Loading...
HomeMy WebLinkAboutPurissima Hills Water District (15)To: City Council CC: Planning Director From: - Jeff Petersen, City Manager Date: January 11, 1999 Re: - Request from Purissima Hills Water District for the installation of a well on Town property During this past fall, Town staff has worked with the Purissima Hills Water District ("District") as they have investigated the potential of various sites in Town for the installation of an emergency water supply well. The District Board has determined that the District needs to develop additional water supplies in preparation for any future disaster that may cut off their water supply from outside sources. - - The District has been looking for a site where a good aquifer exists and where a District water main is relatively close. One location which meets the District's _criteria is the Town Hall property. The District has a large diameter transmission main that is located on the north side of the Town Hall parking lot, which parallels the Heritage House fence. This main continues along the back property lines of the lots near Town Hall and connects to the District's tank- on Ascension Drive. Staff and the District's General Manager have discussed the possibility of locating a_ well behind the emergency generator on the west end of the Town -Hall parking area. This location would be screened from view from Town Hall as- well as from the adjacent neighbors, and would be within approximately twenty feet of the closest water main. The structure that would be visible above ground can be seen on the attached drawings. If this proposal is approved, a utility easement would be need to be granted to the District or a lease agreement would need to be entered into with the District. All costs associated with preparation of the agreement and or easement documents would be borne by District. F January 11, 1999 Staff intends to work with the District as they prepare an application to the Town for the well. In the meantime, please let me know if you have any comments or concerns about this proposal. 2 PRE5,50RE GAGE I I i 3(fl +/.. 00 - RE 1 N�='DKCED CbNCKM C�ROUN D SLAB - I - v - -CONNECT ION To YVftTEK MAIN SIDE - Y I E W ET WELL (S�Ci1D iV -t o RaCEIVED - — - — JAN 1999 - TOWN OF LOS ALTOS HILLS DESIGNED BY: JOB NO. L AYTONVILLE COUNT Y WATER DIST RIC T PGH I D Z3 IO REPLACE—MENT WA T ER WELL 2/3 _ DRAWN BY: DATE ✓7� HARRISCONSULTANTS, INC'_ WELL HGkb . 4 ITT m Ali _�T6P VIEW) Cc)KcRcT E P -k