HomeMy WebLinkAboutSouthwest Hazard ControlTOWN OF LOS ALTOSHILLS June ii, zooa
Staff Report to the City Council
RE: AWARD OF CONTRACT: NEW TOWN HALL —HAZARDOUS
MATERIALS ABATEMENT (BID DIVISION #01), DEMOLITION (BID
DNISION #02) AND SOILS ENGINEERING CONSULTING SERVICES.
FROM: Tony Vierra, Project Manager — TBI Construction & Construction Management
�4ew
APPROVED: Maureen Cassingham, City Manager C Oar 0\L.
RECOMMENDATION: That the City Council adopt the attached resolution that:
1. Awards the contracts for the hazardous materials abatement to Southwest Hazard Control
and demolition to Ferma Corporation.
2. Approves the proposal for soils engineering services to Kleinfelder, Inc.
DISCUSSION:
1. After completion of the public bid process no bids were received for the hazardous materials
abatement scope of work. TBI has been advised by the City Attorney's office based on their
interpretation of Public Contract Code Section 20166 that it is permissible to select a contractor
for the abatement bid package and negotiate a price (without a bid bond) that protects the Town's
best interest. TBI contacted two abatement contractors and received two bids. The lower of the
two was from Southwest Hazard Control in the amount of $15,715 which is below the project
budget of $22,000.
The demolition scope of work generated seven (7) contractor bids which were publicly opened
and read aloud at 2:00pm on Tuesday, June 8, 2004. The bid amounts ranged from $86,050 to
$27,300. The project budget was $37,825.00.
Ra =
C rth::..
1Ferma
.......................................................................................................................................................................................................................................................................
$
279300.00
2V.E.M.
.......................................................................................................................................................................................................................................................................
$
42,000.00
3Demo
.......................................................................................................................................................................................................................................................................
Masters
$
519850.00
4Evans
...............................................
Brothers
......................................................................................................................................................................
$
54,450.00
..................................I.................
5Buccaneer
............................... ................
Demolition
.................................................................................................................................................................................................................
$
58,390.00 I........
6 ..................
Roldan Construction
$.............82,230.00..............
7
Randazzo Enterprise
$
86,050.00
Based on the low bids and the post -bid interviews with each contractor where scope is discussed
in detail, award of contracts to Southwest Hazard Control and Ferma Corporation is
recommended.
2. As part of the re -design of the New Town Hall building foundation for cost savings purposes
TBI solicited a soils engineer to review the site condition and issue a report with
recommendations. This report supported the foundation re -design and was included in the
contractor bid documents.
BUDGET IMPACT: Both the abatement and demolition bids are under budget as it relates to
the latest construction cost estimates provided by TBI. The soils engineering costs are included
in the latest project budgets as a soft
6/09/2004
13:57 5103525155 SHC9INC PAGE 03
LOS ALTOS HILLS TOWN
Us Altos Hills, California
_R_E YISED
BID FORM,
TO& TOWN OF LOS ALTOS HILLS, a general law city of the State of Califomia. (the
1. Total Did Amount Punuant to and in compliance with Advertisement to Bid — Notice to
131"dden, Instructions to Bidders and other Contract Documents With regard to;
TOWN OF LOS ALTOS HILLS
LOS ALTOS HILLS TOWN HALL
26379 FREMONT RO"
LOS ALTOS HILLS, CALIFORNIA 94022
The and enigned bidder, having carefully examined the site of the above -referenced project
and become thoroughly familiar with the general and local conditions affecting the
performance and costs of the project, the character, quality and quantity of work to be
Perfonned =d materials to be furnished and the to s and conditions of the Contract
M ---Iq *th
Documents, hereby proposes and agrees to fully pq;-A'LJL11 the Work within e stated Time of
Completion, in strict accordance with the Contract Doc=ents (including without limitation
the furnishing' of any and all tools, equipment, appmtus, facilities, labor, maten'als,
transportation and utility services and incidentals necessary to fully perfonn the Work and
complete it in a workmanlike manner) for the -total sum of:
Bid Division: 01 HAZARDOUS MATERIALS ABATEMENT
Did Amount: FIFTEEN THOUSAND SEVEN HUNDRED FIFTEEN DOLLARS
15x715.00
2. UnitPrlue (to be completed by bid divisions specified below ONLY)
40 Bid Division #01: Hazardous Materials Abatement: Complete unit pricing sheet in
Appendix B of the Hazardous Materials Abatement Specifications by Ha 1, Doc dated
Apn-1. 2004 titled Abatement and Removal Unit Cost Allowances. Complete ALL the
unit cost tables provided
1h
Bid Division #10: Floor Covering: Unit Price per Soction 06966.1.01-C for application
of sealer.
Unit Price Amount (Cost per square foot):
square -foot)
MVISED Bid Form
00310 - Page 1 of 5
0�
�n
06/09/2004 13:57 5103525155 SHC,INC PAGE 04
LOS ALTOS RMLS TOWN HAU
Los Altos Hills, California'
3. Alternate Priceso be completed by bid divisions specified below ONLY)
4SysRated
Bid Division #20: Photovoltaic System: Alterriate Biel Amount for a tem
Output of less than 3OkW
Alternate Bid Amount:
4. Open Bid. It is understood that the Owner reserves the right to reject this bid. The
undersigned agrees that this bid shall remain open and not be withdrawn for a period of sixty
(6 0) calendar days from the date prescribed for its operdng.
S. Desienation ofSubcontrwic-toFri. Attached hereto, in compliance with Section 4100-4113 of
the Public Contract Code of the State of California, is bidder's completed Designation of
Subcontractors form.
6.Npa-_Callusion Declaradou, Attached hereto, in compliance with Section 7106 of the
-
Public Contract Code, is a Non -Collusion Declaration fora.
7,r Execaflow ► reement; COMMencemelit-of.Ho
,rk. It is understood and agreed ftt if a
Notice of Award is mailed or delivered to the undersigned bidder within sixty (60) calendar
days after the opening of bids, or at any time thereafter before the bid is with,, the
undersigned bidder will execute and deliver the Agreement to the Owner, together with the
insurance documents specified in the Insurance Requirements portion of the Contract
Documents, the Pedonnance Hond and the Payment Bond, all within seven (7) calendar days
after personal delivery or deposit in the mail, as the case may be, of the Notice of Award.
The undersigned bidder further agrees that the Work shall be commenced by the undersigned
bidder on the date of the, Owner's Notice to Proceed, and shall be completed within the stated
Time of Completion.
84 Bid Guarantee,, Accompaning tbds bid is 10Z BID BOND (insert' words
Y1 AM
911cash 9#c ed ch eek "cash ier Is ch eck " or "bidder's bon d 11 as th e case m ay be) in an
amount equal to or not less than ten percent (10%) of the bid. Such security shall be forfeited,
paid to or retained by the Owner as liquidated damages should the bidder to whom the
contract is awarded fail to execute the Agreement and all, required insuraince documents,
bonds and othcr required forms as required under the Contract Documents.
9. License. The undersigned is required to providr, the information set forth below regarding its
license. Failure of the and ersiped to be properly licensed upon submission of a bid shall
cause the undersigned to be disqualified and the bid rejected. California Business and
Professions Code Section 7028.15 provides that a licensed contractor shall not subIMU a bid
to a public agency unless his or her cootmctor's license nuniber appears clearly on the bid,
the license expiration date is stated, and the bid contains a statement that the representations
made therein are made under penalty of peluury. Any bid not containing this information, or a
REVISED Bid Form
00310 - Page 2 of 5
06/09/2004 13:57 5103525155 SHC�INC PAGE 05
WS ALTOS HILLS TOWN HALL
Los Altos Hills, Calt Porn
bid containing information whieb is subsequently proven false, shall be considered non-
responsive and sWlberejected byth,epublid agen6y.
C=tractor's License Number: _�� �;�. , n.
License Expiration Date:...- 8/31/05
Contractor"s State License Classification:- C2 ASB
The n on bidder's State Contractor's License must be identical to the bidder's
name,
10. Interested Pe . The names of all persons interested in the bidder as principals, whether
as shareholder, member, partner, and proprietor or otherwise,, are: I
CHR.ISANN KARCHES - PRESIDENT
GERALD J* KARCHES - SECRET. RY
LINDA BOTCHER CFO
11. Aodress., The Notice -of Award or any request for additional information may be addressed
to the undersigned bidder at the business address set forth below,
12m Inconsistencies. Wherever in this bid an anunt is stated in both words and figures, in case
of a discrepancy between words and figures, the words shall prevail; if all or any portion of
the bid. is, required to be given in unit prices and totals and a discrepancy exists between any
such unit pn'ces and totals so given, the unit prices shall prevail.
13. RecelfiDt g.,kddenda. The undersigned acknowledges receipt of the following addenda and
certifies that all such addenda are included in its proposal:
ADDENDA I ACKNOWLEDGED
14. ASknowledggment of C . I
,oro of Approval, The undersigned acknowledges rece'pt of
the following project conditions and certifies that compliance with all such conditions are
included in its proposal.
REVISED Bid Form
00310 - Page 3 of 5
06/09/2004 13:57 5103525155 SHC5INC PAGE 06
LOS ALTOS HILLS TOWN HALL
Los Altos W115, Califomia
Conditions of Approval by the Town of Los Altos Hills as set forth in the .staff
report to the planning comudssion dated February ,12, 2004. and all associated
attachments
Bach bid must *ve the full business address of the bidder and be signed by bidder with
W -
bidder's usual Signature. Bids by partnerships must finmish the full name of all partners and
must be signed by one of the members of the partnership, or by an authorized representative,
he person sivmn g. Bids by a corporatn ioor
followed by the signature and designation of t
LLC must be signed with the legal name of the corporation or LLC, followed by the name of
the state of incorporation or organization and by the signatue and designation of the
presidmt, seci-etary, or oflier pion authofizcd to bind it 'in the matter. The name of each
pmon signing shall also be typed or printed below the signature. Satisfactory evidence of the
anthority of the person signing on behalf of a corporation or LLC shall be famished.
BIDDER'SNAME: SOUTHWEST HAZARD CONTROL 2 INC.
BIDDER'S ADD S: ..., 712 WHITNEY STREET
SAN LEAS DRO CA 94577
BIDDER" S PHONE NUMBER:. 53.0-352-5152
BIDDER'S FAX NLTMBEk: 510-352!--5155
The undersigned bidder declarei under penalty of pe&ry under the laws of the State of
California that all representations made in this Bid Form are true and correct.
Dated this n 8TH day of JUNE 92004.
By: vo-XA�
die
(Sipature)
print Name:: MICHAEL J HEGARTY
Title: DIVISION MANAGER
Bidder's Name:
(if second signature needed:) By:
(in.ature)
Print Name:
Title:
Bidder s Name:
REVISED Bid Form
00310 - Page 4 of 5
06/09/2004 13:57 5103525155
SHC� INC
Check one: Corporation
)Limited Liability ComDanv
PAGE 07
LOS ALTOS LTOw"MUU
Los Altos Itlis, Cafiforr�a
Partnership
Individual
NOTE: 3` bidder is a corporation or LLC, the' legal naxne "ip
of the cooration or LLC must be set
foith above, together With the signatum of an officer or rnana'ger authdfized to sign contracts on
behW of the corporation or LLQ if bidder is a partnership, the true name of the partnemhip must
be set forth above, together witb the signature(s) of the partner or partners authorized to sign
contracts in behalf of the partnership;,. and if bidder 'is an individual, W.'s or her signatuxe must be
set forth above.
CO"ORAIE CERTIFICATE
12 GERALD J KARCHES 1, certify that I am the Secretary of the
Corporation named as the bidder in th e foregoing bid; that
who signed said bid on behalf of the bidder was then MICHAEL J. HEGARTY of
said Corporation; that said bid was duly signed for and on behalf of said Corporation by
authority of its goveming body and is within the scope of its corporate powers.
(Corporate Seal)
Signature:
Print Name: URALD J KARCHES
Secretary
EZ ID OF BID FORM
REVISED Bid Form
00310 - Page 5 of5
06/09/2004 13:57 5103525155
I
SHC, INC
APPE, NDIX -P, B
ABATEMENT and REMOVAL UNIT COST ALLOWANCES
Hazuat Doc
PAGE 00
UNIT COST ALLOWANCES - Tgi,. TOWN OF LOS ALTO$ HILLS
0 FlazMat Doc — 2004
APPENDIX - B
0610S12064 13:57 5103525155 SHC5INC PAGE 09
ABATEMENT and REMOVAL UNIT COST ALLOWANCES
NOTE - THESE PRICES WILL BE USED AS AN ADD AS WELL AS A DEDUCT
MOBILIZATION
ASBESTOS FLOORING
TASK
QTY
UNIT
TOTAL
F5
'Abate Floor Tile &Mastic
300SF
COST
$
C I
Mobilization
3 EA
40,00
120.00
C2
Small, Containment < 2005F
3 EA
70.00
210,00
C3
Large Containment > 200SP
3 E.A.
100.00
300.00
C4
Spot Removal. (2'x 2-J)
SEA
6
300.00
C5
Small Containment with Hard Barriers
2EA
170.00
340.00
c
Total Mobilization
-J
1270.00
ASBESTOS FLOORING
Na�MatDoc
UNIT COST ALLOWANCES -TDI. TOWN OF LOS ALTOS HILLS
0 HAXMRI tW - 2W4
"PENDIX - J9
TASK
QTY
UNIT
COST
TOTAL$
F5
'Abate Floor Tile &Mastic
300SF
1.50
450.00
F6
Abate Floor Tile, Mastic &SubwFloor
300SF
1.70
510600
F7
Abate Carpet, Floor Tile & Mastic
450SF
I 1.70
765.00
F8
Abate Carpet and Underlying Mastic
300SP
.1.20
360.00'
LEM F10
Abate Baseboard &Mastic
I
.70
70.00
F1 1
F12
It
Abate Vinyl Sheeting/I,inoleum &
Related Backing on Wood
Abate Vinyl Sheeting/Linolaum &
Related Backing on Concrete
2505F
250SF
3.70
3.00
925.00
750-00
F
Total Flooring
-J
3830.00
Na�MatDoc
UNIT COST ALLOWANCES -TDI. TOWN OF LOS ALTOS HILLS
0 HAXMRI tW - 2W4
"PENDIX - J9
06/09/2004 13:57 5103525155 SHC,INC PAGE 10
ABATEMENT and REMOVAL UNIT COST ALLOWANCES
NOTE THESE PRICES WILL BE USED A S AN ADD AS WELL AS A DEDUCT
ASBESTOS WALLS &CEILINGS
ASBESTOS ROOFING MATERIAL
TASK
QTY
UNIT
TOTAL
Rl.
Roof Pad All La ers
SOOSF
COST..... -j-_
-
W8
Abate Wall Board System (Shaetzock,
2005E
1.25
250.00
R3
Ta e &Mud Walls and/or Ceilings
100LF
1.00
100.00
W9
Abate Plaster Walls and/or Ceilings
200SF
1.50
300.00
J61J- W10
Abate Asbestos Cement Panels (Walls
100SF
.50
50.00
arid/or Ceilings
I
1 2
Abate Ceilingjiles and Mastic
400SF
1.20
480.00
_W
13
Abate Ceiling_Tile and Plaster Soffit
4005E
1.70
680,500
_W
W14
Abate Drop M* Ceiling Tile and Clean
SOOSF
460
300-00
Crrid
W15
Abate Loose Fill Insulation
200SP
.50
100.00
16
Overs ray behind wall,panela
300SF
1.70
510.00
_W
W17
Sprayed -On. Ceiling Material and
400SP
2.20
880.00
Substrate
w
Total Walls & Ceilings
3550.00
ASBESTOS ROOFING MATERIAL
UNIT COST ALLOWANCES - TK. TOWN OF LOS ALTOS HILLS
0 HipMat ilii -2d04
ffw=_�w
Ha�lWuwjlaf Doc
"PENDIX -1B
TASK
QTY
UNIT
COST
TOTAL
$
Rl.
Roof Pad All La ers
SOOSF
1.20
600.00
R.2
Penetration MasticlFlashing
100LF
1.00-00
R3
Edging
100LF
1.00
100.00
R4
R5
-Mastic/Flashing
Roof Overhang Plaster
Roof Felt Paper
200SF
500SF
1.50
.70
300-00.,
350,00
R
Total. Rooimg Material
1450-00
UNIT COST ALLOWANCES - TK. TOWN OF LOS ALTOS HILLS
0 HipMat ilii -2d04
ffw=_�w
Ha�lWuwjlaf Doc
"PENDIX -1B
06/09/2004 13:57 5103525155 SHCqINC PAGE 11
• . ABATEMENT and,REMOVAL UNIT COST ALLOWANCES . .
NOTE THESE PRICES WILL BE USED AS AN ADD AS WELL AS A DEDUCT
ASBESTOS TSI, HVAC AND BOILER SYSTEMS
UNIT COST ALLOWANCES - TRi. TOWN OF LOS ALTOS HILLS
0 HazM21 thx — 2004
APPENDIX - R
TASK
QTY
UNIT
TOTAL
COST
$
TI
Pi e La�ggm*&
25LF
5.00
125.00
T2
Boiler Insulation /Firebrick
I OSF
3.00
30.00
T3
Aircell
SOLF
2.00
1 00.00
T4
Furnace Flues
15LF
2.00
30.00
T5
Heat Shield
l OLF
.50-
5.00'
25.00
T6
Asbestos Cement Wall Panels
SOLF
.50
T7
Light Reflective Materials
SSF
.1.00
5.00
T8
Remove Fan Coil Unit
lEA
100.00
1,00,400
T9
Boiler Gasket and Caulking
SLF
1.00
5.001
TIO
Piewrav% D bris
10SF
1.00
10.00-F
T1 1
Remove Boiler Intact Rc Dispose of as
lEA
550.00
550.00
ACM
T12
Remove Furnace Intact &Dispose of as
1EA
550.00
550-00
ACM
T13
Remove Heater Intact &Dispose of as
lEA
200,00
200.00
ACM
T14
Remove_ Expansion Joints
5LF
1.00
5.00
T1.5
'Pipe Insulation (Runs & Fittings)
l OLF
1.00
10.00
T16
Dismantle &Dispose of existing Boilers,
IEA
700.00
700-00
Boiler Insulation/Firebrick & Fittings
T17
Asbestos Cement Pipe
lOLF
.50
5.00'
T
Total TSI!, HVAC AND
2455.00
BOILER SYSTEMS..
UNIT COST ALLOWANCES - TRi. TOWN OF LOS ALTOS HILLS
0 HazM21 thx — 2004
APPENDIX - R
X610912004 13:57 5103525155 SHC,INC PAGE 12
ABATEMENT and REMOVAL UNI'' COST -ALL CES
NOTE - THESE PRICES WILL BE USED AS AN ADD AS WELL AS A DEDUCT
ASBESTOS EXTERIOR
MATERIAL
MISCELLANEOUS
TASK
QTY
UNIT
TOTAL
COST
$
E2
Abate Stucco to expose studs
50SF
1.50
75.00
E3
Abate Plaster to expose studs
SOSF
1.50
75.00
E5
Asbestos Cement Window Panels / Siding
SOSF
.50
25.00
E6
Remove Drinking Water Fountain, and
IEA
100.00
100.00
abate material behind for new installation
3EA
110600
330.00
E
TOTAL EXTERIOR
Putty Typical 4"x 4" Window
275.00
MATERIAL
MISCELLANEOUS
HazMatDoc
UNIT COST ALLOWANCES - TBi- TOWN OF LOS ALTOS HILM
0 HuMat Doc — ZW4
APPENDM, R
TASK
QTY
UNIT
TOTAL
COST
$
Mi.
Casework Demolition from Walls
25LF
1.00
25.00
M2
Casework Demolition Over Floor Tile
25LF
1.00.
25.00
M3
PCB Ballasts
80EA
5.00
400.00
M6
Exterior Doors, associated frame &
lEA
100-00
100.00
caulking
Window, Frame &associated Window
3EA
110600
330.00
M7
Putty Typical 4"x 4" Window
M8
Asbestos Cement Counter Top,
20SF
.50
10.00
M9
Counter To Vinyl Sheeting, &Adhesive
25SF
1.00
25.00
M10
Fire Curtain (I Curtain)
12005F
.10
120-00.
M
TOTAL MISCELLANEOUS
1035.00
HazMatDoc
UNIT COST ALLOWANCES - TBi- TOWN OF LOS ALTOS HILM
0 HuMat Doc — ZW4
APPENDM, R
06/09/2004 13:57 5103525155 SHCqINC PAGE 13
ABATEMENT and REMOVAL UNIT COST ALLOWANCES
NOTE w THESE PRICES WILL BE -USED AS AN ADD. AS WELL AS A DEDUCT
LEAD
L2
TASK
Remove Peeling and Clu in Paint
QTY
200SF
UNIT
COST
TOTAL
$
3.00
600a00
Remove Window System Typical 4' x 4'
3EA
100.00
300.00
L3
Window (Window, Frame, Sills,, Sashes
etc.)
I,4
ExteriorDooxs, associated frame &
lEA
100.00
100.00
caulking
L5
All layers of Wa11 Material, to include
400Sk'
27,00
800.00
ceramic tile, associated grouts/mastic to
I ex ose studs
L6
Remove Fascias /Gutters
100LF
.50
50-00
L
TOTAL LEAD
1850.00
11
HazMaf Doc
UNIT COST ALLOWANCES - TEli- TOWN OF LOS ALTOS HILLS
0 HawMat Ow — 2004
"P DI - B
06/09/2004 13:57 5103525155 SHC, INC PAGE 14
SUMMARY
OF ABATEMENT and
REMOVAL UNIT COST ALLOWANCE
UNIT CUST ALLOWANCES - Tfki- TOWN OV LOS ALTOS HILLS
0 HnMat Doe - 2M4
Ahm
HuNst Ax
APPENDIX - B
TASK
TOTAL ($)
C
TOTAL MOBILIZATION
1270.00
F
TOTAL FLOORING
3830.00
W
TOTAL WALLS &CEILINGS
3550.00
R
TOTAL ROOFING MATERIAL
1450.00
T
TOTAL TSI, HVAC &BOILER SYSTEMS
2455,00
E
TOTAL EXTERIOR MATERIAL
275-00
M
TOTAL MISCELLANEOUS
1035-00
L
TOTAL LEAD
1.850.00
GRAND TOTAL ABATEMENT and
15,715.00
REMOVAL UNIT COST' ALLOWANCES
UNIT CUST ALLOWANCES - Tfki- TOWN OV LOS ALTOS HILLS
0 HnMat Doe - 2M4
Ahm
HuNst Ax
APPENDIX - B