Loading...
HomeMy WebLinkAboutResolution 24-26RESOLUTION 24-26 A RESOLUTION OF THE CITY COUNCIL OF THE TOWN OF LOS ALTOS HILLS APPROVING THE PLANS AND SPECIFICATIONS FOR THE 2026 SANITARY SEWER REPAIR AND REPLACEMENT PROJECT AND AUTHORIZING STAFF TO ADVERTISE THE PROJECT FOR A FORMAL BID I WHEREAS, as part of the Annual Sanitary Sewer Replacement and Rehabilitation Program approved in the FY2025-26 Adopted Operating and Capital Budget, the Public Works Department annually identifies and prioritizes sanitary sewer segments with significant defects for repair or replacement. The program is funded through the Sewer Enterprise Fund; and WHEREAS, the primary objective of the program is to maintain reliable conveyance of wastewater by repairing and replacing deteriorated sewer infrastructure within the Town's system; and WHEREAS, the 2026 Sanitary Sewer Repair and Replacement Project will rehabilitate existing sewer mains by replacing and upsizing defective pipes with high-density polyethylene (HDPE) or polyvinyl chloride (PVC) pipes, and identified defects in the existing pipes include cracks, infiltration, joint offsets, root intrusion, and sags; and WHEREAS, these improvements reduce the risk of sanitary sewer overflows (SSOs), minimize infiltration and inflow (II) of groundwater and stormwater, lower long-term maintenance costs, address capacity constraints, and enhance the overall performance and reliability of the sanitary sewer system; and WHEREAS, the Base Bid items for the 2026 Sanitary Sewer Project include improvements to nine sewer pipe segments and adjusting three manholes flush with existing pavement at an Engineer's Estimate of $880,000; and WHEREAS, the Add Alternate Bid items consist of open trench and spot repairs of three sewer pipe segments estimated to cost $343,000; and WHEREAS, with remaining project funds from prior fiscal years, a FY26 allocation of $900,000, and a FY27 anticipated allocation of $1,150,000, sufficient budget is available to fund the 2026 Sewer Repair and Replacement Project, which is scheduled to begin construction in FY27. NOW, THEREFORE, BE IT RESOLVED by the City Council of the Town of Los Altos Hills that: 1. The Project Plans and Specifications as described in the Staff Report to the City Council for this agenda item are hereby approved; and 2. Staff are authorized to advertise the 2026 Sanitary Sewer Repair and Replacement Project for a formal bid. The above and foregoing Resolution was passed and adopted by the City Council of the Town of Los Altos Hills at a regular meeting held on the 16th day of April 2026 by the following vote: RESOLUTION 24-26 1 1P a g e AYES: MOK, SWAN, TANKHA, TYSON, BHATEJA NOES: NONE ABSTAIN: NONE ABSENT: NONE ATTEST: Arika Birdsong -Miller, City Clerk BY: RESOLUTION 24-26 Rajiv Bhateja, Mayor 21Page