HomeMy WebLinkAboutCSG ConsultantsAGREEMENT
THIS AGREEMENT is made and entered into on theday of August, 2023 by and
between the TOWN OF LOS ALTOS HILLS (hereinafter referred to as "TOWN") and CSG
Consultants (hereinafter referred to as "CONTRACTOR"). In consideration of their
mutual covenants, the parties hereto agree as follows:
1. CONTRACTOR. Shall provide or furnish the following specified services and/or
materials:
Construction Inspection Services for the 2023 Pavement
Rehabilitation and Drainage Improvement Project
2. EXHIBITS. The following attached exhibits are hereby incorporated into and made a
part of this Agreement:
Proposal from CONTRACTOR dated August 3, 2023
3. TERMS. The services and/or materials furnished under this Agreement shall
commence August 23, 2023 and shall be completed by November 30, 2023, unless
terminated pursuant to Section 5(f).
4. COMPENSATION. For the full performance of this Agreement:
a. TOWN shall pay CONTRACTOR an amount not to exceed Forty-nine thousand
eight hundred thirty dollars and zero cents ($49,830.00) within thirty (30) days
following receipt of invoice and completion/delivery of services/goods as detailed
in Sections 1, 2, and 3 of this Agreement and only upon satisfactory
delivery/completion of goods/services in a manner consistent with
professional/industry standards for the area in which CONTRACTOR operates.
TOWN is not responsible for paying for any work done by CONTRACTOR or any
subcontractor above and beyond the not to exceed amount.
b. Town shall not reimburse for any of CONTRACTOR's costs or expenses to deliver
any services/goods. Town shall not be responsible for any interest or late charges
on any payments from Town to CONTRACTOR.
c. CONTRACTOR is responsible for monitoring its own forces/employees/agents/
subcontractors to ensure delivery of goods/services within the terms of this
Agreement. TOWN will not accept or compensate CONTRACTOR for incomplete
goods/services.
Town of Los Altos Hills Page 1 of 5
Short form
Updated 4/26122
5. GENERAL TERMS AND CONDITIONS.
a. HOLD HARMLESS. CONTRACTOR agrees to indemnify, defend and hold
harmless the TOWN, its officers, agents and employees from any and all demands,
claims or liability of personal injury (including death) and property damage of any
nature, caused by or arising out of the performance of CONTRACTOR under this
Agreement. With regard to CONTRACTOR'S work product, CONTRACTOR
agrees to indemnify, defend and hold harmless the TOWN, its officers, agents and
employees from any and all demands, claims or liability of any nature to the extent
caused by the negligent performance of CONTRACTOR under this Agreement.
b. INSURANCE. CONTRACTOR shall file with the TOWN a certificate of insurance
before commencing any services under this Agreement as follows:
WORKERS COMPENSATION INSURANCE: Minimum statutory limits.
ii. COMMERCIAL GENERAL LIABILITY AND PROPERTY DAMAGE
INSURANCE: General Liability and Property Damage Combined.
$1,000,000.00 per occurrence including comprehensive form, personal
injury, broad form personal damage, contractual and
premises/operation, all on an occurrence basis. If an aggregate limit
exists, it shall apply separately or be no less than two (2) times the
occurrence limit.
iii. AUTOMOBILE INSURANCE: $1,000,000.00 per occurrence.
iv. ERRORS AND OMISSIONS INSURANCE: $1,000,000.00 aggregate.
v. NOTICE OF CANCELLATION: The City requires 30 days written notice
of cancellation. Additionally, the notice statement on the certificate
should not include the wording "endeavor to" or "but failure to mail such
notice shall impose no obligation or liability of any kind upon the
company, its agents or representatives."
vi. CERTIFICATE OF INSURANCE: Prior to commencement of services,
evidence of insurance coverage must be shown by a properly executed
certificate of insurance and it shall name "The Town of Los Altos Hills,
its elective and appointed officers, employees, and volunteers" as
additional insureds.
vii. To prevent delay and ensure compliance with this Agreement, the
insurance certificates and endorsements must be submitted to:
Town of Los Altos Hills Page 2 of 5
Short form
Updated 4126122
Town of Los Altos Hills
26379 Fremont Road
Los Altos Hills, CA 94022
c. NON-DISCRIMINATION. No discrimination shall be made in the employment of
persons under this Agreement because of the race, color, national origin, age,
ancestry, religion or sex of such person.
d. INTEREST OF CONTRACTOR. It is understood and agreed that this Agreement
is not a contract of employment and does not create an employer-employee
relationship between the TOWN and CONTRACTOR. At all times
CONTRACTOR shall be an independent contractor and CONTRACTOR is not
authorized to bind the TOWN to any contracts or other obligations without the
express written consent of the TOWN. In executing this Agreement,
CONTRACTOR certifies that no one who has or will have any financial interest
under this Agreement is an officer or employee of TOWN.
e. CHANGES. This Agreement shall not be assigned or transferred without advance
written consent of the TOWN. No changes or variations of any kind are authorized
without the written consent of the City Manager. This Agreement may only be
amended by a written instrument signed by both parties.
f. TERMINATION. This Agreement may be terminated by TOWN upon seven (7)
days written notice to CONTRACTOR. Monies owed for work satisfactorily
completed shall be paid to CONTRACTOR within 14 days of termination.
g. RECORDS. All reports, data, maps, models, charts, studies, surveys,
calculations, photographs, memoranda, plans, studies, specifications, records,
files, or any other documents or materials, in electronic or any other form, that are
prepared or obtained pursuant to this Agreement and that relate to the matters
covered hereunder shall be the property of the TOWN. CONTRACTOR hereby
agrees to deliver those documents to the TOWN at any time upon demand of the
TOWN. It is understood and agreed that the documents and other materials,
including but not limited to those described above, prepared pursuant to this
Agreement are prepared specifically for the TOWN and are not necessarily
suitable for any future or other use. Failure by CONTRACTOR to deliver these
documents to the TOWN within a reasonable time period or as specified by the
TOWN shall be a material breach of this Agreement. TOWN and CONTRACTOR
agree that until final approval by TOWN, all data, plans, specifications, reports and
other documents are preliminary drafts not kept by the TOWN in the ordinary
course of business and will not be disclosed to third parties without prior written
consent of both parties. All work products submitted to the TOWN pursuant to this
Agreement shall be deemed a "work for hire." Upon submission of any work for
hire pursuant to this Agreement, and acceptance by the TOWN as complete, non-
exclusive title to copyright of said work for hire shall transfer to the TOWN. The
compensation recited in Section 4 shall be deemed to be sufficient consideration
Town of Los Altos Hills Page 3 of 5
Short form
Updated 4126122
for said transfer of copyright. CONTRACTOR retains the right to use any project
records, documents and materials for marketing of their professional services.
h. CONTRACT ADMINISTRATION. The TOWN hereby designates [insert applicable
staff title] and the City Manager as Contract Administrator for this agreement. The
CONTRACTOR shall only take direction regarding the services provided under this
Agreement from the Contract Administrator. Furthermore, CONTRACTOR agrees
that the Contract Administrator shall be included any meeting, teleconference or
written communication between any Town representative including Committee
members and the CONTRACTOR. The TOWN may modify the Contract
Administrator at any time upon providing written notice to the CONTRACTOR.
i. ENTIRE AGREEMENT. This Agreement represents the entire agreement
between the Parties. Any ambiguities or disputed terms between this Agreement
and any attached Exhibits shall be interpreted according to the language in this
Agreement and not the Exhibits.
6. INVOICING. Send all invoices to the contract coordinator at the address below.
This Agreement shall become effective upon its approval and execution by TOWN. In
witness whereof, the parties have executed this Agreement the day and year first written
above.
CONTRACT COORDINATOR and
representative for TOWN:
John Chau
Associate Engineer
Town of Los Altos Hills
26379 Fremont Road
Los Altos Hills, CA 94022
CONTRACTOR:
By: 8-22-2023
Sign I Date
Cyrus Kianpour, President
Print name, Title
TOW
Town of Los Altos Hills Page 4 of 5
Short form
Updated 4126/22
CONSULTANTS
Employee-Owned
August 3, 2023
John Chau
Associate Engineer/Engineering CIP
Town of Los Altos Hills
26379 Fremont Road
Los Altos Hills, CA 94022
550 Pilgrim Drive
Foster City, CA 94404
Phone: 650.522.2500
Fax: 650.522.2599
www.csgengr.com
Re: Construction Inspection Services for the 2023 Pavement Rehabilitation and Drainage Improvement
Project
CSG Consultants, Inc. (CSG) is pleased to present this proposal to the Town of Los Altos Hills (City) to provide
construction Inspection services.
SCOPE OF SERVICES
CSG has reviewed the project plans & specifications and understands that the project scope in general
consists of a combination of various pavement rehabilitation methods and techniques including: AC
overlay; 6" digouts; AC leveling course; Slurry Seal; pavement markings replacement as well as utility
adjustments at various roadway locations throughout the Town..
CSG's construction inspector will perform inspection for work progress to ensure compliance with the
project plans, specifications, and approved submittals throughout the project's construction. General
duties will include daily photos and record keeping, prepare and distribute daily inspection reports,
coordinate inspections with utility companies and residents, coordinate and oversee compaction
testing, and report instances of non-compliant work. CSG's construction inspector will also serve as the
inspector of record and create redlines on as -built drawings for work inspected.
PERSONNEL
CSG proposes Jim Mazzone to provide construction Inspection for this project. Mr. Mazzone has over 33
years of public sector experience in the fields of construction inspection, construction management, and
project management. He has previously performed inspection for the Town, including the 201.9, 2020,
2022 and 2922 Pavement Rehabilitation Project, and is knowledgeable of the Town's processes and
procedures and is familiar with Town staff.
FOSTER CITY I PLEASAWroN I, SAN 105E I SACRAMENTd I NtWMAN I FRESO I PASO ROOLES I o.RANGE
C UIN . s: r -.';'I; 11N?F�:Ti;DN lay C.ii
FEE
CSG understands this project is to be completed in 30 working days. CSG Is alotting 8 hours of
preconstruction work, 20 hours for closeout, and 17 hours of overtime.
Rates reflect and Include administrative costs and routine expenses such as local mileage, copying, fax, telephone,
mail, in-house printing, software, and computer usage.
We look forward to continuing our working relationship with the Town of Los Altos Hills. If you have any
questions, please contact me at (650) 522-2524 or by email at nourdin@csgengr.com.
Sincerely,
Nourdin Khayata, PE
Vice President, Construction Management
Construction Inspector
AF VL
CONSULTANTS
EDUCATION Mr. Mazzone has over 33 years of public sector experience in the fields of construction
Bachelor of Science, Civil Engineering inspection, construction management, and project management. Prior to joining CSG, Mr.
University of Lowell Mazzone was a Public Works Inspector for the City of Santa Clara. This role allowed him to
Lowell, MA
manage and inspection large and small-scale public improvement projects.
The variety of projects Jim has worked on include paving and grading, pavement marking
and striping, sewer and storm drain installation, ADA ramp construction, traffic signal and
traffic signal interconnect construction, management of highway heavy constriction,
Including cast -in-place pre -stressed concrete bridges, underground, earthwork, grading
and paving and pile driving.
RELEVANT EXPERIENCE
2021 Annual Pavement Project I Town of Los Altos Hills, CA
2020 Annual Pavement Project I Town of Los Altos Hills, CA
Annual Pavement Project I Town of Hillsborough, CA
2020 Pavement Rehabilitation Project I City of Daly City, CA
Mr. Mazzone served as the primary construction inspector for this federally funded pavement
rehabilitation project, The scope Involved the removal and replacement of hot mix asphalt, dig
out repairs, FDR treatment method, signage, and striping. The project also involved ADA curb
ramp upgrades, sidewalk and C & G replacements, and utility adjustments.
Edgewater Boulevard Pavement Rehabilitation Project I City of Foster City, CA
Mr. Mazzone served as the construction inspector for this federally funded pavement
rehabilitation project. The scope involved the removal and replacement of hot mix asphalt with
dig out repairs and striping which incorporated buffered bike lanes and bicycle facility markings.
The project also included 20 ADA ramps upgrades, sidewalk replacement, and utility
adjustments.
2019 Pavement Rehabilitation Project I Town of Los Altos Hills, CA
As a construction Inspector for this pavement project, Mr. Mazzone inspected a combination of
several pavement rehabilitation methods including slurry seal, digouts, 2,235 tons of 1.5" AC
overlay, and 1,184 tons of 2" AC. Traffic control and coordination with residents were critical
elements to the success of this project.
Public Works Inspector I City of Santa Clara, CA
Mr. Mazzone served as a public works inspector for the City of 6 years. During this time he
Inspected numerous capital improvement and private development projects which included
roadway, sewer, and waterline improvements. The following is a sample of the projects on which
Mr. Mazzone has managed:
• 2018 Pavement Surface Treatment Project: Project Cost $4.7 million, included 13,500
tons of deep lift AC, 315,000 SY of slurry seal, 147,000 SY of rubberized chip seal, 170
ADA ramps, 70 traffic loops and all associated striping and signage
• Graham Neighborhood Rebuild: Reconstruction of approximately 4000 LF of
neighborhood road and sidewalk
• San Thomas Creek Trail on Street Enhancement Project: Project included AC, slurry
seal, green colored bicycle lane Thermoplastic, and associated signage and striping
• Tasman Bicycle Lane Improvements: Project Cost $512,000. Project included slurry
seal, and all associated striping and signage
• Mission College Bike Lane: Project Cost $415,000. Project included AC deep lift repair,
slurry seal and striping
® 2015-2016 curb ramp project: Project included 72 curb ramps
• 2016-2017 curb ramp project: Project included 50 curb ramps
0 2018 Pavement Surface Treatment Project: Project included 170 Ramps
CONSULTANTS
Rabello and Northside lift station Generator project: Project Cost $1.1 Million Project included
installation of a 750 kVA, 600 KW and 437 kVA 350 KW Generators including the associated transfer switches,
switch gear and fuel tanks
Rabello Flow Meter, Pump Station, and Appurtenance Project: Project cost $2.2 Million. Project Included
structural modifications and additions to the Rabello, Northside lift stations and the sewer treatment outfall
structure. The project also included modification to piping, installation of new flow meters and all the associated
electrical, water, and control work.
Other duties while serving as a public works inspector have included:
• Encroachment Permits: Inspected approximately 400 encroachment permits. Permits included: paving and
grading, curb, gutter and sidewalks, ADA ramps, driveway approaches, traffic signals, sewer, water, and storm
drain piping, pump stations, striping and traffic signage.