3.2
TOWN OF LOS ALTOS HILLS May 4, 2006 Staff Report to the Planning Commission RE: SITE DEVELOPMENT PERMIT FOR A NEW 9,906 SQUARE FOOT TWO STORY RESIDENCE, DRIVEWAY, AND A GRADING POLICY EXCEPTION TO ALLOW A PORTION OF THE FINISHED FLOOR TO BE SIX AND A HALF FEET ABOVE EXISTING GRADE; LANDS OF ASKARI; 27861 NATOMA ROAD; FILE#160-05-ZP-SD-GD. FROM: Brian Froelich, Assistant Planner APPROVED BY: Carl Cahill, Acting City Manager/Planning Director CC RECOMMENDATION That the Planning Commission: Approve the requested Site Development Permit and Grading Policy Exception for the new residence, subject to the conditions and findings of approval in Attachments 1 and 2. BACKGROUND The subject 2.95 acre parcel is located on the west side of Natoma Road, northwest of the Natoma Road and Black Mountain Road intersection. The irregularly shaped property has a frontage along Natoma Road of nearly 900 feet. The project requires dedication of approximately 0.75 acres to the Town for the Natoma Road right of way. The net acreage of the property(for development purposes) is 2.222 acres. Topographic features on the property include an upper tributary of Matadero Creek and a natural swale. The site also contains heritage oak trees and a row of mature eucalyptus trees along the Natoma Road frontage. The existing residence was built in 1953 and would be demolished. The existing vehicular access is a rocked, circular driveway that will be removed. The building site is down slope from the right of way and with the existing vegetation is not highly visible from the road or surrounding properties. CODE REQUIREMENTS This application is not eligible for the Fast-Track process under section 10- 2.1305.1(a)(3), because the applicant requests a Grading Policy Exception. Specifically, the applicant proposes a finished floor that is six and a half (6.5) feet above existing grade. The raised floor area covers approximately 200 square foot of the building footprint. The remainder of the building complies. The Grading Policy allows finished floors to be up to three (3) feet above existing grade to assure that structures step with the slope. Per the Grading Policy (attached) the Planning Commission has discretion to allow Grading Policy Exceptions on individual projects. i Planning Commission Lands of Askari C May 4,2006 Page 2 of 13 DISCUSSION Site Data: Gross Lot Area: 2.95 acres Net Lot Area: 2.22 acres Average Slope: 17.3% Lot Unit Factor: 1.847 Site The project requires dedication of approximately 0.75 acres to the Town for the Natoma Road right of way. The net acreage of the property (for development purposes) is thereby reduced to 2.222 acres. The property contains a tributary of Matadero Creek. The proposal complies with Section 10-2.702; all portions of the proposed residence and driveway pavement ., are a minimum of 25 feet from the top of the creek bank. This portion of Matadero .:_� "'►'� Creek is not within the jurisdiction of the Santa Clara Valley Water District (SCVWD) and permits from SCVWD are not required for this project. Natural swale and Matadero Creek. The property contains portions designated as Open Space Conservation Area (OSCA) per the General Plan Land Use Diagram (see attached). The OSCA roughly follows the Matadero Creek Bank and associated vegetation. The creek bank meanders along the property's southern boundary for a distance of approximately 1,000 feet. The applicant has offered an Open Space Easement (see graphic attached) over approximately 30,000 square feet of the property in this area. The vegetation pattern along the creek bank forms aI natural boundary that the easement will follow. The Open Space Easement will cover an area from the top of the creek bank to the canopy line on the east side of the Matadero Creek Bank (on the subject property only) and run _ along the southern property line approximately 1,000 linear feet (parallel to the creek bank). The canopy line varies in width and proximity " - -max to the creek bank and so may the easement line. Stand of Oak Trees in the natural swale. Planning Commission Lands of Askari May 4,2006 Page 3 of 13 The Open Space Easement will widen to include the canopy of six heritage oak trees located in the natural drainage swale on site. The easement shall also include all portions of the site with greater than 30% slope as shown on the engineering plans. The Open Space Easement dedication is a recommended condition of approval and the required documentation would be prepared by the project engineer prior to accepting plans for Building Department review. The applicant has cooperated with staff and the Open Space Committee in addressing this issue. Floor Area and Development Area: Area Maximum Proposed Existing Increase Left Development 22,979 18,800 9,800 +9,000 +4,179 Floor 10,559 9,906 3,000 +6,906 +653 Residence-Floor Area The new two story residence is sited in generally the same location as the existing residence to be demolished. The proposed dwelling totals 9,906 square feet of floor area. This includes a 4,839 square foot first floor (includes porte couchere), 4,095 square foot second floor, and a 972 square foot four (4) car garage. The proposed floor area accounts for 94% of the total maximum floor area allowed for the property, with a remaining 653 square feet for future development. The rectangular, two story building design will increase the visible bulk from off site and the structure is sited perpendicular to topographic contours,.which is generally not recommended. These concerns were communicated to the applicant during the project review period and the applicant has chosen to move forward with this design. The building design does comply with height, setback, and NIDA/MFA requirements. Drivewa /Hardsca e-Develo ment Area The applicant proposes a new single access driveway and entry feature. The design is an amenity rather than a minimal site vehicular access. It was demonstrated early in the review period that the proposed design is not the minimum required driveway for accessing the property. Section 10-1.505 (a)(3) (excluding driveway portions beyond 100 linear feet in the MDA total) does not apply because of the decorative nature of the driveway. The design includes a cobra head turn around feature, a 280 foot runway, and portions wider than 14 feet (not in setback). These are all design features and are not the minimum required for site access and therefore included in the development area total. The design requires more grading and site work than a more conservative design. A 200 square foot portion of the driveway entrance was excluded from the development area total because that portion would have been required regardless of the driveway design. Planning Commission Lands of Askari ! May 4,2006 Page 4 of 13 The driveway totals 7,775 square feet and complies with Town and Fire Department standards. The proposed driveway requires fills that range from two to three feet on the down hill side. No walls are proposed with the driveway construction. Proposed hardscape (other than the driveway) is limited to the front entry porch that covers 1,319 square feet. The applicant has noted that he may apply for a pool and decking under a separate submittal. The total proposed development area accounts for 82% of the maximum development area allowed for the property, with a remaining 4,179 square feet for future development. Landscaping-Trees and Lighting Along the Natoma Road frontage the property is studded with large, mature eucalyptus trees. Many of these trees were damaged or fell during the 2005-2006 winter storms. These trees are a public nuisance per Section 12-2.206 of the Municipal Code because of their proximity to the road and are a threat to the safety and welfare of residents, motorists, and pedestrians. Recommended conditions include complete removal prior to accepting plans for building permits. The property owner reported that other trees on the south side of the existing residence were downed or damaged through the winter. In the proximity of the construction and staging there are five heritage oak trees that must be fenced according to the Town's tree protection fencing standards. An Arborist report was not required because the long term health of the trees should not be affected by the proposal. No grading or work is proposed in the heritage oak tree drip lines. The property owner has proposed a minimal number of building mounted lights. The placement is consistent with the Lighting Policy. All lights must be low wattage and either shielded down lights or have a frosted or etched lens. The applicant may include landscape lighting with the required landscape/screening review. Grading The applicant requests a Grading Policy Exception to allow a finished floor up to six and a half(6.5) feet above existing grade where three (3) feet above grade is the standard. The design requires three (3) feet of fill and then the finished floor would be three and a half (3.5) feet above the proposed grade. The raised floor is located in the proposed library at the southern most portion of the building. The floor covers an area of approximately 200 square feet. The Engineering Department has reviewed the plans and has recommended conditions of approval as specified in Attachment 1. It was observed that minor site grading had begun without the benefit of Town approval. Approximately 30 cubic yards was cut from the front of the site and filled in the rear. This work would have been subject to an administrative grading permit. The recommended a t. : Planning Commission Lands of Askari May 4,2006 Page 5 of 13 conditions require the applicant to pay a fee three times the amount of the required permit prior to accepting plans for building plan check. Geotechnical Review The site is not located in a geologic or seismic hazard zone per the Town's Geological and Seismic Hazard Zones Map, 2004. However, the site does exceed 15% slope and the project geotechnical report was evaluated by the Town's geotechnical consultant, Cotton, Shires and Associates. Cotton, Shires, and Associates does not have geotechnical objections to the basic site layout. Standard Geotechnical conditions apply. The project geotechnical engineer provide supplemental letters to the Town prior to acceptance of building plans for review and prior to final inspection.. Fire Department Review The Santa Clara County Fire Department reviewed the plans and has required that the building be sprinklered. The proposed driveway complies with standard D-1 for emergency vehicle access with a slope less than 15% and a turnaround with an outside radius greater than 36 feet. Committee Review The Pathways Committee recommends collecting the Pathway in lieu fee. The current in lieu fee is $47 multiplied by the width (in feet) of the property. The Environmental Design Committee recommends that a 25 foot structural setback be enforced. The committee also requested removal of an invasive shrub species and the property owner reportedly complied. The committee requests an Open Space Easement over portions of the property that exceed 30% slope. The area is covered by the owner's proposed easement. The Open Space Committee met with the property owner and staff throughout the project review and supports the proposed Open Space Easement location. ENVIRONMENTAL CLEARANCE(CEOA) The proposed single family residence is categorically exempt from the provisions of the California Environmental Quality Act by provision of Section 15303, Class 3 (a): "Class 3 consists of construction and location of limited numbers of new, small facilities or structures..." "(a) One single-family residence, or a second dwelling unit in a residential zone. In urbanized areas, up to three single-family residences may be constructed or converted under this exemption." Planning Commission Lands of Askari May 4,2006 Page 6 of 13 ATTACHMENTS 1. Recommended conditions of approval 2. Recommended Findings for Grading Policy Exception 3. Grading Policy 4. Section 12-2.206 Public Nuisances 5. General Plan Map 6. Proposed Open Space Easement Graphic 7. Development plans (Commission only) cc: Adam Askari 2881 Hemlock Avenue#A San Jose, CA 95128 r Planning Commission Lands of Askaii May 4,2006 Page 7 of 13 ATTACHMENT 1 RECOMMENDED CONDITIONS FOR SITE DEVELOPMENT PERMIT FOR A NEW RESIDENCE DRIVEWAY, AND GRADING POLICY EXCEPTION LANDS OF ASKARI, 27861 NATOMA ROAD File#160-05-ZP-SD-GD A. PLANNING DEPARTMENT: 1. The property owner shall grant an Open Space Easement to the Town. No structures are permitted and no grading or fill shall be permitted. Native vegetation may be planted within the easement but no irrigation or sprinkler systems are permitted. The property owner shall provide legal description and plat exhibits that are prepared by a licensed land surveyor or a registered civil engineer and the Town shall prepare the grant document. All required documents shall be signed and notarized by the property owner and returned to the Town prior to acceptance of plans for building plan check. la. The Open Space Easement shall cover an area from the top of the creek bank to the canopy line on the east side of the Matadero Creek Bank (on the subject property only) and run along the southern property line approximately 1,000 linear feet. The canopy line varies in width and proximity to the creek bank. The Open Space Easement must not be isolated on the site therefore must terminate at Natoma Road. The Open Space Easement shall widen to include the canopy of six heritage oak trees located in the natural drainage swale. The easement shall also include all portions of the site with greater than 30% slope as shown on the engineering plans. 2. No portion of the driveway paving shall be located within 25 feet of the top of the Matadero Creek bank. 3. The applicant shall remove all eucalyptus trees onsite prior to acceptance of plans for building plan check. Removal of eucalyptus trees near heritage oak trees shall be supervised by a Certified ISA Arborist. 4. The applicant shall pay three times the administrative fee pursuant to 1- 2.05(b), prior to acceptance of plans for building plan check, for the grading and site work performed without the benefit of a grading permit. The City Engineer may request a letter from the project engineer certifying that the fill was properly compacted. Planning Commission Lands of Askari May 4,2006 Page 8 of 13 5. Subsequent to final framing of the second story, a landscape screening and erosion control plan, including any additional outdoor lighting shall be reviewed at a Site Development Hearing. The applicant is recommended to work with adjacent neighbors on developing the landscape plan. Particular attention shall be given to plantings that will be adequate to provide privacy to adjacent neighbors and break up the view of the residence from surrounding properties and streets. It is recommended that one third of proposed plantings be drought tolerant plantings. All plantings required for screening purposes and erosion control (as determined by the Planning Department and City Engineer) must be installed prior to final inspection. 6. A landscape maintenance deposit of $10,000.00 (cashiers check) shall be posted prior to final inspection. An inspection of the landscape to ensure adequate establishment and maintenance shall be made two (2) years after installation. The deposit will be released after two (2) years if the plantings remain viable. 7. Prior to beginning any grading operation or demolition, all significant trees are to be fenced at the drip line. This includes but is not limited to five (5) heritage oak trees on site (4 in the natural swale and 1 in the right of way). The 6-foot chain link fencing shall clearly delineate the drip line. Town staff must inspect the fencing and the trees to be fenced prior to approval of any demolition or grading permit. The property owner shall call for said inspection at least three days in advance of the inspection. The fence must remain throughout the course of construction and the construction crew shall pay special attention to the care of the existing trees. No storage of equipment, vehicles, or debris shall be allowed within the drip lines of the fenced trees. 8. The eastern boundary of the proposed Open Space Easement shall be temporarily fenced per the Town's tree fencing standards for the duration of the project prior to acceptance of plans for building plan check. All construction fencing must be removed prior to final inspection. 9. No skylights are approved. Fire retardant roofing (Class A)is required for all new construction. 10. No new fencing, gates, or columns are approved with this plan. 11. All exterior lighting fixtures shall have frostedletched glass enclosures or be shielded light fixtures. All landscape lighting shall be reviewed with the landscape plan. Lighting fixtures shall generally be shielded downlights. No lighting may be placed within setbacks except for two driveway or entry lights. Planning Commission Lands of Askari May 4,2006 Page 9 of 13 B. ENGINEERING DEPARTMENT: 12. Two sets of a final grading and drainage plan shall be submitted for review and approval by the Engineering Department prior to acceptance of plans for building plan check. Final drainage and grading shall be inspected by the Engineering Department and any deficiencies corrected to the satisfaction of the Engineering Department prior to final inspection. A letter shall be submitted from the project engineer stating that the site grading and drainage improvements were installed as shown on the approved plans prior to final inspection. 13. Any, and all, changes to the approved grading and drainage plan shall be submitted as revisions from the project engineer and shall first be approved by the Town Engineering Department. No grading shall take place during the grading moratorium (November 1 to April 1) except with prior approval from the City Engineer. No grading shall take place within ten feet of any property line except to allow for the construction of the driveway access. 14. All public utility services serving this property shall be placed underground. 15. At the time of foundation inspection for the new residence and prior to final inspection, the location and elevation of the new residence shall be certified in writing by a registered civil engineer or licensed land surveyor as being in/at the approved location and elevation shown on the approved Site Development plan. At the time of framing inspection for the new residence, the height of each building shall be similarly certified as being at the height shown on the approved Site Development plan. 16. Two copies of an erosion and sediment control plan shall be submitted for review and approval by the Engineering Department prior to acceptance of plans for building plan check. The contractor and the property owner shall comply with- all appropriate requirements of the Town's NPDES permit relative to grading and erosion/sediment control. The first 100 feet of the driveway shall be rocked during construction and all cut and fill slopes shall be protected from erosion. All areas on the site that have the native soil disturbed shall be protected for erosion control during the rainy season and shall be replanted prior to final inspection. 17. Two copies of a grading and construction operation plan shall be submitted by the property owner for review and approval by the City Engineer and Planning Director prior to acceptance of plans for building plan check. The grading/construction operation plan shall address truck traffic issues regarding dust, noise, and vehicular and pedestrian traffic Planning Commission _ Lands of Askari May 4,2006 Page 10 of 13 safety on Natoma road and surrounding roadways, storage of construction materials, placement of sanitary facilities, parking for construction vehicles, clean-up area, and parking for construction personnel. A debris box (trash dumpster) shall be placed on site for collection of construction debris. Arrangements must be made with the Los Altos Garbage Company for the debris box, since they have a franchise with the Town and no other hauler is allowed within the Town limits. 18. The property owner shall inform the Town of any damage and shall repair any damage caused by the construction of the project to pathways, private driveways, and public and private roadways,prior to final inspection and release of occupancy permits and shall provide the Town with photographs of the existing conditions of the roadways and pathways prior to acceptance of plans for building plan check. 19. The property owner shall dedicate a 30' wide half-width public right of way to the Town over Natoma Road. The property owner shall provide legal description and plat exhibits that are prepared by a registered civil engineer or a licensed land surveyor and the Town shall prepare the dedication document. The dedication document, including the approved exhibits, shall be signed and notarized by the property owner and returned to the Town prior to submittal of plans for building plan check. 20. The applicant shall pay the Pathway in lieu fee pursuant to Section 10- 2.608. This condition shall be met prior to submittal of plans for building plan check. 21. A permit for the septic system shall be issued by Santa Clara County Health Department prior to acceptance of plans for building plan check. 22. Conditions of Santa Clara County Health Department shall be met prior to final inspection. 23. As recommended by Cotton, Shires &Associates in their report dated June September 12, 2005, the applicant shall comply with the following: A. Geotechnical Plan Review — The Project Geotechnical Consultant shall review and approve all geotechnical aspects of the project building and grading plans (i.e., site preparation and grading, site drainage improvements and design parameters for foundations, retaining walls and driveway) to ensure that their recommendations have been properly incorporated. In addition the consultant shall address the following: • If the proposed development includes construction of a leach field, the Project f: Planning Commission Lands of Askari May 4,2006 Page 11 of 13 Geotechnical Consultant shall address the potential for effluent to adversely impact slope stability. • The consultant shall consider the proposed location of the energy dissipater near the southwest corner of the residence on the referenced grading and drainage plan with respect to potential erosion or adverse slope impacts. Consideration shall be given to the potential merits of placing a dissipater closer to the bottom of the slope. The results of the plan review should be summarized by the Project Geotechnical Consultant in a letter and submitted to the Town Engineer for review and approval prior to acceptance of plans for building plan check. B. Geotechnical Field Inspection — The Project Geotechnical Consultant shall inspect, test (as needed), and approve all geotechnical aspects of the project construction. The inspections should include, but not necessarily be limited to: site preparation and grading, site surface and subsurface drainage improvements, and excavations for foundations and retaining walls prior to the placement of steel and concrete. The results of these inspections and the as-built conditions of the project shall be described by the geotechnical consultant in a letter and submitted to the Town Engineer for review prior to final (granting of occupancy)project approval. D. FIRE DEPARTMENT: 24. All portions of the residence shall be sprinklered prior to final inspection. Sprinkler plans shall be reviewed and approved prior to acceptance of plans for building plan check. 25. Required driveway installations shall be constructed and accepted by the Fire Department, prior to the start of combustible construction. Note that the building permit issuance may be withheld until installations are completed. Temporary driveways may be approved on a case by case basis. 26. Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the Planning Commission Lands of Askari 'V May 4,2006 Page 12 of 13 street or road fronting the property. Numbers shall contrast with their background. E. BUILDING DEPARTMENT: 27. All properties must pay School District fees to either the Los Altos School District or the Palo Alto Unified School District, as applicable, prior to acceptance of plans for building plan check from Los Altos Hills. The applicant must take a copy of Worksheet#2 to school district offices (both the elementary and high school offices in the Los Altos School District), pay the appropriate fees and provide the Town with a copy of their receipts. Upon completion of the construction, a final inspection shall be set with the Planning and Engineering Departments at least two weeks prior to final building inspection approval. CONDITION NUMBERS 1, 3, 4, 7, 8, 12, 16, 17, 18, 19, 20, 21, 23a, 24, AND 27 SHALL BE COMPLETED, REVIEWED, AND APPROVED PRIOR TO ACCEPTANCE OF CONSTRUCTION PLANS FOR PLAN CHECK BY THE BUILDING DEPARTMENT. NOTE: The Site Development permit is valid for one year from the approval date (until May 4, 2007). All required building permits must be obtained within that year and work on items not requiring a building permit shall be commenced within one year and completed within two years. j- Planning Commission Lands of Askari May 4,2006 Page 13 of 13 ATTACHMENT 2 RECOMMENDED FINDINGS FOR GRADING POLICY EXCEPTION LANDS OF ASKARI, 27861 NATOMA ROAD File#160-05-ZP-SD-GD 1. The proposed plan and grading is in substantial conformance with the General Plan Land Use Element General Principle #1 which states that "Uses of land should maintain the rural atmosphere, minimize disturbance to natural terrain, minimize removal of the natural vegetation and create the maximum compatibility of development with the natural environment through site design, architecture and landscaping." 2. The proposed area of grading is not on a hillside and will not result in the substantial visual alteration of the natural terrain. The property's existing contours and basic landform are retained. 3. The proposed grading will not result in the placement of retaining walls that are visible from off-site. 4. The proposed grading will not result in the removal of any substantial vegetation or alteration of existing drainage patterns. 5. The proposed area requiring exception is a small corner of the building (200 square feet). The area complies with all height requirements and does not increase the visible bulk of the building. ATTACHMENT 3- ., POLICY REGARDING GRADING Policy Re: Grading Code Sections and Design Guidelines: Section 10-2.702(c) of the Site Development Ordinance states that: "The amount of grading, excavation, or fill shall be the minimum necessary to accommodate proposed structures, unless grading is proposed to lower the profile of buildings." Section 10- 2.703(a) requires that: "Type II foundations - step-on-contour, daylight, pole foundations, or a combination thereof- shall be used on building sites with natural slopes in excess of fourteen percent (14%)." Policy A-2 of Goal I of the Design Guidelines (p. 5) indicates that construction should "blend with the contour of the land." Policy A-2 of Goal II (p. 14) indicates that: "On a sloping site, the structure should be stepped down the hill utilizing one story building elements. Avoid cantilevers and stilts over downhill slopes. Cut foundations should be used instead of fill on hilly terrain." atent: The purpose of this policy is to outline desired criteria for grading which assure that construction retains the existing contours and basic landform of the site to the greatest extent feasible. It is also intended that the policy provide guidance for "stepping" structures down sloped hillsides, and emphasizes cut to lower the profile of structures over fill or'foundation walls, which tend to raise the profile of the structure. While balanced cut and fill is desirable to minimize import or export of soil to,onfrom a site, it is recognized that the Town's policies and the guidelines below may encourage export as cut is generally preferred over fill. These policies are intended to be used by staff in evaluating and.- making recommendations to the Planning Commission and/or City Council regarding site development applications, and as guidance for applicants. Individual sites may dictate a need to deviate from the criteria, to the extent permitted by the Planning Commission and/or City Council. Policy Re: Grading page 2 04 Policies: 1. Cuts and fills in excess of the following levels generally will be considered excessive and contrary to Town ordinances and policies to grade only to the minimum extent necessary to accommodate structures and to site structures consistent with slope contours,i.e., "step down"the hill*: Cut Fill House 8'** 3' Accessory Bldg. 4' 3' Tennis Court 6' 3' Pool 4'*** 3' Driveways 4' 3' Other (decks,yards) 4' Y * Combined depths of cut plus fill for development other than the main residence should be limited to 6 feet, except that for tennis courts cut plus fill may be permitted up to a maximum of 8 feet. ** Excludes basements meeting Code definition. *** Excludes excavation for pool. 2. The height of the lowest finished floor(s) of a structure should generally not be set in excess of three (3) feet above the existing grade,, to assure that structures step with the slope. 3. Driveway cut may be increased up to a maximum of eight feet (8') for the portion of the driveway or backup area which is adjacent to a garage that has been lowered with a similar amount of cut. 4. Cut and/or fill for drainage shall be limited consistent with the guidelines set forth above for each type of structure, but shall be the minimum. grading needed for drainage purposes,as determined by the City Engineer. Approved by City Council: April 2, 1997 Sec. 12-2.206. Public nuisances: Enumerated. Page 1 of 1 TITLE 12. PARKS AND RECREATION ATTACHMENT �- CHAPTER 2.TREES, SHRUBS AND PLANTS* Sec. 12-2.206. Public nuisances: Enumerated. I The following are hereby declared to be public nuisances: (a) Any dead, diseased, infested, or drying tree in any street or on any private property so near to an street as to constitute a danger to street trees or streets or portions thereof; Y 9 (b) Any tree or shrub on any private property or in any street of a type or species apt to destroy, impair, or otherwise interfere with any street improvement, sidewalk, curb, approved street tree, gutter, sewer, or other public improvement, including utility mains or services: or (c) Any tree limb, shrub, or plant reaching a height more than three (3')feet above the street center adjacent thereto, except tree trunks having no limbs lower than nine (9')feet above the street center, within the thirty (30') foot triangle of private property at the intersection on any streets improved for vehicular traffic; (d) Vines or climbing plants growing into or over any street tree, public hydrant, pole, or electrolier; (e)The existence of any tree which is infested or infected, or in danger of becoming infested or infected, with objectionable insects, scale, fungus. or growth injurious to trees; (f) The existence of any branches or foliage which interfere with the visibility of, or free use of. or access to any portion of any street improved for vehicular or pedestrian travel; (g) Hedges or dense thorny shrubs and plants on any street, or portion thereof; (h) Shrubs and plants more than two (2') feet in height in any street measured above the top of the street center; and (i) Any weed or dangerous or obnoxious plant. (§ 5, Ord. 20; § 1 (part), Ord. 332, eff. June 1990) http://www.bpenet.com/codes/losaltoshills/ DATA/TITLE12/CHAPTER_2_TREES_S... 4/21/2006 T Z � ego TO co ...i 4 �M _ W}��1� � �"i• is 0 vie n UA .......... iP .......... 'sz uWT,IMF", J1, Ok. i i fix. • �.,G; .T"•. :Q'.. 5. �.��• _ Rz•Vr IP-• •• ._• __,.._ ��. :N .j' IBR " . nr .-. a —• q�°� ' '.wt" �y,''" ,7't�*,' k, ,r` •'4 e_� p� •ngv. R O A 3 G''�ri% '•'- ,.• ="fiM /'t. "Y �t ,�'`.• `\.�MO��O'A,R,,,�'.ucnr �>�•`. �•[�,}r, \ �r t C1d �'/ % -�� r � n�`"�'.::• '�••, f e.P�g+�\ +'Ntsyl?�a0erz �;,^.. ,/,.' •,_ -.^" � ,'� uu 3 \- .."�r� ,. t•4'rs'\I'4Fira �� )R.bf�R✓tr�i�..., 5: � . I /.• s':r' } tit` _`"s'R^�'�`r•'rF3F q1v p"& �•�"^.•� 6y:s`y NrFy�y'..,wt ',.•"r;l'-•mss k r, "�n`�� _ li,rr.• •%�,` ff ��•.�"�-;""_" FMEq a' sfayt /atfslR+ct rsry �".. ' !_r ap '�� s siR a�tl";�'... t +ba '�T`,:`d�„wa'r. R.a"� _ • /'. rM, w //d q...e^- . /.•f �u�rt°i�� ic�� - ror lwR t ` '�+"=a ``,�:.�.`�°Xsr �"a-r"`r��_ � -.. __ �+ s F�jyn yRr+".`\\•�. .re`'a'�'- .� i e 44 etF= di � 0.� •i a% #z�'• m�+:•.. """`+.~ "•"�� _ d G f�. .r,,•��. # r�3s.�zg� i. �. `�° ,fir 3. vr_.._.•....•�'"'.',.•"+' Fca'�, av e`oax•ec \\ ' �•:= •- I ti* F�t �34xt ° a • lFaj.� � •�. �,. 3 '•_�.. .Ert4 r ' •��,,,.,,, .. .• ., �4ris zS d� �$��� f -. Y£tf •S.< ,�+rtR yr`1z• ti Y+� ,�q. `*nv. y �`�\� "l— —..y :�' r• 'ick+Srtr�� 'Tt. � t14 i�q• �Y#' ,' i, G �n �,t•��•- �i' .,.^'�y�j•• ;£Sf$1 A.i ii�l j�� ��h R,�. )ry.�,�,�" � `(t f :i.�� ���.''�','� ...�.. � �..._ �f�4R- �� "i f,;,ay ....• � :.-'•. ftt �4�}6� r.-0t� Fiii.yc .,�.^. ". I P 3t. J. � —' - •/!f t "i v 14i�` �� � y, r __ .. �.. � ..,R•J•:t�.,.'� ':yr a"ot, ,�t7 `�y''11 _ '.�i G e - __ 0... _ y ^.,_ i _ •w;.•n.N�'un�, �''y;i r-., Q r• _. 3 4 �r ;"!::}` x�`;'!.r _ v •z.+u'„'• :..•' ^..;f�7<,7ilr�xti•, 2i:"F.^' S r^ •'t''"�" l w�r/'r�.,.:s"gym -l.` ''s •+` pY t t :..,•r:.:...r�::p�-.. r rte 2t i Y'J'j" .z,..__'risFi-• - Yr'i�,�A ;iu`4L i#tip'1., - 'J�.c:r: .r` .-.',:kms«• .J• Y. T%�- • �/ 'e0 Si ef' �� R °"•a. 'vt'+ r<zx;:.:.__'__:-_ ;fr�`;;":�_� :Y;ix2i��'i; _ �r�;f'ti,%�z-^;a::.Yt•:r_?;��-• i-�..,, i' f; - �'�v ....?av:,.t%ti:tt§Sid •. �.r�, .x.-. :r..•3rc'r 6 GSt•E .�. vDoiF°sRyo"ykT ::':.rte? ,z-. •:c ^r p,0 E ZL Qr`.Lry a� g(T(c m`ry Into'na :.'V.rJ�`, - t^2":1'�,?�ri`«;U-':t '.,.,. - n`a :naa•�: Kjp�° ^r kA s•� •mrs �R, Gra t .•MRc`reen ; «Eyre a+m`'a.,Y ��rb bs's+fFR°'M. 5 '+•.� 91 •`raM1p��Q�(`la F,t a ¢r•mc,��n � ,,`_ E;r;;�E��l 4Rq'[y`�n� f��O ti'.''" b9ht Prue-Qnr � 4`•��4'4 der! 1, ,+`ere 't2y iLl2bg fi y,� Y Pr© 1 n, •a....�.. Land°fps ase�e�xt 27861N kari ar°tea �Oad