HomeMy WebLinkAboutCotton, Shires, and Associates, Inc. (2)AGREEMENT
BY THIS AGREEMENT made and entered into on the 20th day of October, 2005, by and
between the TOWN OF LOS ALTOS HILLS (hereinafter referred to as TOWN) and:
Cotton, Shires & Associates, Inc.
330 Village Lane
Los Gatos, CA 95030
(408) 354-5542
(hereinafter referred to as CONSULTANT). In consideration of their mutual covenants, the
parties hereto agree as follows:
1. CONSULTANT. Shall provide or furnish the following specified services and/or materials:
Field Investigation, Geotechnical Analysis, Geotechnical Letter Report, and Engineering Design
Review services for the Robleda Road Pathway Improvements Project as outlined in Exhibit
64A.55
2. EXHIBITS. The following attached exhibits hereby are made a part of this Agreement:
Exhibit "A": Scope of Work, Schedule and Budget from CONSULTANT
3. TERMS. The services and/or materials furnished under this Agreement shall commence on
October 24, 2005 and shall be completed in accordance with the schedule included in Exhibit
"A."
4. COMPENSATION. For the full performance of this Agreement:
a. TOWN shall pay CONSULTANT: Time and materials not to exceed $9,000.00 as
further described in Exhibit "A".
5. GENERAL TERMS AND CONDITIONS.
a. HOLD HARMLESS with respect to operations. CONSULTANT agrees to indemnify,
defend and hold harmless the TOWN, its officers, agents and employees from any and all
demands, claims or liability of personal injury (including death) and property damage of
any nature, caused by or arising out of the performance of CONSULTANT under this
Agreement.
Professional Services: As respects to the performance of Professional Services under
this Agreement, CONSULTANT shall indemnify and hold harmless the TOWN,
including officers, employees, agents, and employees from any and all claims, demands,
costs including but not l'imi'ted to reasonable attorney.'.s fee and other costs of defense, or
liability to the extent arising from or connected with the Services provided hereunder due
to negligent act, errors, omissions or willful misconduct of the Consultant or anyone for
whom CONSULTANT is legally responsible.
b. INSURANCE. CONSULTANT shall file with the TOWN a certificate of insurance
before commencing any services under this agreement meeting minimum coverage
requirements established by TOWN's City Manager.
c. NON-DISCRIMINATION. No discrimination shall be made in the employment of
persons under this agreement because of the race, color, national origin, age, ancestry,
religion or sex of such person.
d. INTEREST OF CONSULTANT. It is understood and agreed that this agreement is not a
contract of employment in the sense that the relation of master and servant exists between
the TOWN and undersigned. At all times CONSULTANT shall be deemed to be an
independent CONSULTANT and CONSULTANT is not authorized to bind the TOWN
to any contracts or other obligations. In executing this agreement, CONSULTANT
certifies that no one who has or will have any financial interest under this agreement is an
officer or employee of the TOWN.
e. CHANGES. This agreement shall not be assigned or transferred without the written
consent of the TOWN. No changes or variations of any kind are authorized without the
written consent of the City Manager.
f. TERMINATION. This agreement may be terminated by the TOWN upon thirty (30) days
written notice to CONSULTANT. CONSULTANT may terminate this agreement upon
thirty (30) days written notice to the TOWN. Monies then owing based upon work
satisfactorily accomplished shall be paid to CONSULTANT.
6. INVOICING. All invoices shall be mailed or delivered to the attention of the City
Engineer (contract coordinator) at the address below.
This Agreement shall become effective upon its approval and execution by TOWN. In witness
whereof, the parties have executed this Agreement the day and year first written above.
CONTRACT COORDINATOR (TOWN) CONSULTAN -'
Name: Henry Louie, Director of Public Works By:
Town Hall
26379 Fremont Road
Los Altos Hills, CA 94022
(415) 941-7222
Title: A5S54'c fir_
Social Security �—
or I.R. S. Number: J'y
TOWN OF OS ALTOS HILLS
By: yy�"`�---''��
MAYOR
Attachment: Exhibit "A", Proposal for Geotechnical Investigation for the Robleda Road
Pathway Improvements Project
COTTON, SHIRES & ASSOCIATES, INC.
CONSULTING ENGINEERS AND GEOLOGISTS
September 7, 2005
(Revised)
P0485
TO: Mr. Henry Louie
Director of Public Works/City Engineer
TOWN OF LOS ALTOS HILLS
26379 Fremont Road
Los Altos Hills, California 94022
SUBJECT: Revised Proposal for Geotechnical Investigation
RE: Robleda Road Path Improvements, Los Altos Hills, California
Dear Mr. Louie:
We have been in comrnw-dcation ivith Dave Ross and Donald Toy of Mark
Thomas & Company, who indicated that it would be appropriate to provide you with
this proposal for professional services. This revised proposal reflects our recent
discussion with Dave Ross and reduces our proposed scope of work to provide the
most economic geotechnical investigation possible for this trail segment. We have cut
our planned number of borings in half, and have eliminated graphical products from our
proposed letter report (beyond a boring location map). The pathway improvement site
(approximately 500 feet in length) is located along the northern side of Robleda Road
and will require installation of some relatively long retaining walls. We propose to
complete exploratory borings and soil laboratory testing as a basis for developing
recommended geotechnical parameters for retaining wall design. We understand that
the recommended geotechnical design parameters resulting from our proposed scope of
work will be utilized by Mark Thomas & Company in the preparation of construction
plans, specifications and bid documents. We understand that completion of local
pathway improvements is a priority for the Town.
9 We have prepared a proposed scope of work and cost estimate for the
development of recommended geotechnical design parameters for new retaining walls at
the subject site. The purpose of our work will be to develop engineering design criteria
parameters through laboratory testing and analysis; prepare a letter report with design
recommendations; and review geotechnical aspects of draft construction documents.
We are proposing the following Scope of Work, Schedule and Fee to perform the work.
SCOPE OF WORK
I. Field Investigation
A. Field Mapping - An engineering geologic map of the trail alignment,
focusing on the distribution of existing artificial fill materials and
native earth materials, will be prepared by a Certified Engineering
Geologist. We will utilize the previously prepared site topographic
map. Engineering geologic cross sections will be prepared to
illustrate the subsurface distribution of earth materials.
B. Subsurface Investigation - Based on an inspection of site conditions,
it is apparent that a small portable (minuteman) drill rig is
necessary for the eastern portion of the pathway alignment. The
portable drill rig is needed due to overhead wires, close proximity of
Northern California Office Southern California Office
330 Village Lane 5245 Avenida Encinas • Suite A
Los Gatos, CA 95030-7218 Carlsbad, CA 92008-4374
(408)354-5542 • Fax (408) 354-1852 (760) 931-2700 • Fax: (760) 931-1020
e-mail: losgatos@cottonshires.com www.cottonshires.com e-mail: carlsbad®cottonshires.com
Mr. Henry Louie
Page 2
II.
M.
tV.
September 7, 2005
P0485
trees, and areas of minimal road shoulder width. Approximately 3
exploratory borings will be advanced (depth range 15 to 20 feet) to
characterize subsurface conditions. Subsurface material
characterization will directly influence wall design criteria including
pier lengths along wall alignments.
Geotechnical Analysis
A. Laboratory Testing - Representative samples from the field
exploration program will be tested for index properties to provide
retaining wall design criteria parameters.
B. Geotechnical;_ Analysis - Based on the collected field. data, and
laboratory test results, recommended retaining wall design criteria
parameters will be formulated.
Geotechnical Letter Report
A. Preparation of Letter Report — Results of our Field Investigation and
geotechnical design recommendations will be presented in a letter
report. Recommended retaining wall design criteria (active and
passive pressures, minimum pier depths and diameters, etc.) will be
presented.
Engineering Design Review
A. Geotechnical Review of Drawings and Technical Specifications - We
will review all geotechnical aspects of a draft set of plans and
specifications to verify consistency with the intent of our
geotechnical design recommendations.
SCHEDULE
We will schedule a drill rig for the projeof receipt of authorization to proceed.
We will complete Tasks I through III -A (outlined above) in roughly 6 weeks or 4 weeks
after completing subsurface investigation.
FEE
We propose to bill the Town for our services on a time -and -expenses basis in
accordance with our standing agreement for public works projects with the Town of Los
Altos Hills. We estimate the following fees for the corresponding tasks described above
will be:
Task
I. Field Investigation
II. Geotechnical Analysis Services
III. Geotechnical Letter Report
Fee
$3,000
$3,000
$2,000
COTTON, SHIRES & ASSOCIATES, INC.
Mr. Henry Louie September 7, 2005
Page 3 P0485
IV. Engineering Design Review **
**We have not provided you with a projected fee for Task IV, Engineering Design
Review Services. Due to the variability of design, it is difficult to project an accurate
cost estimate. Consequently we propose to invoice you on a time -and -expense basis in
accordance with the attached Schedule of Charges for this task. A Senior Geotechnical
Engineer will review the plans, provide consultation, and prepare the Design Review
Letter(s) and a Principal Geotechnical Engineer will review and provide quality control.
It is not unusual for a project of this size to require a budget of approximately $1,000 for
these services.
We. have not provided a detailed scope of work or fees for construction
inspection and testing. Because of the limited subsurface exploration completed for this
project, it will be important that representatives of our office monitor site grading and
drilling activities to verify satisfactory embedment into bearing material. We will invoice
you for Tasks I, II, and III on a monthly basis for a total not -to -exceed amount of $8,000.
AGREEMENT
If you agree with the Scope of Work, Schedule, and Fee outlined above, as well as
the Schedule of Charges, Limitation and Terms on file with the Town as part of our
existing contract, please sign one copy of this proposal and return it to our office.
Receipt of the signed proposal will constitute authorization for us to proceed.
We look forward to providing you with the professional services discussed
above. If you have any questions, or need additional information, please contact us.
Respectfully submitted,
COTTON, SHIRES AND ASSOCIATES, INC.
TOWN GEOTECHNICAL CONSULTANT
C%-��-� -
Ted Sayre
Supervising Engineering Geologist
Reviewed By:
Appr ed and Authorized By
Ts:DTs:klc
David T. Schrier
Date
COTTON, SHIRES & ASSOCIATES, INC.