Loading...
HomeMy WebLinkAboutPG&E (2)INTERCONNECTION AGREEMENT FOR NET ENERGY METERING ING Of SOLAR . OR WIND ELECTRIC G.ENERA!iNG.FACILITIE.S or 1,000 KILOWATTS OR LESS, OTHER THAN RESIDENTIAL OR SMALL COMMERCIAL FACILITIES OF 10 KILOWATTS OR LESS 2.5 Interconnected Equipment: List of generating equipment, interconnected with, or without, an inverter to PG&E, (For those gene rators. intercoh n ecti n g without an Inverter, write in "N/A" in the right.three columns, if an inverter Is shared by more than one generator, write "shared" on the same line as that generator under the manufacturer column and do not enter the inverter rating. Attach list of additional equipment, if applicable.) Type Of1 III II Manufacturer II II I of q1,1 Rating Inverter used Wjth� G6 nerator �So6r I Wind I Generator 0 f N AP 14 b I y r d) plicable) A C, 30, Ono: 36, C160 2.6 Customer -Generator's otherwlsewappllcablo* rate schedule under the provisionsof Schedule E -NET will be Pi a gibl VVInd Energy Co -Metering. Customer -Generators must be on a time -Of- . use rate s0edule, See Special Condition 5 of the E -NET tariff,) 2.7 The Generating Facility's. expected date of Initial Operatian is 3 15 ()5 The expected (late of Initial Operation shall be within two years of the date of this Agreement, 2.8 If the date of the permits allowing the Custorrfer-Genetator to commence construction of the Generating Facility Is prior to January 1, 2003, please provide the date the permits were issued: 1 U11 If Installing an inverter, the inverter rating equals: (the CEC efficiency for each installed inverter) TIMES (the nameplate rating, in kW, of each inverter), The CEC efficiency is obtained on the CEC website at http://www.consuterianergycenter.org/erprebatelellglbJe—inverters.html as listed on the date the application is reviewed. Enter the total of all inverter ratings for multiple inverter installations in the Table above. Form 79-978 Tariffs and Compliance Revised November 6, 2003 Effective January 1, 2003 Advice 2373 -E -B 2 P. 1 * * * COMMUNICATION RESULT REPORT ( JUN, 1,2005 5:20PM ) * * * FAX HEADER 1: TOWN OF LOS ALTOS HILLS FAX HEADER 2: TRANSMITTED/STORED : JUN. 1.2005 5:20PM FILE MODE OPTION ADDRESS RESULT PASSE ---------------------------------------------------------------------------------------------------- 0390 MEMORY TX 4159733050 OK 2/2 ---------------------------------------------------------------------------------------------------- REASON FOR ERROR E —I) 1 -IANC IU lP OR LINE FAIL E-2BSY E-9) NO ANSWER E-4) NO FACSIMILE CONNECTION LOSALT08 HIM. a CALIF0RNIA FACSIMILE TIKANSMITTAYL SHEET COD3P2N'X: 1 DATE: .TT NIS 1, 2005 FAX N riIBER; L -VOT 2 NLTMBZIt OF PAGES INCLUDING COVER; -1 9 -7 - PHONE HUMBER: RE: CANDIDATE'S INFORMATION t S"" y)uk-, VkA-ve-- a" ��L,VeA 263791TC1T1G1A3CRoad ORIGINAL 'VO FOLLOW! Las ,Altos Hills��`'�� � NO CalifOri5i,.A. 94022 650/941-7222 Fax 650/941-3160 Karen Jost From: Breene Kerr [breene@bkp.com] Sent: Wednesday, June 01, 2005 4:38 PM To: Kjost@losaltoshills.ca.gov Subject: Fwd: RE: Los Altos Hills Contract Revision Attachments: SCANO316_O0O.pdf SCAN0316_000. pdf(79 KB) Karen, could you print out, I will come by and sign and then you can fax?...I am still waiting to hear whether we need to send PG&E more money. If so, I can call Maureen. >Subject: RE: Los Altos Hills Contract Revision >Date: Wed, 1 Jun 2005 14:58:32 -0700 >X-MS--Has-Attach: yes >X-MS-TNEF-Correlator: >Thread -Topic: Los Altos Hills Contract Revision >Thread -Index: AcVmQAzh0OHPnpsrSZ67FVfMr05H4AArEO5AAAIdtVA= >Sensitivity: Private >From: "Greg McPheeters" <GMcpheeters@ecoenergies.com> >To: "Cheryl Hoffman" <CHoffman@ecoenergies.com>, <breene@bkp.com> >Cc: "Breene Kerr" <breene@bkp.com> >Thanks Cheryl - >Breene I printed the form out, edited the System information and called >Cindy Higby to find out what your old rate schedule was. >Sounds like you just need to print, initial, and fax to Caitlin Shaw >(or us) >Greg >Greg McPheeters >Engineering Manager >408 731 1217 >www.ecoenergies.com > ---------- >From: Cheryl Hoffman >Sent: Wednesday, June 01, 2005 2:00 PM >To: 'breene@bkp.com' >Cc: Greg McPheeters >Subject: FW: Los Altos Hills Contract Revision >Sensitivity: Private >-----Original Message ----- >From: Shaw, Caitlin J [mailto:CJSv@pge.com] >Sent: Tuesday, May 31, 2005 5:24 PM >To: Cheryl Hoffman >Cc: Turner, David L; Deffner, Darren D >Subject: Los Altos Hills Contract Revision >Sensitivity: Private 1 >Dear Cheryl, >In reviewing this file, I see that page 2 (attached) of the contract >(Form >79-978) requires revision before we can interconnect. The customer >still needs to select a rate schedule (section 2.6, requested on >January 19) and section 2.5, which should list the inverter equipment, is incomplete >Please have Breene Kerr (the Los Altos rep who signed the contract) >revise page two and initial the changes. Please fax the updated page 2 >as soon as possible. Thank you! ><<Los Altos Hills Form 79-978 p2.pdf>> >Best, >Caitlin J. Shaw >Associate Account Representative >Pacific Gas & Electric Company >CJSv@pge.com >Internal Phone: 8.223.1400 >External Phone: 415.973.1400 >Fax: 415.973.3050 >Mailing Address >Generation Interconnection Services >Pacific Gas and Electric Company >Mail Code N 7 L >245 Market Street >San Francisco, CA 94105-1702 >PLEASE NOTE: I will be out of the office the following dates in June: >6-9, 13, 20, 27-30 2