HomeMy WebLinkAboutCSG Consultants (3)AGREEMENT
THIS AGREEMENT is made and entered into on the3Oday of November, 2023 by and
between the TOWN OF LOS ALTOS HILLS (hereinafter referred to as "TOWN") and CSG
Consultants (hereinafter referred to as "CONTRACTOR"). In consideration of their
mutual covenants, the parties hereto agree as follows:
1. CONTRACTOR. Shall provide or furnish the following specified services and/or
materials:
Construction Inspection Services for pavement restoration and construction of the
Viscaino Rd Sewer Main Extension project
2. EXHIBITS. The following attached exhibits are hereby incorporated into and made a
part of this Agreement:
Proposal from CONTRACTOR dated October 6, 2023
3. TERMS. The services and/or materials furnished under this Agreement shall
commence December 1, 2023 and shall be completed by December 29, 2023, unless
terminated pursuant to Section 5(f).
4. COMPENSATION. For the full performance of this Agreement:
a. TOWN shall pay CONTRACTOR an amount not to exceed Twenty thousand
dollars and zero cents ($20,000.00) within thirty (30) days following receipt of
invoice and completion/delivery of services/goods as detailed in Sections 1, 2, and
3 of this Agreement and only upon satisfactory delivery/completion of
goods/services in a manner consistent with professional/industry standards for the
area in which CONTRACTOR operates. TOWN is not responsible for paying for
any work done by CONTRACTOR or any subcontractor above and beyond the not
to exceed amount.
b. Town shall not reimburse for any of CONTRACTOR's costs or expenses to deliver
any services/goods. Town shall not be responsible for any interest or late charges
on any payments from Town to CONTRACTOR.
c. CONTRACTOR is responsible for monitoring its own forces/employees/agents/
subcontractors to ensure delivery of goods/services within the terms of this
Agreement. TOWN will not accept or compensate CONTRACTOR for incomplete
goods/services.
Town of Los Altos Hills Page 1 of 5
Short form
Updated 4/26/22
5. GENERAL TERMS AND CONDITIONS.
a. HOLD HARMLESS. CONTRACTOR agrees to indemnify, defend and hold
harmless the TOWN, its officers, agents and employees from any and all demands,
claims or liability of personal injury (including death) and property damage of any
nature, caused by or arising out of the performance of CONTRACTOR under this
Agreement. With regard to CONTRACTOR'S work product, CONTRACTOR
agrees to indemnify, defend and hold harmless the TOWN, its officers, agents and
employees from any and all demands, claims or liability of any nature to the extent
caused by the negligent performance of CONTRACTOR under this Agreement.
b. INSURANCE. CONTRACTOR shall file with the TOWN a certificate of insurance
before commencing any services under this Agreement as follows:
WORKERS COMPENSATION INSURANCE: Minimum statutory limits.
COMMERCIAL GENERAL LIABILITY AND PROPERTY DAMAGE
INSURANCE: General Liability and Property Damage Combined.
$1,000,000.00 per occurrence including comprehensive form, personal
injury, broad form personal damage, contractual and
premises/operation, all on an occurrence basis. If an aggregate limit
exists, it shall apply separately or be no less than two (2) times the
occurrence limit.
iii. AUTOMOBILE INSURANCE: $1,000,000.00 per occurrence.
iv. ERRORS AND OMISSIONS INSURANCE: $1,000,000.00 aggregate.
v. NOTICE OF CANCELLATION: The City requires 30 days written notice
of cancellation. Additionally, the notice statement on the certificate
should not include the wording "endeavor to" or "but failure to mail such
notice shall impose no obligation or liability of any kind upon the
company, its agents or representatives."
vi. CERTIFICATE OF INSURANCE: Prior to commencement of services,
evidence of insurance coverage must be shown by a properly executed
certificate of insurance and it shall name "The Town of Los Altos Hills,
its elective and appointed officers, employees, and volunteers" as
additional insureds.
vii. To prevent delay and ensure compliance with this Agreement, the
insurance certificates and endorsements must be submitted to:
Town of Los Altos Hills Page 2 of 5
Short form
Updated 4/26/22
Town of Los Altos Hills
26379 Fremont Road
Los Altos Hills, CA 94022
c. NON-DISCRIMINATION. No discrimination shall be made in the employment of
persons under this Agreement because of the race, color, national origin, age,
ancestry, religion or sex of such person.
d. INTEREST OF CONTRACTOR. It is understood and agreed that this Agreement
is not a contract of employment and does not create an employer-employee
relationship between the TOWN and , CONTRACTOR. At all times
CONTRACTOR shall be an independent contractor and CONTRACTOR is not
authorized to bind the TOWN to any contracts or other obligations without the
express written consent of the TOWN. In executing this Agreement,
CONTRACTOR certifies that no one who has or will have any financial interest
under this Agreement is an officer or employee of TOWN.
e.. CHANGES. This Agreement shall not be assigned or transferred without advance
written consent of the TOWN. No changes or variations of any kind are authorized
without the written consent of the City Manager. This Agreement may only be
amended by a written instrument signed by both parties.
f. TERMINATION. This Agreement may be terminated by TOWN upon seven (7)
days written notice to CONTRACTOR. Monies owed for work satisfactorily
completed shall be paid to CONTRACTOR within 14 days of termination.
g. RECORDS. All reports, data, maps, models, charts, studies, surveys,
calculations, photographs, memoranda, plans, studies, specifications, records,
files, or any other documents or materials, in electronic or any other form, that are
prepared or obtained pursuant to this Agreement and that relate to the matters
covered hereunder shall be the property of the TOWN. CONTRACTOR hereby
agrees to deliver those documents to the TOWN at any time upon demand of the
TOWN. It is understood and agreed that the documents and other materials,
including but not limited to those described above, prepared pursuant to this
Agreement are prepared specifically for the TOWN and are not necessarily
suitable for any future or other use. Failure by CONTRACTOR to deliver these
documents to the TOWN within a reasonable time period or as specified by the
TOWN shall be a material breach of this Agreement. TOWN and CONTRACTOR
agree that until final approval by TOWN, all data, plans, specifications, reports and
other documents are preliminary drafts not kept by the TOWN in the ordinary
course of business and will not be disclosed to third parties without prior written
consent of both parties. All work products submitted to the TOWN pursuant to this
Agreement shall be deemed a "work for hire." Upon submission of any work for
hire pursuant to this Agreement, and acceptance by the TOWN as complete, non-
exclusive title to copyright of said work for hire shall transfer to the TOWN. The
compensation recited in Section 4 shall be deemed to be sufficient consideration
Town of Los Altos Hills Page 3 of 5
Short form
Updated 4/26/22
for said transfer of copyright. CONTRACTOR retains the right to use any project
records, documents and materials for marketing of their professional services.
h. CONTRACT ADMINISTRATION. The TOWN hereby designates [insert applicable
staff title] and the City Manager as Contract Administrator for this agreement. The
CONTRACTOR shall only take direction regarding the services provided under this
Agreement from the Contract Administrator. Furthermore, CONTRACTOR agrees
that the Contract Administrator shall be included any meeting, teleconference or
written communication between any Town representative including Committee
members and the CONTRACTOR. The TOWN may modify the Contract
Administrator at any time upon providing written notice to the CONTRACTOR.
ENTIRE AGREEMENT. This Agreement represents the entire agreement
between the Parties. Any ambiguities or disputed terms between this Agreement
and any attached Exhibits shall be interpreted according to the language in this
Agreement and not the Exhibits.
6. INVOICING. Send all invoices to the contract coordinator at the address below.
This Agreement shall become effective upon its approval and execution by TOWN. In
witness whereof, the parties have executed this Agreement the day and year first written
above.
CONTRACT COORDINATOR and
representative for TOWN:
Daniel Liang
Utility Engineering Manager
Town of Los Altos Hills
26379 Fremont Road
Los Altos Hills, CA 94022
Town of Los Altos Hills
Short form
Updated 4/26/22
CONTRACTOR:
By: 11-27-2023
Signature Date
Nourdin Khayata, Secretary
Print name, Title
TOWN O TO HILLS:
By:
Peter Pirneja City Manager Date
Page 4 of 5
CSG
CONSULTANTS
Employee-Owned
October 6, 2023
Melissa Elian-Carrillo
Assistant Engineer
Town of Los Altos Hills
26379 Fremont Road
Los Altos Hills, CA 94022
550 Pilgrim Drive
Foster City, CA 94404
Phone: 650.522.2500
Fax: 650.522.2599
www.csgpngr.com
Re: Construction Inspection Services for an Emergency Project to Restore a Failing Railway (Project)
CSG Consultants, Inc. (CSG) is pleased to present this. proposal to the Town of Los Altos Hills (Town) to
provide construction inspection services.
SCOPE OF SERVICES
CSG understands that the Town is seeking full-time construction inspection for an emergency project to
restore a failing roadway. CSG understands that the project duration will be two weeks (10 working
days) beginning on Tuesday, October 10, 2023.
CSG's construction inspector will perform inspection for work progress to ensure compliance with the
project plans, specifications, and approved submittals throughout the project's construction. General
duties will include daily photos and record keeping, prepare and distribute daily inspection reports,
coordinate inspections with utility companies and residents, coordinate and oversee compaction
testing, and report instances of non-compliant work. CSG's construction inspector will also serve as the
inspector of record and create redlines on as -built drawings for work inspected.
PERSONNEL
CSG proposes Saeid Mostafavi to provide construction inspection for this project. Mr. Mostafavi's
experience encompasses over 30 years of various public works construction efforts including roadway
rehabilitation, underground water, sewer, storm and utility improvements, traffic improvements and
SWPPP compliance. He is familiar with standards and best practices established by Caltrans in the
Standard Plans and Specifications, as well as "Greenbook" Standards for Public Works Inspection and
various other applicable standards for public works construction.
FOSTER CITY I PLEASANTON I SAN JOSE I SACRAMENTO I NEWMAN I FRESNO I PASO ROBLES I ORANGE
CSG PROPOSAL TO THE TOWN OF LOS ALTOS HILLS
CONSTRUCTION INSPECTION SERVICES
FEE
Provided below is CSG's proposed fee for this project. The cost estimate does not include overtime or
weekend work. CSG is budgeting for two weeks of work (80 hours).
Rates reflect and include administrative costs and routine expenses such as local mileage, copying, fax, telephone,
mail, in-house printing, software, and computer usage.
We look forward to continuing our working relationship with the Town of Los Altos Hills. If you have any
questions, please contact me at (650) 522-2524 or by email at nourdin@csgengr.com.
Sincerely,
Nourdin Khayata, PE
Vice President, Construction Management
Saeid Mostafavi CSG
CONSULTANTS
Construction Inspector
EDUCATION
Mr. Mostafavi's experience encompasses over 30 years of various public works
Bachelors of Science, Mechanical
construction efforts including roadway rehabilitation, underground water, sewer, storm
Engineering
and utility improvements, traffic improvements and SWPPP compliance. He is familiar
University of Texas
with standards and best practices established by Caltrans in the Standard Plans and
EI Paso, TX
Specifications, as well as "Greenbook" Standards for Public Works Inspection and various
other applicable standards for public works construction. Mr. Mostafavi has been trained
KEY QUALIFICATIONS
in National Pollutant Discharge Elimination System (NPDES) compliance Issues and Is very
Assistant Resident Engineer I
knowledgeable in applying those mandates in his assessment of construction sites. He is
Construction Manager (Contract
also experienced in MTC's Pavement Management Program and can perform PCI Distress
Administration)
Identification Inspections.
Construction Inspection I
Mr. Mostafavi has worked as project inspector for a number of cities in Northern
Transportation
California including Colma, Redwood City, Hillsborough, East Palo Alto, San Bruno, and
(roads, trails, parking lots, underground
South San Francisco.
utilities)
Consulting Engineer I Industrial
RELEVANT EXPERIENCE
Processes
Crystal Springs - EI Cerrito Phase II Sewer Improvement I Town of Hillsborough, CA
Business owner I Transportation
Mr. Mostafavi served as the lead construction inspector for the installation of over two miles
Industry
of 26"-28" fusible high density polyethylene ( HDPE) gravity sewer main to replace the existing
pipe. The project included the installation of over 60 new sewer manholes, 75 service lateral
NPDES SWPPP Storm Water Seminar/
re -connections, system bypassing through portions of the existing pipeline, and four drilled
QSP Training
concrete stitch pier walls to stabilize the adjacent San Mateo Creek embankment and support
MTC Pavement Distress
the utility work.
Street Resurfacing Project I Town of Hillsborough, CA
Mr. Mostafavi served as the primary construction Inspector for the rehabilitation of
approximately 26 miles of roadways. The rehabilitation included Asphalt Concrete Overlay,
Cape Seal, Microsurfacing, and Crack Sealing treatments. His duties included verifying limits of
work, observing the placement of materials and ensuring they are in accordance with the
Design and Specifications, as well as to document the construction activities and reporting to
the Resident Engineer of the progress. Mr. Mostafavi maintained a Daily Report outlining that
type of work performed as well as the crews and equipment utilized on site, and provided
photographic documentation to support the written report. He was also responsible for
keeping up to date quantities and red -lines of any changes to accurately record any approved
changes to the contract documents.
Redwood City Recycle Water Project I City of Redwood City, CA
As construction inspector, Mr. Mostafavi oversaw the installation of 2,300 feet of recycled
water double containment HDPE pipe and 3,250 feet of recycled water PVC pipe, ranging
from 8" to 20" in diameter. The project included HDPE fusions, new leak detection structures,
ductile iron fitting and joint restraints, butterfly and gate valves, blow -offs, air valves, recycled
water services, wax tape and galvanic zinc anode cathodic protection, connections to existing
lines, and a slurry seal. He was responsible for daily inspection, SWPPP, and project
coordination with utility agencies.
Water Main Upsizing —Tidelands Park I City of Foster City, CA
Mr. Mostafavi provided construction inspection for the upsizing of a water line feeding into a
new development. The project involved the coordination between Foster City and San Mateo,
and construction took place along a wetland.