HomeMy WebLinkAboutDuxbury Architects/Savings by Design/PG&ED U X B U R Y ARCHITECTS Transmittal
............. ................. ...................... ............ ...................... -......... ..,........................... ......... ...........................
..,..
382A Firsf Sfreef, Los Alfos, CA 94022
650.917.3840 fax 917.3848
Name: Los Altos Hills Town Hall
Date: June 15, 2004
Via: ®
U.S. Postal Service
❑
Overnight Delivery
❑
Courier
❑
Hand
❑
Facsimile (Total of
Fax:
To: Michael Lesh
PGE / Savings By Design
615 7th Avenue
Santa Cruz, CA 95062
pages including cover)
JUN 16 2004
TOWN OF LOS ALTOS HILLS
(quantity,...,Description:............................................................................................................................................................ Date:...,...
.......... ..., .......
1 Signed 2004/05 Savings By Design -Design Team Incentive Agreement (3 pg) 06/10/04
Remarks:
By: SMG for PHD
c: Breen Kerr / LAHTH Chair
Bill McIntosh / Duxbury Architects
File: Al / C5 / Green Energy Folder
A i • H 0 is �y�'. a e
s
2004/05 SAVINGS BY DESIGN—DESIGN TEAM INCENTIVE AGREEMENT
Design Twin Leader h�forination
Duxbury Architects
FIRM NAME
382A First St.
ADDRESS
Peter Duxbury
CONTACT
Principal Architect
TITLE
Ff--,p q4.- 30 -/ 30 �; 5
FEDERAL TAX ID OR SOCIAL SECURITY NUMBER
Los Altos Hills Town Hall
PROJECT NAME
26379 Fremont Rd.
LOCATION
-Ta ail 1-6I�
BUILDING TYPE
8,500
Los Altos, CA
AAO'?'?
CITY/STATE ZIP CODE
peter@duxarx.com
E-MAIL
(650) 917-3840 _ (650) 917-3848
PHONE NO. FAX NO.
TAX STATUS -Corp. XNon-Corp. ❑ Exempt
Town of Los Altos Hills
EXEMPT REASON
OWNER'S NAME
Los Altos Hills CA 94022
CITY ZIP CODE
07/31/2005
AREA (SF) ESTIMATED COMPLETION DATE
PROJECT TYPE. PROGRAM TRACK:
® New Construction ❑ Renovation/ Remodel ® Track A ❑ Track B
Estimated Incentive h�fonnation
COMPLIANCE MARGIN: 1- 1
116.27 kBtu/sf/yr
PROPOSED BUILDING
161.85 kBtu/sf/yr
REFERENCE BASELINE
28.16
% BELOW TITLE 24
ELECTRIC INCENTIVE: $ 0.056 /kWh x 111,925 kWh/yr - 78,201 kWh/yr = $ 1,889
INCENTIVE RATE REFERENCE BASELINE DESIGN PROPOSED DESIGN INCENTIVE AMOUNT
GAS INCENTIVE: $ 0.255 / Therm x 1,582 Therm/yr - 1,362 Therm/yr = $ 56
INCENTIVE RATE I REFERENCE BASELINE DESIGN PROPOSED DESIGN INCENTIVE AMOUNT
X
PG&E Reviewer/Authorized Signature
Date
Page 1 of 3 2004/05 SBD DESIGN TEAMINCENTYPE AGREEMENT
- �� ...
-• xe
ars r � - •� _,t r - ".
ikm �s
_
4,_srR .� nR #.. ;
�, #9� , �S,N�'.
901
Track A Incentives
22.8 33,724 220 1,945
n;a
1,945
209
Other Systems
1.1/a
TOTALS
22.8 33,724 220 1,945
ilia
1,945
€'".Y,.. j E}'#
.. 'r�x- �'1J %.,e -,
�;: E r_ .a:. ,+fp is' n�s s3 .:XS ... �nc `�1ir *-f .]`.!u. xf': S? c.
..iii.
-3±•' ,, p� 1 - a -
901
Track B Incentives
900
Design Stipend
t1/il .gist t'ti
t tt,
209
Other Systems
TOTALS
X
PG&E Reviewer/Authorized Signature
Date
Page 1 of 3 2004/05 SBD DESIGN TEAMINCENTYPE AGREEMENT
TERMS AND CONDITIONS:
This Agreement is entered into by Pacific Gas & Electric Company (hereafter referred to as "PG&E") and the Design Team Leader
(hereafter referred to as "Leader") and is valid only if the Owner of the project identified under "Project Information" Section of this
Agreement has signed a Savings By Design Owner Agreement (hereafter referred to as "Owner Agreement"). This Agreement is a
one-time offer to provide a financial incentive to the Leader for participation in the Savings By Design program (`Program")
pursuant to the terms and conditions outlined herein and in the Savings By Design Program Documents ("Program Documents"). The
Program Documents are incorporated into this Agreement by reference and include 1) the Savings By Design brochure, 2) the
Savings By Design 2004/05 Participant Handbook, 3) the Design Team Incentive Application, and 4) the Whole Building Analysis
Instructions and Documentation Requirements, which details Program requirements for Design Teams, copies of which have been
provided to the Leader.
Funding approved for this Program is limited and will be paid on a first-come, first-served basis to qualified applicants. Funds will
only be reserved upon PG&E's execution of this Agreement. This incentive offer is subject to the availability of authorized funds.
This Agreement is valid for forty-eight (48) months from the date PG&E executes this Agreement. PG&E will deliver an executed
copy of this Agreement to the Leader after acceptance and execution by PG&E. PG&E reserves the right to modify or cancel the
incentive offer if the actual system(s) installed differs from the proposed installation. PG&E reserves the right to modify or
discontinue this Program without prior notice at its discretion, or by order of the CPUC. Payment of the incentives shall be made to
the Leader only after all program requirements are met and upon verification of installation by a PG&E Savings By Design Program
representative.
ELIGIBILITY:
• To be eligible for incentives under this Program, project must be a nonresidential new construction or renovation/remodel project
located within PG&E's service territory.
• The energy-efficient building design specified in the `Estimated Incentive Information" section of this Agreement (the "Proposed
Design") must exceed Title 24 Standards or a generally accepted industry standard for energy efficiency by at least 15 percent.
• . Estimated energy savings, and incentives calculated from those savings, will be based on energy efficiency improvements beyond
the minimum current Title 24 requirements, where applicable.
• To be eligible for incentives under this Program, Design Team Leader agrees that they will not apply for or receive any other
incentive offered by local or state entities or utilities for measures covered under this Agreement.,
LEADER AGREES TO:
• Support the installation of the Proposed Design as described by the submitted documents. This includes obtaining and
maintaining all licenses and permits required by Leader and other Design Team members to complete work on this Project.
• Provide PG&E with all documentation necessary for verification of installation and performance of the Proposed Design prior to
payment of incentives.
• Provide, at PG&E's request, proof of insurance appropriate to provide coverage given the scope of the project.
• Accept as final authority, PG&E's determination of the incentive amount. Furthermore, Leader understands that PG&E makes no
representations and warranties as to proper installation, product endorsement, technical feasibility, operational capability, and/or
reliability of equipment for which incentives. are paid.
• Design Team Leader also agrees NOT to represent or warrant to any third party that PG&E's review of the energy efficiency
measures (EEMs) or analysis of the energy efficiency of any aspect of the building project or design is in any way a
representation by PG&E as to the economic or technical feasibility, operational capability, or reliability of such building design
or EEMs, and agrees to indemnify PG&E in the event said representations and warranties are made to third parties. Leader
further acknowledges that any incentive paid is funded through Public Goods Charges from California ratepayers and that said
incentives are intended for the benefit of customers of California utilities.
• Leader shall indemnify, defend and hold harmless PG&E, its affiliates, subsidiaries, parent company, officers, directors, agents
and employees from and against all claims, losses, damages, costs, expenses and liability arising from 1) injury to persons or
property, 2) death, 3) violation of any law or regulation (including those that establish strict liability); to the extent such injury,
violation or strict liability is.caused by Design Team Leader's performance of this Agreement. Design Team Leader shall, at
PG&E request, provide a defense against any claim covered by this indemnity.
• In no instance shall PG&E be liable for any incidental, special, or consequential damage as a result of this Agreement.
• Indemnify PG&E, its affiliates, subsidiaries, parent company, officers, directors, agents, and employees against all loss, damage,
expense, and liability resulting from any monetary dispute among design team members that may arise regarding the payment of
the incentive pursuant to this Agreement.
• Participate in a measurement and evaluation study to analyze current program performance and/or improve future program
design, if selected by PG&E. Leader agrees to fully cooperate with study team if asked to participate.
Page 2 of 3 2004105 SBD DESIGN TEAM INCENTIVE AGREEMENT
TAX LIABILITY:
Incentives may be taxable and will be reported by PG&E to the IRS unless Design Team Leader qualifies under an exempt status.
PG&E will report the incentive as income to Design Team Leader on IRS Form 1099 unless Design Team Leader has established that
they qualify for an exempt tax status as indicated on this Agreement. Design Team Leader is urged to consult a tax advisor
concerning the taxability of incentives. PG&E is not responsible for any taxes that may be imposed due to incentive payments.
PG&E MAKES NO WARRANTY, WHETHER STATUTORY, EXPRESS OR IMPLIED, INCLUDING, BUT NOT
LIMITED TO ANY WARRANTIES REGARDING THE DESIGN, CONSTRUCTION, EQUIPMENT, OR
INSTALLATIONS REFERRED TO HEREIN, OR THE BENEFITS TO BE DERIVED FROM THE INSTALLATION,
OPERATION, AND USE OF SUCH EQUIPMENT OR DESIGN, OR ANY WARRANTY OF MERCHANTABILITY OR
FITNESS FOR ANY PARTICULAR USE OR APPLICATION. NO AGENT, EMPLOYEE, OR REPRESENTATIVE OF
PG&E HAS AUTHORITY TO BIND PG&E TO ANY AFFIRMATION, REPRESENTATION, OR WARRANTY UNLESS
EXPRESSLY MADE AND AGREED TO IN WRITING BY PG&E.
By execution of this Agreement, Leader certifies that the Proposed Design meets all the program eligibility requirements and that the
information supplied on the Agreement is true and correct. Leader certifies that Leader has read and understands all Program
Documents and agrees to abide by all program rules and requirements set forth in the Program Documents. To be valid, this
Agreement must be signed by all parties prior to December 31, 2005.
In witness whereof, the parties have executed this Agreement as of the date last set forth below.
Peter Duxbury
DESIGN TEAM LEADER (PRINT NAME FROM ABOVE)
Principal Architect
TITLE
DATE
PACIFIC GAS & ELECTRIC COMPANY
SIGNATURE
AUTHORIZED REPRESENTATIVE (PRINT NAME FROM ABOVE)
Program Manager, Non -Residential New
Construction
TITLE DATE
Page 2 of 3 2004105 SBD DESIGN TEAM INCEN77VE AGREEMENT