Planning Commission ATTACHMENT 1
Lands of Zeisler and bailey
25975 Alicante Lane
August 23,2016
Page 6 of 11
ATTACHMENT 1
RECOMMENDED CONDITIONS FOR SITE DEVELOPMENT PERMIT FOR A NEW
RESIDENCE WITH BASEMENT, SECOND UNIT, POOL HOUSE AND POOL
LANDS OF ZEISLER AND BAILEY; 25975 ALICANTE LANE
File#94-16-ZP-SD-CDP
PLANNING DEPARTMENT:
1. No other modifications to the approved plans are allowed except as otherwise first reviewed
and approved by the Planning Director or the Planning Commission,depending on the scope
of the changes.
2. All existing Blue Gum (E. globulus), Pink Ironbark (E. sideroxylon rosea), River Red Gum
(E. camaldulensis), Swamp Gum(E.rudis), Honey Gum(E.melliodora), or Manna Gum(E.
viminalis) eucalyptus trees on the property located within 150' of any structures or roadways
shall be removed prior to final inspection of the new residence. Removal of eucalyptus trees
shall take place between the beginning of August and the end of January to avoid disturbance
of nesting birds protected under the Federal Migratory Bird Treaty Act (MBTA) and
California Department of Fish and Game Code Section 3500 et seq unless a nesting bird survey
is first conducted and there is a determination that there are no active nests within the tree.
3. After completion of rough framing or at least six (6) months prior to scheduling a final
inspection, the applicant shall submit landscape screening and erosion control plans for
review by the Site Development Committee. The application for landscape screening and
erosion control shall be accompanied by the applicable fee and deposit. The plans shall be
reviewed at a noticed public hearing. Attention shall be given to plantings which will be
adequate to break up the view of the new residence from surrounding properties and streets.
All landscaping required for screening purposes and for erosion control (as determined by
the City Engineer) must be installed prior to final inspection of the new residence. The
landscape screening plan shall comply with Section 10-2.809 (water efficient landscaping)
of the Los Altos Hills Municipal Code.
4. A landscape maintenance deposit in the amount of $5,000 shall be posted prior to final
inspection.An inspection of the landscape to ensure adequate establishment and maintenance
shall be made two years after the installation. The deposit will be released at that time if the
plantings remain viable.
5. Prior to beginning any grading operation, all significant trees, particularly the heritage oak
trees, are to be fenced at the drip line. The fencing shall be of a material and structure(chain-
link) to clearly delineate the drip line. Town staff must inspect the fencing and the trees to
be fenced prior to commencement of grading. The property owner shall call for said
Staff Report to the Planning Commission
Lands of Zeisler and bailey
25975 Alicante Lane
August 23,2016
Page 7 of 11
inspection at least three days in advance of the inspection. The fencing must remain
throughout the course of construction. No storage of equipment, vehicles or debris shall be
allowed within the drip lines of these trees. Existing perimeter plantings shall be fenced and
retained throughout the entire construction period. The project arborist recommendations
shall be implemented during construction (refer to the March 17, 2016 report from Kielty
Arborist Services.
6. A registered civil engineer or licensed land surveyor shall certify in writing and state that
"the location of the new residence,roof eaves, and swimming pool are no less than 40' from
the front property line and 30' from the side and rear property lines." The elevation of the
new residence shall be similarly certified in writing to state that "the elevation of the new
residence matches the elevation and location shown,on the Site Development plan." The
applicant shall submit the stamped and signed letter(s) to the Planning Department prior to
requesting a final inspection.
7. Prior to requesting the final inspection, a registered civil engineer or licensed land surveyor
shall certify in writing and state that"the height of the new residence complies with the 27'-
0"maximum structure height,measured as the vertical distance at any point from the bottom
of the crawl space or basement ceiling if excavated below natural grade, to the highest part
of the structure directly above(including roof materials)." The overall structure height shall
be similarly certified in writing and state that"all points of the building(including chimneys
and appurtenances) lie within a thirty-five (35') foot horizontal band based, measured from
the lowest visible natural or finished grade topographical elevation of the structure along the
building line and the highest topographical elevation of the roof of the structure." The
applicant shall submit the stamped and signed letter(s) to the Planning Department prior to
requesting a final inspection.
8. Exterior finish colors of all buildings shall have a light reflectivity value of 50 or less and roof
materials shall have a light reflectivity value of 40 or less,per manufacturer specifications. All
color samples shall be submitted to the Planning Department for approval prior to acceptance
of plans for building plan check. All applicable structures shall be painted in conformance
with the approved color(s)prior to final inspection.
9. Lighting is approved as shown on the plans. No lighting may be placed within setbacks
except two entry or driveway lights. Lighting shall be down directed, shielded fixtures, or
have frosted or opaque glass in compliance with the Town's Outdoor Lighting Policy. Any
additional outdoor lighting shall be approved by the Planning Department prior to
installation.
10. No new fencing is approved. Any new fencing or gates shall require review and approval by
the Planning Department prior to installation.
Staff Report to the Planning Commission
Lands of Zeisler and bailey
25975 Alicante Lane
August 23,2016
Page 8of11
11. Skylights, if utilized, shall be designed and constructed to reduce emitted light (tinted or
colored glass, or other material). No lighting may be placed within skylight wells.
12. Fire retardant roofing(Class A) is required for all new construction.
13. The project is subject to the Town's Construction Time Limit Ordinance (Chapter 10, Title
VIII of the Municipal Code). The maximum time for completion of the new residence shall
be 36 months from the date of Building Permit issuance. Failure to complete the project in
the allotted time may result in substantial penalties and fees.\
14. Standard swimming pool conditions:
a. Lights shall be designed so that the source is not visible from off-site.
b. Drainage outfall structures shall be constructed and located to the satisfaction of the
City Engineer.
c. Pool equipment shall be enclosed on all four sides with a roof for noise mitigation and
screening.
15. For swimming pools, at least one of the following safety features shall be installed to the
satisfaction of the Town Building Official:
a. The pool shall be isolated from access to the residence by an enclosure(fencing).
b. The pool shall be equipped with an approved safety pool cover.
c. The residence shall be equipped with exit alarms on those doors providing direct access
to the pool.
d. All doors providing direct access from the home to the swimming pool shall be
equipped with a self-closing, self-latching device with a release mechanism placed no
lower than 54 inches above the floor.
16. At time of submittal of plans for building plan check, the applicant shall submit one of the
following checklists to demonstrate compliance with the Town's Green Building Ordinance:
a. A GreenPoint Rated checklist with the building permit application to indicate that the
project will achieve a minimum of fifty (50) points. The checklist shall be completed
by a qualified green building professional and shall be attached to the front of the
construction plans. The construction plans shall include general notes or individual
detail drawings,where feasible,showing the green building measure to be used to attain
• the required points.
b. A LEED for Homes checklist with the building permit application to indicate that the
project will achieve a minimum of forty-five (45) points or LEED certification. The
checklist shall be completed by a qualified green building professional and shall be
attached to the front of the construction plans. The construction plans shall include
general notes or individual detail drawings,where feasible, showing the green building
measure to be used to attain the required points.
Staff Report to the Planning Commission
Lands of Zeisler and bailey
25975 Alicante Lane
August 23,2016
Page 9 of 11
17. Prior to final inspection and occupancy, a qualified green building professional shall provide
documentation verifying that the building was constructed in compliance with GreenPoint
Rated or LEED®certification.
18. All properties shall pay School District fees to either the Los Altos School District or the
Palo Alto Unified School District, as applicable,prior to acceptance of plans for building
plan check. The applicant must take a copy of worksheet#2 to school district offices (both
elementary and high school in the Los Altos School District), pay the appropriate fees and
provide the Town with a copy of the receipts.
ENGINEERING DEPARTMENT:
19. Peak discharge at 25975 Alicante Lane, as a result of Site Development Permit 94-16, shall
not exceed the existing pre-development peak discharge value of the property. Detention
storage must be incorporated into the project to reduce the predicted peak discharge to the
pre-development value. Provide the data and peak discharge hydrologic model(s) utilized,
as well as, the calculations of the peak discharge value prior and post development.
Determine the design peak runoff rate for a 10-year return period storm and provide detention
storage design plans to reduce the predicted peak discharge to the pre-development value.
All documentation, calculations, and detention storage design (two plan copies) shall be
submitted for review and approval to the satisfaction of the City Engineerprior to acceptance
of plans for building plan check.
20. The Engineer of Record shall observe the installation of the drainage system, construction of
the energy dissipaters,and completion of the grading activities and state that items have been
installed and constructed per the approved plans. A stamped and signed letter shall be
prepared and submitted to the Town prior to final inspection.
21. All hydrant use is strictly prohibited by the Purissima Hills Water District. A permit for
obtaining water for grading and construction purposes must be obtained from the Purissima
Hills Water District, and submitted for approval to the Town Engineering Department prior
to acceptance of plans for building plan check. The permit will authorize the use of water
from specific on-site or off-site water sources.
22. Any, and all, changes to the approved grading and drainage plan shall be submitted as
revisions from the project engineer and shall first be approved by the Town Engineering
Department. No grading shall take place during the grading moratorium(October 15 to April
15) except with prior approval from the City Engineer. No grading shall take place within
ten feet of any property line except to allow for the construction of the driveway access.
23. Two copies of an Erosion and Sediment Control plan shall be submitted for review and
approval by the Engineering Department prior to acceptance of plans for building plan
check. The contractor and the property owner shall comply with all appropriate requirements
of the Town's NPDES permit relative to grading and erosion/sediment control. The first 100
feet of the driveway shall be rocked during construction and all cut and fill slopes shall be
Staff Report to the Planning Commission
Lands of Zeisler and bailey
25975 Alicante Lane
August 23,2016
Page 10of11
protected from erosion. All areas on the site that have the native soil disturbed shall be
protected for erosion control during the rainy season and shall be replanted prior to final
inspection.
24. All public utility services serving this property shall be placed underground. The applicant
should contact PG&E immediately after issuance of building permit to start the application
process for undergrounding utilities which can take up to 6-8 months.
25. Two copies of a Grading and Construction Operation plan shall be submitted by the property
owner for review and approval by the City Engineer and Planning Director prior to
acceptance of plans for building plan check. The grading/construction operation plan shall
address truck traffic issues regarding dust, noise, and vehicular and pedestrian traffic safety
on Alicante Lane and surrounding roadways, storage of construction materials,placement of
sanitary facilities, parking for construction vehicles, clean-up area, and parking for
construction personnel. A debris box (trash dumpster) shall be placed on site for collection
of construction debris. Arrangements must be made with the GreenWaste Recovery, Inc. for
the debris box, since they have a franchise with the Town and no other hauler is allowed
within the Town limits.
26. The property owner shall inform the Town of any damage and shall repair any damage caused
by the construction of the project to pathways, private driveways, and public and private
roadways, prior to final inspection and release of occupancy permits and shall provide the
Town with photographs of the existing conditions of the roadways and pathways prior to
acceptance of plans for building plan check.
27. The property owner shall provide a copy of the Residential Service Design Load Information
to the Public Works Department prior to acceptance of plans for building plan check.
28. To ensure the existing sewer lateral is in good condition/and water tight, the Town requires
a water pressure test and a video inspection to be conducted on the entire section of existing
lateral from house to sewer main prior to final sign-off from Public Works. The owner is
responsible for providing necessary cleaning and/or repairs within the lateral and at the
connection if a defect is found. The inspection video (Windows media format or equivalent)
and related proof of repairs shall be submitted to the Public Works Department for review
and approval.
29. The property owner shall pay a pathway fee of$53.00 per linear foot of the average width of
the property prior to acceptance of plans for building plan check.
FIRE DEPARTMENT:
30. An automatic residential fire sprinkler system approved by the Santa Clara County Fire
Department shall be included in all portions of the building. Three sets of plans prepared by a
sprinkler contractor shall be submitted to the Santa Clara County Fire Department(16795 Lark
Staff Report to the Planning Commission
Lands of Zeisler and bailey
25975 Alicante Lane
August 23,2016
Page 11 of 11
Avenue, Los Gatos, CA 95032) for review and approval. The sprinklers shall be inspected and
approved by the Fire Department,prior to final inspection and occupancy of the new residence.
31. All construction sites must comply with applicable provisions of the CFC Chapter 14 and
standard detail and specifications SI-7.
32. Potable water supplies shall be protected from contamination cause by fire protection water
supplies. It is the responsibility of the applicant and any contractors to contact the water
purveyor supplying the site of such project, and to comply with the requirements of that
purveyor. Such requirements shall be incorporated into the design of any water based fire
protection systems, and/or fire suppression water supply systems or storage.
33. Approved numbers or addresses shall be placed on all new and existing buildings in such a
position as to be plainly visible and legible from the street or road fronting the property.
Numbers shall contrast with their background.
CONDITION NUMBERS 8, 18, 19, 21, 24,25, 26, 27 and 29 SHALL BE COMPLETED AND
SIGNED OFF BY THE PLANNING DEPARTMENT AND THE ENGINEERING
DEPARTMENT PRIOR TO ACCEPTANCE OF CONSTRUCTION PLANS FOR PLAN
CHECK BY THE BUILDING DEPARTMENT.
Project approval maybe appealed if done so in writing within 22 days of the date of the approval.
The building permit cannot be issued until the appeal period has lapsed. The applicant may submit
construction plans to the Building Department after the appeal period provided the applicant has
completed all conditions of approval required prior to acceptance of plans for building plan check.
Please refer to the Conditions of Project Approval set forth herein. If you believe that these
Conditions impose any fees, dedications, reservation or other exactions under the California
Government Code Section 66000, you are hereby notified that these Conditions constitute written
notice of a statement of the amount of such fees, and/or a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90-day approval period
in which you may protest such fees, dedications, reservations, and other exactions, pursuant to
Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day
period complying with all of the requirements of Section 66020, you will be legally barred from
later challenging such exactions.
Upon completion of the construction, a final inspection shall be required to be set with the
Planning and Engineering Departments two weeks prior to final building inspection approval.
NOTE: The Site Development permit is valid for one year from the approval date (until August
23, 2017). All required building permits must be obtained within that year and work on items not
requiring a building permit shall be commenced within one year and completed within two years.
ATTACHMENT 2
Statement for Application for Appeal
On the Proposed Demolition and Rebuild 'JUN 2 9 2016
Of the Existing Residence located at
25975 Alicante Lane, Los Altos Hills, CA TOWN OF LOS ALTOS HILLS
Per the discussion, on Thursday, June 23, 2016 at 3:30pm., between Consuelo C.E.
Crosby, Co-Trustee of the residence at 25959 Alicante Lane,Los Altos Hills, and
Suzanne Avila,Planning Director of the Town of Los Altos Hills, an agreement was
reached that would permit additional supporting documentation towards this appeal to
be submitted up to within a week of the yet to be scheduled Planning Commission
meeting in August 2016.
The intent of this appeal for the demolition of the existing residence and pool house,
located at 25975 Alicante Lane,Los Altos Hills, CA, is to revise the proposed design of
the new house such that the integrity of privacy,noise mitigation and value of our
residence is maintained in keeping with the rural atmosphere of Los Altos Hills.
Alicante Lane is an intimate cul-de-sac with 7 existing houses.All but one of the seven
was built in close time frame during the 1980's and each honored the intimate feel of the
neighborhood. The newest house, located at 26023 Alicante Lane,honored the privacy of
adjacent neighbors by situating the house and separate garage structure such that the main
areas of the neighboring homes were protected from the intrusion of moving vehicles,
including lights,noise, alarms,garage door noise and vehicles parked off street.
Such is not the case with the proposed new residence at 25975 Alicante Lane. The
existing condition of the residence has the,garage located approximately 100 feet away
from adjacent neighbors.Upon entering the driveway,the lights of moving vehicles
would only shine in the Owner's residence and no other neighbors.The existing garage
and neighboring bedrooms and main living areas are situated with significant distance
such that noise and lights of moving vehicles and garage activities are mitigated. Vehicles
parked in the driveway are only visible from across the street, as in our own situation
with our neighbors at 25980 Alicante Lane.
The residential design of 26023 Alicante Lane was created by Pacific Peninsula
Architecture, who are currently contracted for the new residential design at 25975
Alicante Lane. It can be assumed that the architecture firm has knowledge of the rural
intent of both the Town and street such that a design could be created to maintain this
atmosphere.
The new proposal for the reconstructed house plans to place the driveway adjacent to our
main Living Room and Master Bedroom. Given that our house is naturally elevated
above 25975 Alicante Lane,the main rooms look upon the proposed driveway location,
including parked vehicles and garbage bins.Noise from the proposed garage location and
off street parking locations would immediately impact our Master Bedroom,Living
Room and Dining Room.New landscape design options would not be able to screen both
noise and lights from the proposed garage and driveway vehicles.
However, if the proposed home at 25975 Alicante Lane were to maintain the location of
the new garage in close proximity to its existing location,then neither we nor any other
neighbor would be affected by the change in design of the newly proposed residence.
This would support the Town's goals, as stated in their Fast Track Guide for New
Residences, to design homes that"respect your neighbors' privacy and views".
The quick approval by the Planning Director could be viewed as an oversight during the
Fast Track process of checking items off the minimal requirement list residential design
rather than supporting the goals of the Town to maintain the residential monetary value
and aesthetic as stated in their own publications. The Town requires a minimum 1 acre
lost size in order to support these goals. Additionally,the devaluation of the Town's
multi-million dollar homes, even by 5%, could cost an Owner hundreds of thousands of
dollars in comparison to the fee to revise the proposed design of the new residence at
25975 Alicante Lane.
Thus,we appeal the proposed design for the newly rebuilt house in order to maintain the
existing privacy, intimacy,views and value of our existing house and neighborhood.
Additional supporting evidence,research and legal documentation will be submitted
per our agreement with Suzanne Avila,Planning Director with the Town of Los
Altos Hills.
ATTACHMENT 3
Town Of Los Altos Hills June 7, 2016
Fast Track Hearing Fact Sheet
Project Description: New residence with basement, second unit, cabana and swimming pool
File Number: 94-16-ZP-SD-GD
Address: 25975 Alicante Lane
Owner(s): , John Zeisler and Jennifer Bailey
Staff Planner: Suzanne Avila, Planning Director
Site Data
Net Lot Area: 1.076 acre
Average Slope: 5.2%
Lot Unit Factor: 1.076
Floor and Development Area(square footage):
Area Type Maximum Existing Proposed Increase Remaining
Development 16,140 16,874 15,145 -1,729 995
Floor 6,456 6,453 6,455 2 1
*Excludes 2,815 sq. ft.basement
Height: Maximum Proposed
On Vertical Plane 27' 26'6"
Lowest to Highest 35' 26'6"
Setbacks: Minimum Proposed
Front 40 ft. 40 ft. l
Side 30 ft. 30 ft.
'Side 30 ft. 36 ft.
Rear 30 ft. 170 ft.
Exterior Materials: Cedar shingle siding,stone veneer and wood trim,metal railings,wood shingle roof
Parking: Required spaces: 4, out of setbacks.
Proposed: 46(3 garage/3 uncovered space)
Green Point Rated: 78
Fast Track Points: 4
Grading: Cut: 900-CY Fill: 350-CY Export: 550-CY
Sewer/Septic: • Sewer
Environmental Design and Protection Committee: Protect heritage oaks during demolition and
construction, and when nearby Redwoods are being removed (tree fencing required by condition of
approval).
Open Space Committee: n/a
Pathways Committee: Payment of a pathway in lieu fee of$53.00 per linear foot of the average
width of the property(included as a condition of approval).
ATTACHMENT 4
Town Of Los Altos Hills June 7, 2016
Fast Track Hearing Report
Project Description: New residence with basement, second unit, cabana and pool
File Number: 94-16-ZP-SD-GD
Site Address: 25975 Alicante Lane
Owner(s): John Zeisler and Jennifer Bailey
Staff Planner: Suzanne Avila, AICP, Planning Director
Attendance:
Suzanne Avila, Planning Director
Genevieve Fernandez, Assistant Planner
Evan Kort, Planning Intern
Carol Gottlieb, Environmental Design &Protection Committee
John Zeisler, owner/applicant
Jude Kirik, Pacific Peninsula Architecture
Eric Peterson, Pacific Peninsula Architecture
Consuelo Crosby, neighbor
Jo K. Crosby, neighbor
Environmental Design Committee Comments: Protect heritage oaks during demolition and
construction(condition of approvalrequires protective tree fencing).
Pathways Committee Comments: Requested payment of a pathway in-lieu fee (included as
a condition of approval).
Neighbor Comments: Want to ensure compliance with minimum required setbacks
(requested that the common property line be staked),and would like to have the redwoods near
the common property line removed as they are damaging property.
Project Issues: Location (setbacks) and height of new structures will be certified. The
applicant may remove the redwood trees located near the common property line.
Conditions of Approval:
• Standard conditions of approval recommended.
Planning Director Approval:
File#94-16-ZP-SD-GD(Lands of Zeisler and Bailey)has been approved by Fast-track Review
on June 7, 2016 subject to the attached conditions.
L6 / / l Co
Suzanne Avila`, Planning Director Date
Project plans are available for review at the Town of Los Altos Hills Planning Department,
26379 Fremont Road. Phone for information: 650.941.7222.
cLARA
,s.t" °�� ATTAC � �.� T 5
FIRE DEPARTMENT a fFAI
LFIRE SANTA CLARA COUNTY
14700 Winchester Blvd., Los Gatos, CA 95032-1818 .
CUUflTE5Yd SERVICE (408) 378-4010 •(408) 378-9342 (fax) •wwww.sccfd.orgPLAN „
REVIEW No. 16. 1355
BLDG
DEVELOPMENTAL REVIEW COMMENTS PERMIT No.
Review of a proposed new 8,603 square-foot two-story single-family residence with basement,
attached garage,and 480 square-foot detached habitable pool house.
Comment #1: Plans Approved. OK to issue Building Permit.
City PLANS SPECS NEW RMDL AS OCCUPANCY CONST.TYPE ApplicantName DATE PAGE
LAH ® 0 ® 0 0 SFR V-B Pacific Peninsula Architecture 05/04/2016 1
OF 1
SEC/FLOOR AREA LOAD PROJECT DESCRIPTION PROJECT TYPE OR SYSTEM
see plans see plans Residential Development Design Review
NAME OF PROJECT LOCATION
ZEISLER-BAILEY.RESIDENCE 25975 Alicante Lane Los Altos Hills .
TABULAR FIRE FLOW REDUCTION FOR FIRE SPRINKLERS REQUIRED FIRE FLOW @ 20 PSI BY
2500 50% . 1500 Harding,Doug
Organized as the Santa Clara County Central Fire Protection District
Serving Santa Clara County and the communities of Campbell, Cupertino,Los Altos,
Los Altos Hills,Los Gatos,Monte Sereno,and Saratoga
•
G1,ARA
�ty' 1 06, FIRE. DEPARTMENT ice,:'
FIRE _ ) SANTA CLARIA COUNTY
EST:19x7'.• J010.00
14700 Winchester Blvd., Los Gatos, CA 95032-1818
COURTESY a SERVICE (408) 378-4010 •(408) 378-9342 (fax) •www.sccfd.org
REVIEW PLAN 16 U923
BLDG
DEVELOPMENTAL REVIEW COMMENTS PERMIT No.
Review of a proposed new 8,603 square-foot two-story single-family residence with basement,
:attached garage, and 480 square-foot detached habitable pool house.
Comment #1: Review of this Developmental proposal is limited to acceptability of site access and
water supply as they pertain to fire department operations, and shall not be construed as a
substitute for formal plan review to determine compliance with adopted model codes. Prior to
performing any work the applicant shall make application to, and:receive from,the Building
Department all applicable construction permits.
;Comment #2: Fire Sprinklers Required: for both the primary residence and the pool house An
automatic residential fire sprinkler system shall be installed in one- and two-family dwellings as
:follows: In all new one- and two-family dwellings and in existing one- and two-family dwellings
when additions are made that increase the building area to more than 3,600 square feet. Exception: A
one-time addition to an existing building that does not total more than 1,000 square feet of building
'area. NOTE:The owner(s),occupant(s) and any contractor(s) or subcontractor(s)are responsible for
consulting with the water purveyor of record in order to determine if any modification or upgrade of the existing
water service is required.A State of California licensed(C-16)Fire Protection Contractor shall submit plans,
calculations, a completed permit application and appropriate fees to this department for review and approval prior.
to beginning their work. CRC Sec.313.2 as adopted and amended by LAHMC
Comment #3: Water Supply Requirements:Potable water supplies shall be protected from contamination
caused by fire protection water supplies.It is the responsibility of the applicant and any contractors and
subcontractors to contact the water purveyor supplying the site of such project, and to comply with the
requirements of that purveyor.Such requirements shall be incorporated into the design of any water-based fire
protection systems, and/or fire suppression water supply systems or storage containers that may be physically
connected in any manner town appliance capable of causing contamination of the potable water supply
of the purveyor of record.Final approval of the system(s)under consideration will not be granted by this office
until compliance with the requirements of the water purveyor of record are documented by that
purveyor as having been met by the applicant(s).2010 CFC Sec.903.3.5 and Health and Safety Code 13114.7
•
City PLANS SPECS NEW RMDL AS OCCUPANCY CONST.TYPE AppllcantName DATE PAGE
LAH ® 0 ® 0 0 SFR V-B Pacific Peninsula Architecture RdC %/2016 1 of 2
SEC/FLOOR AREA LOAD PROJECT DESCRIPTION PROJECT TYPE OR SYSTEM
see plans see plans Residential Development Design ReviglgR A +d 2016
NAME OF PROJECT LOCATION
ZEISLER-BAILEY RESIDENCE 25975 Alicante Lane Los Altos Hills i"O J®S
TABULAR FIRE FLOW REDUCTION FOR FIRE SPRINKLERS REQUIRED FIRE FLOW @ 20 to Of HI IS
2500 50% 1500 Harding,Doug
Organized as the,Santa Clara County Central Fire Protection District
Serving Santa Clara County and the communities of Campbell, Cupertino, Los Altos,
Los Altos Hills,Los Gatos, Monte Sereno, and Saratoga
I
GLARA C
6 °6 FIRE DEPARTMENT 00,3ACC1,1.4,,,6'
SANTA CLARA COUNTY
• .J 70.,0.2016
E$r.18i' 14700 Winchester Blvd., Los Gatos, CA 95032-1818
COURTESY 8SERVICE (408)378-4010 •(408) 378-9342 (fax) •www.sccfd.org
PLAN
REVIEW No. 16 0923
BLDG
DEVELOPMENTAL REVIEW COMMENTS PERMIT No.
Comment #4: Construction Site Fire Safety: All construction sites must comply with applicable
provisions of the CFC Chapter 33 and our Standard Detail and Specification SI-7. Provide
appropriate notations on subsequent plan submittals, as appropriate to the project. CFC Chp. 33
Comment #5: Address identification.New and existing buildings shall have approved address
numbers,building numbers or approved building identification placed in a position that is
plainly legible and visible from the street or road fronting the property. These numbers shall contrast
with their background.Where required by the fire code official, address numbers shall be provided
in additional approved locations to facilitate emergency response. Address numbers shall be Arabic
numbers or alphabetical letters. Numbers shall be a minimum of 4 inches (101.6 mm) high with a
minimum stroke width of 0.5 inch (12.7 mm). Where access is by means of a private road and the
building cannot be viewed from the public way, a monument,pole or other sign or means shall be
used to identify the structure. Address numbers shall be maintained. CFC Sec. 505.1
Plans not approved.To prevent plan review and inspection delays,the above noted Developmental
:Review Conditions shall be addressed as"notes"on all pending and future plan submittals and any referenced
diagrams to be reproduced onto the future plan submittal.
City PLANS SPECS NEW RMDL AS OCCUPANCY CONST.TYPE ApplicantName DATE PAGE
LAH SFR V-B Pacific Peninsula Architecture 04/01/2016 2of 2
SEC/FLOOR AREA LOAD PROJECT DESCRIPTION PROJECT TYPE OR SYSTEM
see plans see plans Residential Development Design Review
NAME OF PROJECT LOCATION
ZEISLER-BAILEY RESIDENCE 25975 Alicante Lane Los Altos Hills
TABULAR FIRE FLOW REDUCTION FOR FIRE SPRINKLERS REQUIRED FIRE FLOW @ 20 PSI BY
2500 50% I 1500 Harding,Doug
Organized as the.Santa Clara County Central Fire Protection District
Serving Santa Clara County and the communities of Campbell, Cupertino, Los Altos,
Los Altos Hills, Los Gatos,Monte Sereno, and Saratoga
ATTACHMENT 6
Kielty Arborist Services LLC
Certified Arborist WE#0476A
P.O. Box 6187
San Mateo, CA 94403
650- 515-9783
March 17,2016 RECEIVED
John Zeisler MAR 18 2016
25975 Alicante Lane
Los Altos Hills TOWN OF LOS ALTOS HILLS
Site: 25975 Alicante Lane, Los.Altos Hills, CA
Dear Mr. Zeisler,
As requested on Monday, March 14, 2016, I visited the above site to inspect and comment on the . •
trees. A new home with the addition of a pool is being designed.forthis site and your concern as
to the future health and safety of the trees has prompted this visit.
Method:
The significant trees on this site were located on a map provided by you. Each tree was given an
identification number. This number was inscribed on a metal foil tag and nailed to the trees at
eye level. The trees were then measured for diameter at 54 inches above ground level (DBH or
diameter at breast height). Each tree was assigned a condition rating from 1 to 100 for form and
vitality using the following scale;
1 - 29 Very Poor
30 - 49 Poor
50 - 69 Fair
70 89 Good
90 - 100 Excellent
The height of each tree was estimated and the spread was paced off. Lastly, a comments section
is provided. Site plan A1.0 dated 2/25/16 was used for this report. .
25975 Alicante Lane/3/17/16 (2)
Survey:
Tree# Species DBH CON HT/SP Comments
1 Olive 17.3@base 60 15/15 Good vigor, fair form,multi leader at base
(Olea europaea) with minor decay,movable tree.
2 Chinese pistache 9.9 65 30/25 Good vigor, fair form,multi leader at 10
(Pistachia chinensis) feet, girdling root.
3 Olive 10.5@base 60 12/10 Good vigor, fair form,topped leaders, minor
(Olea europaea) decay, multi leader at base.
4 Olive 25@base 60 15/15 Good vigor, fair form,multi leader at 1 foot,
(Olea europaea) topped,minor decay.
5 Olive 25.2@base 65 20/15 Good vigor, good form, multi leader at 2
(Olea europaea) feet,minor decay.
6 Olive 16.8@base 65 20/15 Good vigor,fair form,multi leader at 2 feet,
(Olea europaea) minor decay, close to home.
7 Olive 6.2-8M 55 20/10 Fair vigor, fair form, codominant at base,
(Olea europaea) suppressed by#8,minor decay.
e 30=93 70 40/50 Good vigor, good form, codominant at 10
(Quercus agrifolia) feet with good crotch formation, well
maintained, cables installed for support,
decay in trunk at 5 feet, spreading canopy.
9 Olive 8.8-6.2 50 12/15 Good vigor, fair-poor form,topped,
(Olea europaea) suppressed by#8, codominant at base, minor
decay.
10 Redwood 21.9 80 75/20 Good vigor, good form, on property line,
(Sequoia sempervirens) good screen.
11 Redwood 19.6 80 80/20 Good vigor, good form, on property line,
(Sequoia sempervirens) good screen.
12 Redwood 21.5: 80 80/20 Good vigor, good form, on property line,
(Sequoia sempervirens) good screen.
13 Redwood 20.9 80 75/20 Good vigor, good form, on property line,
(Sequoia sempervirens) good screen.
r
25975 Alicante Lane/3/17/16 . . (3)
Survey:
Tree# Species DBH CON HT/SP Comments
14 Redwood 22.3 80 75/20 Good vigor, good form, on property line,
(Sequoia sempervirens) - good screen.
15 Mayten - 7.2 55 20/15 Fair vigor, fair form, small planting area,
(Maytenus boaria) surrounded by hardscape, abundance-of
interior dead wood.
16 Olive 8.1-5.2 50 15/15 Good vigor,poor form,topped, multi leader
(Olea europaea) at base.
17 Olive 4x4 50 15/15 Good vigor,poor form,topped, multi leader
(Olea europaea) at base.
18 Birch 12.8 65 70/20 Good vigor, fair form, multi leader at 35
(Betula pendula) feet, close to hardscape.
19 Birch 12.9 60 70/20 Good vigor, fair form, codominant at 20
(Betula pendula) feet, fair crotch.
20 Birch 14.8 45 70/20 Poor vigor, fair form,possible decay at 3
(Betula pendula) feet on north side of trunk, no foliage,
abundance of dead wood.
tb agMalive o 70 50/50 Good vigor, good form, multi leader at 10
(Quercus agrifolia) feet with good crotch formations,heavy
lateral limbs, could use some pruning.
22 Redwood 26:0 80 75/30 Good vigor, good form.
(Sequoia sempervirens)
23 Redwood .3.1.6 40 90/30 Poor vigor, fair form, drought stressed,
(Sequoia sempervirens) abundance of dead wood, declining top.
24 Redwood 29.6 45 90/30 Fair vigor, fair form, slightly drought
(Sequoia sempervirens) stressed, 15 feet from sports court.
25 Redwood 28.2 70 90/30 Good vigor, good form.
(Sequoia sempervirens). .
X26 t=live,cs ' -4 27:955 60/55 Good vigor,poor-fair form, multi leader at
(Quercus agrifolia) . . 10 feet with good crotch formations,
suppressed by redwoods, heavy lean to the
south east.
25975 Alicante Lane/3/17/16 (4)
Survey:
Tree# Species DBH CON HT/SP Comments
27 Flowering pear 13.9 45 40/25 Fair vigor,poor form, multi leader at 8 feet
(Pyrus calleryana) with poor crotch formation,topped,
fire-blight.
28 Flowering pear 13.1 45 40/25 Fair vigor,poor form,multi leader at8 feet
(Pyrus calleryana) with poor crotch formation,topped,
fire-blight.
29 Flowering pear 11.9 45 40/25 Fair vigor,poor form,multi leader at 8 feet
(Pyrus calleryana) with poor crotch formation,topped,
fire-blight.
30 Flowering pear 11.2 45 40/25 Fair vigor,poor form,multi leader at 8 feet
(Pyrus calleryana) with poor crotch formation,topped,
fire-blight.
31 Flowering pear 13.1 45 40/25 Fair vigor,poor form, multi leader at 8 feet
(Pyrus calleryana) with poor crotch formation,topped,
fire-blight.
32 Flowering pear 12.3 45 40/25 Fair vigor,poor form,multi leader at 8 feet
(Pyrus calleryana) with poor crotch formation,topped,
fire-blight.
33 Flowering pear 12.8 45 40/25 Fair vigor,poor form,multi leader at 8 feet
(Pyrus calleryana) with poor crotch formation, topped,
fire-blight.
34 Flowering pear 12.1 45 40/25 Fair vigor,poor form, multi leader at 8 feet
(Pyrus calleryana) with poor crotch formation, topped,
fire-blight.
35 Flowering pear 11.2 45 40/25 Fair vigor,poor form,multi leader at 8 feet
(Pyrus calleryana) with poor crotch formation,topped,
fire-blight.
36 Flowering pear 11.9 45 40/25 Fair vigor,poor form,multi leader at 8 feet
(Pyrus calleryana) with poor crotch formation, topped,
fire-blight.
37 Redbud 6.0 55 10/8 Fair vigor,poor form, suppressed, leans
(Cercis spp.) south east, decay in leaders.
25975 Alicante Lane/3/17/16 (5)
Survey:.
Tree# Species DBH CON HT/SP Comments
38 Photinia 3.8 60 8/8 Good vigor, good form.
(Photinia spp.)
39 Crab apple 7.1 60 12/15 Fair vigor, fair form,topped.
(Malus spp)
40 Crab apple 7.9. 60 12/15 Fair vigor, fair form,topped.
(Malus spp)
41 Yew 8@base 45 20/5 Fair vigor,poor form,multi leader at base,
(Taxus baccata) abundance of dead wood.
42 Birch 6.5 40 50/15 Fair vigor,poor form, suppressed,heavy
(Betula pendula) decay in main leader at 10 feet.
43 Birch 10.7 60 50/15 Good vigor, good form.
(Betula pendula)
44 Birch 7.5 55 , 50/15 Good vigor, fair form, codominant at 10
(Betula pendula) feet.
Summary:
The trees on site are a mix of native trees and several species of imported trees. The site has
been well maintained as a majority of the trees are in fair condition. New home improvements
are being designed for this property and a few number of trees will need to be removed to
facilitate the proposed work. Some of the trees will be close to the proposed work and will
require special attention in order to preserve their health.
Trees#5 and#6 are both olive trees that will have minor impacts from the proposed
construction. Both of these trees are in close proximity to the existing home. Construction
activities will be close to these trees. If they are to be retained, work near these trees needs to be. .
done with great caution. The use of hand tools to excavate near these trees while exposing and
cutting roots cleanly will greatly improve their chances for survival. Another option for these
trees is to dig them up and move them to a better location on the property. Both of these trees
are in fair condition with minor amount of decay on their limbs,which is normal for this species.
The concrete driveway between olive trees#3 and#4 is proposed for removal. The driveway is
beneath the drip lines of these trees. Removal of the driveway should be done at the end of the
project so that staging of materials can be done on the driveway. This will help decrease the
amount of compaction to the soil for the trees,on the property. When removing the driveway
underneath the driplines of these trees hand tools should be used in order to remove the driveway
so that any roots that are in this area could be preserved. Once the driveway is removed and
roots left intact,native fill soil should be added to fill the space where the driveway once was.
The impacts to these 2 trees are expected to be minor if the above is carried out with care.
25975 Alicante Lane/3/17/16 (6)
The proposed master porch slightly extends into the driplines of birch trees#18 and#19 at a
corner cut. Impacts to these trees are expected to be minor to nonexistent. The area outside of
the tree protection zone for these trees shall have a landscape barrier installed as this will likely
be a walkway for construction worker. The landscape barrier will discourage compaction in this
area.
Redwood tree#22 is in close proximity to an arbor that is to be removed. This arbor shall be
removed by hand while leaving any roots found intact. Impacts to the redwood are expected to
be minor to non-existent, as the arbor is a good distance from the redwood tree. The redwood
tree is also in good health.
Redwood trees#23-25 are proposed for removal.
Redwood trees#23 and#24 are in the location where
a pool and pool house is being proposed while
redwood#25 is in close proximity to the proposed
work. Redwoods#23 and#24 are in poor condition
from the prolonged period of drought. The tops of
ati ,4
�y these trees are in decline and apercentage of large
rn •� 1 a
the trees foliage is brown. Because these trees are
,g•4 ���' not in their native setting where coastal fog is present
`� • they have trouble getting water to the tops of the tree
v ' �Bs * � , as opposed to getting water to the tops of the trees
s r� :�** rie T c +;� from the moisture fog is supplying in their native
' , :1;.. settin Eventually the tops will completely die and
� � �5w will be extremely hazardous as high winds could• ` • ',.#� w w , w,� cause the tops to fail. These trees should be removed
`��i'a Vii` ��st`s•z:.'„t" �J4..+g� i� a.'.,�,�
•S� � as they are already in a state of decline and will
become a future hazard.
r 476-r-- Picture showing declining redwoods
25975 Alicante Lane/3/17/16 (7)
Coast live oak#26 is a good distance from the proposed pool house and pool. Also the proposed
work is a corner cut. This will lessen the impact as a smaller amount of the trees root zone will
be impacted. This tree does have a significant lean to the southeast as it is suppressed by
redwood trees#23-25. If the nearby redwood trees are removed this will expose the oak tree to
winds and sun. The Coast live oak should be heavily pruned to lighten the heavy lateral limbs in
the direction of the lean in order to reduce the risk of a failure. This tree will slowly put on new
growth in the opposite direction of the lean in order to balance itself out as the removal of the
nearby redwood trees will expose the suppressed side of this tree to sunlight.
Flowering pear trees #27-36 are all located on the property line on the north west corner of the
property. These trees all received poor condition ratings as they have poor crotch formations and
have also been topped in the past. All of the pear trees are also infected with fire-blight. The
sport court near these trees is proposed for removal. When removing the sport court areas that
are close to the trees should be removed by hand in order to not damage what roots may have
grown underneath the sports court. The removal of the sport court will benefit these trees as this
area can be an area where root growth can now be encouraged. Compost and native soil should
be filled in where the existing sports court is located.
Trees#38-44 are all proposed to be removed to facilitate construction. They consist of 3 birch
trees,2 crabapples, 1 photinia and 1 Irish yew tree. These trees are all small, easily replaceable
trees. If wanted for retention,they can be dug up and moved to a better location on the property.
The following tree protection plan will help to insure the future health of the retained trees.
Tree Protection Plan:
Tree protection zones should be established and maintained throughout the entire length of the
project. Fencing for the protection zones should be 6 foot tall metal chain link type supported
my 2 inch metal poles pounded into the ground by no less than 2 feet. The support poles should
be spaced no more than 10 feet apart on center. The location for the protection fencing should be
as close to the dripline as possible still allowing room for construction to safely continue. Signs
should be placed on fencing signifying"Tree Protection Zone -Keep Out". No materials or
equipment should be stored or cleaned inside the tree protection zones.
Any roots to be cut should be monitored and documented. Large roots or large masses of roots to
be cut should be inspected by the site arborist. The site arborist may recommend fertilizing or
irrigation if root cutting is significant. Cut all roots clean with a saw or loppers. Roots to be left
exposed for a period of time should be covered with layers of burlap and kept moist. The site
arborist will be on site during any work within the dripline of theprotected trees on site. The
contractor must notify the arborist 1 day in advance of this work.
Alicante Lane/3/17/16 (8)
Where tree protection does not cover the entire root zone of the trees a landscape buffer
consisting of wood chips spread to a depth of six inches will be placed where foot traffic is
expected to be heavy. The landscape buffer will help to reduce compaction to the unprotected
root zone.
Trenching for irrigation, electrical, drainage or any other reason should be hand dug when
beneath the driplines of protected trees. Hand digging and carefully laying pipes below or beside
protected roots will dramatically reduce root loss of desired trees thus reducing trauma to the
entire tree. Trenches should be backfilled as soon as possible with native material and
compacted to near its original level. Trenches that must be left exposed for a period of time
should also be covered with layers of burlap and kept moist. Plywood over the top of the trench
will also help protect exposed roots below.
Normal irrigation should be maintained throughout the entire length of the project. The imported
trees on this site will require irrigation during the warm season months. Some irrigation may be
required during the winter months depending on the seasonal rainfall. During the summer
months the trees on this site should receive heavy flood type irrigation 2 times a month. During
the fall and winter 1 time a month should suffice. Mulching the root zone of protected trees will
help the soil retain moisture,thus reducing water consumption. The large oaks on the property
will not need any irrigation as they are'native to the area,unless their root zones are traumatized.
An inspection of the tree protection fencing may be required. Other inspections will be on an as
needed basis.
This information should be kept on site at all times. The information included in this report is
believed to be true and based on sound arboricultural principles and practices.
Sincerely,
Kevin R. Kielty David P. Beckham
Certified Arborist WE#0476A Certified Arborist WE#10724A