Loading...
HomeMy WebLinkAboutItem 8.1TOWN OF LOS ALTOS HILLS NOTICE OF FAST TRACK PUBLIC HEARING NOTICE IS HEREBY GIVEN that the City Clerk of the Town of Los Altos Hills, State of California, has set after the hour of 10:00 A.M. TUESDAY, NOVEMBER 7, 2006 in the Lobby Conference Room of Town Hall, 26379 Fremont Road, Los Altos Hills, California, as the time and place for a Public Hearing on the application of: LANDS OF YU, 14329 Miranda Way (69-06-ZP-SD-GD); A request for a Site Development Pertnit for a 5,605 square foot two-story new residence with a 2,725 square foot basement, a 851sq. ft. attached secondary dwelling unit (maximum height: 26'10"), and development area bonus of 500 sq. ft. per solar ordinance Section 10-1.502.b.6 CEQA review - Categorical Exemption 15303(a) (Staff -Nicole Horvitz). The file for the application is at the Office of the City Clerk at the Los Altos Hills Town Hall, 26379 Fremont Road, Los Altos Hills, California and may be reviewed at that location upon request. All interested persons may appear and be heard at said time and place. Written communications should be filed prior to the date of the Hearing. If you challenge the action of the Site Development Hearing, Planning Commission, or the City Council in court, you may be limited to raising only those issues you or someone else raised at the public heating described in this notice, or in written correspondence delivered to the Town at, or prior to, the public hearing. Further details may be obtained from the Planning Department at (650) 941-7222. Debbie Pedro Planning Director Town of Los Altos Hills NOTICE DATE: October 27, 2006 8.1 Town Of Los Altos Hills November 7, 2006 Fast Track Fact Sheet Project Description: New Residence with Basement and attached second unit File Number: 69-06-ZP-SD-GD Site Address: 14329 Miranda Way Owner(s): Joanna & Oliver Yu Staff Planner: Nicole Horvitz -Assistant Planner Site Data Net Lot Area: .99 acre Average Slope: 11.9% Lot Unit Factor: .95 Floor and Development Area (square footage): Area Type Maximum Existing Proposed Increase Remaining Development 14,073* 10,638.56 2,933.44 14,067 6 Floor 5,610 2,641.19 2,963.81 5,605 5 (Basement: 3,576) *Includes 500 sq. ft. development area bonus per Section 10-1.502.b.6 (Solar Ordinance) Height: Maximum Proposed On Vertical Plane 27 ft. 26'10" ft. Lowest to Highest 35 ft. 32'6" ft Setbacks: Minimum Proposed Front 40 ft. >40 ft. Sides 30 ft. >30 ft. Rear 30 ft. >30 ft. Exterior Materials: Stucco walls, concrete tile roof. Parking: Required spaces: 5, out of setbacks. Proposed: 5 (3 garage spaces) out of setbacks. Grading: Cut: 1,709-CY Fill: 479-CY Export: 1,238-CY Sewer/Septic: Sewer Environmental Design Committee: Protect existing oak trees during construction. Open Space Committee: None Pathway Committee: Collect pathway in -lieu fee, $47 per foot of the average width of the lot.