Loading...
HomeMy WebLinkAboutItem 3.3Item 3.3 TOWN OF LOS ALTOS HILLS April 2, 2009 Staff Report to the Planning Commission RE: SITE DEVELOPMENT PERMIT FOR A TWO STORY NEW RESIDENCE WITH A BASEMENT, SECONDARY UNIT (CABANA), AND SWIMMING POOL; LANDS OF AGAM, 25611 VEVEDO LANE (LOT # 3); FILE #315-08-ZP- SD-GD. FROM: David Keyon, Associate Planner Q �C APPROVED BY: Debbie Pedro, AICP, Planning Directors, RECOMMENDATION: That the Planning Commission Approve the requested Site Development Permit subject to the recommended conditions of approval in Attachment 1. BACKGROUND The subject property is Lot # 3 of a 3 Lot Subdivision application approved on Much 13, 2008 by the City Council (application 148 -07 -IS -ND -TM). No structures currently exist on site. CODE REQUIREMENTS This application is not eligible for the Fast -Track process under section 10- 2.1305.1(a)(3), as the applicant requests a Grading Policy exception for the driveway and subterranean garage. The Zoning and Site Development sections of the Municipal Code me used to evaluate proposed projects including floor and development area limitations, grading, drainage, height, setbacks, visibility, and puking requirements. DISCUSSION Site Data: Proposed Gross Lot Area: 1.070 acres Net Lot Area: 1.066 acres Average Slope: 12.9% Lot Unit Factor: 1.000 Floor Area and Development Area (in square feet) Maximum Proposed Existing Increase Remaining Development Area 13,913 12,682 0 12,682 1,231 Floor Area 5,855 5,712 0 5,712 143 Basement n/a (3,577) 0 (3,577) n/a Staff Report to the Planning Commission Lands of Agam April 2, 2009 Page 2 Site and Architecture The site is accessed via a 35' wide driveway easement across 25631 Vinedo Lane (Lot 1) to Vinedo Lane, a private road. The site is bounded by orchards to the north, a vacant parcel to the west (Lot 2), and properties with existing residences to the east and south. The owner proposes to construct a two-story house with a basement and subterranean garage, swimming pool, and detached second unit (cabana). The house is proposed to be 5,461 square feet with a 3,577 square foot basement. The maximum height will be 27', with a maximum overall height (including chimneys and appurtenances) of 34'l 0". The new residence and second unit (cabana) will be located at least 100 feet from the southern (side) property line, 32 feet from west (side) property line, 32 feet from the rear (north) property line, and 96 feet to the east (side) property line. The proposed basement encompasses a garage and au -pair living area. The basement is entirely below grade except for a daylighted portion at the three -car garage. A detached second unit with a bedroom, full bathroom, and kitchen is proposed at the rear of the property (labeled "cabana" on the floor plan). This second unit complies with Section 10-1.702(1) of the Town's Municipal Code, as it will be subordinate to the primary dwelling on site, the property is over 1 acre in size, and is only 251 square feet in size. Due to the small size of the second unit and its location at the rear of the property, the structure will not be visually prominent. Driveway & Parkine Access is proposed from Vinedo Lane via a shared driveway with Lot 2. The driveway is proposed to. split into two; one 14' wide driveway up the west side of the house to a two - car garage on the 1't floor, and one 12' wide driveway along the front of the house leading to a subterranean three -car garage. Five (5) parking spaces will be provided, four for the main house and one for the second unit (pool cabana) as required by Town Code. All five will be located within either the 2 - car garage on the main level or the 3 -car basement garage. Outdoor Liehtine The applicant proposes ceiling -mounted downlights for the entry area, covered patio, and second story covered balcony, and wall -mounted fixtures at the entry doors (see the outdoor lighting plan on sheets El -E3). All light fixtures must be shielded or incorporate frosted or etched glass to ensure that the light source is not visible from off site (condition #5). Landscape lighting will be reviewed with the landscape screening application required prior to building permit final (Condition #3). Staff Report to the Planning Commission Lands of Again April 2, 2009 Page 3 Trees and Landscatim One 18" oak tree is proposed for removal at the entrance to the property to accommodate the driveway. Two (2) 36" box oak trees must be planted on site to replace the removed oak tree (Condition #3). Thirteen (13) other trees are proposed to be removed on site, including a cluster of cedars and pines at the location of the proposed residence. A landscape screening and erosion control plan will be required after completion of framing for the new residence to ensure that the visual effects of the development will be mitigated. This plan will be reviewed at a noticed public hearing before the Site Development Authority, and all required vegetation for screening purposes must be planted prior to final inspection. A landscape maintenance deposit will be required to ensure the long term viability of screening vegetation (condition #4). Grading Policy Exception Total grading quantities include 4,825 cubic yards of cut (basement, cabana, driveway and swimming pool) to be exported off site. The Engineering Department has reviewed the proposed grading and concluded that it is not in conformance with the Town's grading policy. Specifically, the applicant is requesting a grading policy exception for up to 11 feet of cut (where 8' is allowed) for the driveway leading to the basement garage. If the proposed grading were to occur on a hillside or ridgeline property, the excavation for the driveway and basement garage would result in massive retaining walls that are highly visible and substantial visual alteration of the natural terrain in violation of Section 10-2.702.c of the Site Development Code. However, in this case, the lot is relatively flat and the proposed grading will help lower the profile of the new home. Furthermore, the driveway retaining walls will be below natural grade and will not be highly visible from surrounding properties and streets. In the past five (5) years, the Planning Commission has granted Grading Policy Exceptions for basement driveways exceeding 8' of cut for the following projects: • Lands of Khang, 26750 Robleda Court, SDP #242-08-ZP-SD-GD, March 5, 2009 • Lands of Ascension Development, 26491 Ascension Drive, SDP #252-07-ZP-SD- GD, June 5, 2008 • Lands of Corrigan, 13920 Fremont Pines Lane, SDP 47-06-ZP-SD-GD, April 6, 2006 The Grading Policy allows the Planning Commission the discretion to approve grade differentials beyond standard requirements when the individual site dictates the need to deviate from the criteria. If the Planning Commission decides to approve the project as proposed, findings for approval of the Grading Policy Exception should be cited. (Attachment 2) Staff Report to the Planning Commission Lands ofAgam April 2, 2009 Page 4 Drainage The proposed drainage system consists of an on-site retention system to maintain pre - development runoff levels. Engineering staff reviewed the proposed system and approved the conceptual design pursuant to Section 10-2.503 of the Municipal Code. The final drainage plan must be approved by the City Engineer prior to acceptance of plans for building permit review (condition #18). Green Building Ordinance The proposed new house is required to comply with the Town's Green Building Ordinance. This ordinance requires all new residences to achieve a minimum of fifty (50) points on Built It Green's Green Point Rated checklist or forty-five (45) points on LEED for Home's checklist. The applicant submitted a GreenPoint Rated checklist indicating that the project is designed to achieve a total of 82 points, in excess of the 50 required by Code. Fire Department Review The Santa Clara County Fire Department reviewed the plans and requires an on-site fire engine turnaround area (Condition #27). Certification from a licensed engineer must be submitted with the building permit plans confirming that the proposed grasscrete in the driveway and turnaround area will provide all-weather performance equal to asphalt or concrete and can support the required loads of fire engines (Condition 27). Committee Review The Pathways Committee reviewed the project and recommends a pathways in -lieu fee (Condition 26). The Environmental Design and Protection Committee commented on the GreenPoint checklist, the tree removal, the secondary dwelling unit and siting of the house. CEOA STATUS The proposed new residence is categorically exempt from the provisions of the California Environmental Quality Act per Section 15303(a) and (e). Staff Report to the Planning Commission Lands ofAgam April 2, 2009 Page 5 FvOp 104): OO S 1. Recommended conditions of approval 2. Findings for Approval of the Grading Policy Exception 3. Recommendations from Santa Clara County Fire Department, dated 12/15/08. 4. Recommendations from Cotton, Shires, and Associates, dated 1/9/09. 5. Recommendations from Environmental Design Committee, dated 12/15/08. 6. Worksheet #2 (MFA and MDA calculations) 7. Letter from Giuliani & Kull, Inc., Project Engineers and Surveyors, dated 3/20/09. 8. Development plans: site, topographic, grading & drainage, floor, elevation, section, roof, and lighting plans Staff Report to the Planning Commission Lands ofAgam April 2, 2009 Page 6 ATTACHMENT RECOMMENDED CONDITIONS FOR A SITE DEVELOPMENT PERMIT FOR A NEW RESIDENCE WITH BASEMENT, SECOND UNIT (CABANA), AND POOL LANDS OF AGAM, 25611 VINEDO LANE File #315-08-ZP-SD-GD PLANNING DEPARTMENT 1. No other changes or modifications to the approved plan are allowed except as otherwise first reviewed and approved by the Planning Director or the Planning Commission, depending on the scope of the changes. 2. All existing Blue Gum (E. globulus), Pink Ironbark (E. sideroxylon rosea), River Red Gum (E. camaldulensis), Swamp Gum (E. rudis), Honey Gum (E. melliodora), or Manna Gum (E. viminalis) eucalyptus trees on the property located within 150' of any structures or roadways shall be removed prior to final inspection of the new residence. Removal of eucalyptus trees shall take place between the beginning of August and the end of January to avoid disturbance of nesting birds protected under the Federal Migratory Bird Treaty Act (MBTA) and California Department of Fish and Game Code Section 3500 et seq unless a nesting bird survey is first conducted and there is a determination that there are no active nests within the tree. After completion of rough framing and prior to the time of the pre -rough framing inspection by the Planning and Engineering Departments, the applicant shall submit a landscape screening, landscape lighting, and erosion control plan for review. The landscape screening and erosion control plan will be reviewed as a Site Development application with a public hearing. Particular attention shall be given to plantings which will be adequate to break up the bulk of the residence and retaining walls while preserving the existing screening. The landscape plan shall include the replacement of the one Heritage Oak on a 2 for 1 basis at a minimum of 36" box size. All landscaping required for screening purposes, replacement, and for erosion control (as determined by the City Engineer) must be installed prior to final inspection. All lighting must comply with Town Policy. 4. A landscape maintenance deposit in the amount of $5,000 shall be posted prior to final inspection. An inspection of the landscape to ensure adequate establishment and maintenance shall be made two yens after the installation. The deposit will be released at that time if the plantings remain viable. All new exterior lighting fixtures shall have frosted/etched glass enclosures or be shielded light fixtures. Seeded or bent glass is not acceptable. No lighting may be placed within setbacks except as shown on the approved plan. The applicant Staff Report to the Planning Commission Lands ofAgam April 2, 2009 Page 7 shall provide the Town with a lighting detail or manufacturer's specification on the fixtures to be used, prior to acceptance of plans for building plan check. All lighting must comply with the Town's Lighting Policy prior to final inspection. 6. Prior to requesting the foundation inspection, a registered civil engineer or licensed land surveyor shall certify in writing and state that "the location of the residence and roof eaves comply with the location shown on the approved plans relative to the property lines." The elevation of the residence shall be similarly certified in writing to state that "the elevation of the residence matches the elevation and location shown on the approved plan." The applicant shall submit the stamped and signed letter(s) to the Planning Department prior to requesting a foundation inspection. Prior to requesting the final framing inspection, a registered civil engineer or licensed land surveyor shall certify in writing and state that "the height of the new residence complies with the 27' maximum structure height, measured as the vertical distance at any point from the bottom of the crawl space or basement ceiling if excavated below natural grade, to the highest part of the structure directly above (including roof materials)" The overall structure height shall be similarly certified in writing and state that "all points of the building (including chimneys and appurtenances) lie within a thirty-five (35 ) foot horizontal band based, measured from the lowest visible natural or finished grade topographical elevation of the structure along the building line and the highest topographical elevation of the roof of the structure." The applicant shall submit the stamped and signed letter(s) to the Planning Department prior to requesting a final framing inspection. Standard swimming pool conditions: a. Lights shall be designed so that the source is not visible from off-site. b. Drainage outfall structures shall be constructed and located to the satisfaction of the City Engineer. c. Pool equipment shall be enclosed on all four sides with a roof for noise mitigation and screening. 9. For swimming pools, at least one of the following safety features shall be installed to the satisfaction of the Town Building Official: a. The pool shall be isolated from access to the residence by an enclosure (fencing). b. The pool shall be equipped with an approved safety pool cover. c. The residence shall be equipped with exit alarms on those doors providing direct access to the pool. Staff Report to the Planning Comrnission Lands of Again April 2, 2009 Page 8 d. All doors providing direct access from the home and second unit (cabana) to the swimming pool shall be equipped with a self-closing, self -latching device with a release mechanism placed no lower than 54 inches above the floor. 10. Skylights, if utilized, shall be designed and constructed to reduce emitted light. No lighting may be placed within skylight wells. 11. Air conditioning units shall be located a minimum of 40' from the front property line and 30' from the side and rear property lines. 12. Fire retardant roofing (class A) is required for all new construction. 13. No new fencing or gates are approved. Any new fencing or gates shall require review and approval by the Planning Department prior to installation. 14. The applicant shall pay any applicable School District (Los Altos or Palo Alto) fees prior to acceptance of plans for building plan check from Los Altos Hills. The applicant must take a copy of required fee payment forms that have been completed by the Town to both the elementary and high school district offices, pay the appropriate fees and provide the Town with a copy of their receipts. 15. At time of submittal of plans for building plan check, the applicant shall submit one of the following checklists to demonstrate compliance with the Town's Green Building Ordinance: a. A GreenPoint Rated checklist with the building permit application to indicate that the project will achieve a minimum of fifty (50) points. The checklist shall be completed by a qualified green building professional and shall be attached to the front of the construction plans. The construction plans shall include general notes or individual detail drawings, where feasible, showing the green building measure to be used to attain the required points. b. A LEED for Homes checklist with the building permit application to indicate that the project will achieve a minimum of forty-five (45) points or LEED certification. The checklist shall be completed by a qualified green building professional and shall be attached to the front of the construction plans. The construction plans shall include general notes or individual detail drawings, where feasible, showing the green building measure to be used to attain the required points. 16. Prior to final inspection and occupancy, a qualified green building professional shall provide documentation verifying that the building was constructed in compliance with GreenPoint Rated or LEED® certification. Staff Report to the Planning Commission Lands of Agam April 2, 2009 Page 9 ENGINEERING DEPARTMENT 17. As recommended by Cotton, Shires, & Associates, Inc., in their report dated January 9, 2009, the applicant shall comply with the following: a. Updated CBC Design Criteria: The applicant's geotechnical consultant should prepare updated 2007 CBC seismic parameters for utilization in preparation of final construction plans by the Project Structural Engineer. b. Geotechnical Plan Review: The applicant's geotechnical consultant shall review and approve all geotechnical aspects of the project building and grading plans (i.e., site preparation and grading, site drainage improvements and design parameters for foundations) to ensure that their recommendations have been properly incorporated. The consultant should specifically evaluate the proposed locations and design of subsurface drainage retention/percolation systems with respect to the geotechnical compatibility with other site improvements (including basement subdrain systems). Any appropriate design revisions from a geotechnical perspective should be recommended. Geotechnical Field Inspection: The geotechnical consultant shall inspect, test (as needed), and approve all geotechnical aspects of the project construction. The inspections shall include, but not necessarily be limited to: site preparation and grading, site surface and subsurface drainage improvements, and excavations for foundations and retaining walls prior to the placement of steel and concrete. The results of these inspections and the as -built conditions of the project shall be described by the geotechnical consultant in a letter and submitted to the Town Engineer for review prior to final inspection (granting of occupancy). The results of the CBC update and Geotechnical Plan review shall be summarized by the geotechnical consultant in a letter and submitted to the Town Engineer for review along with documents submitted for building permit plan check. 18. Peak discharge at 25611 Vinedo Lane, as a result of Site Development Permit 315-08, shall not exceed the existing pre -development peak discharge value of the property. Detention storage must be incorporated into the project to reduce the predicted peak discharge to the pre -development value. Provide the data and peak discharge hydrologic model(s) utilized, as well as, the calculations of the peak discharge value prior and post development. Determine the design peak runoff rate for a 10 -year return period storm and provide detention storage design plans to reduce the predicted peak discharge to the pre -development value. All documentation, calculations, and detention storage design (2 plan copies) shall be submitted for review and approval to the satisfaction of the City Engineer prior to acceptance of plans for building plan check. Prior to final inspection, a letter Stall Report to the Planning Commission Lands ofAgam April 2, 2009 Page 10 shall be submitted from the project engineer stating that the site grading and storm drainage detention system were constructed as shown on the approved plans and in accordance with their recommendations. 19. Any, and all, changes to the approved grading and drainage plan shall be submitted as revisions from the project engineer and shall first be approved by the Town Engineering Department. No grading shall take place during the grading moratorium (October 15 to April 15) except with prior approval from the City Engineer. No grading shall take place within ten feet of any property fine except to allow for the construction of the driveway access. 20. All public utility services serving this property shall be placed underground. The applicant should contact PG&E immediately after issuance of building permit to start the application process for undergrounding utilities which can take up to 66=8 months." 21. Two copies of an erosion and sediment control plan shall be submitted for review and approval by the Engineering Department prior to acceptance of plans for building plan check. The contractor and the property owner shall comply with all appropriate requirements of the Town's NPDES permit relative to grading and erosion/sediment control. The fust 100 feet of the driveway shall be rocked during construction and all cut and fill slopes shall be protected from erosion. All areas on the site that have the native soil disturbed shall be protected for erosion control during the rainy season and shall be replanted prior to final inspection. 22. Two copies of a grading and construction operation plan shall be submitted by the property owner for review and approval by the City Engineer and Planning Director prior to acceptance of plans for building plan check The gradingiconstruction operation plan shall address truck traffic issues regarding dust, noise, and vehicular and pedestrian traffic safety on Vinedo Lane and Elena Road, storage of construction materials, placement of sanitary facilities, parking for construction vehicles, clean-up area, and parking for construction personnel. A debris box (trash dumpster) shall be placed on site for collection of construction debris. Arrangements must be made with the GreenWaste Recovery, Inc. for the debris box, since they have a franchise with the Town and no other hauler is allowed within the Town limits. 23. The property owner shall inform the Town of any damage and shall repair any damage caused by the construction of the project to pathways, private driveways, and public and private roadways, prior to final inspection and release of occupancy permits and shall provide the Town with photographs of the existing conditions of the roadways and pathways prior to acceptance of plans for building plan check. Staff Report to the Planning Commission Lands of Again April 2, 2009 Page 11 24. The driveway shall be required to be fully constructed and to be roughened where the pathway intersects, to the satisfaction of the City Engineer, prior to final inspection. 25. The property owner shall be required to connect to the public sanitary sewer prior to final inspection. A sewer hook up permit shall be required by the Town's Public Works Department prior to submittal of plans for building plan check An encroachment permit shall be required for all work proposed within the public right of way prior to start work. 26. The property owner shall pay a pathway fee of $50.00 per linear foot of the average width of the property prior to acceptance of plans for building plan check FIRE DEPARTMENT 27. Provide an approved fire department engine driveway turnaround with a minimum radius of 36 feet outside and 23 feet inside. Installations shall conform with Fire Department Standard Details and Specifications D-1. The proposed Grasscrete must be installed and maintained to the satisfaction of the Fire Department and per manufacturers' instructions. The Grasscrete surface must provide all-weather performance equal to asphalt or concrete and must support the imposed loads of fire apparatus. Written certification that this installation will provide sufficient load-bearing capabilities and all-weather durability must be prepared by a licensed engineer and submitted with plans for building permit plan check. 28. Provide an access driveway with a paved all weather surface, a minimum unobstructed width of 14 feet, a vertical clearance of 13 feet 6 inches, and a minimum circulating turning radius of 36 feet outside and 23 feet inside, and a maximum slope of 15%. 29. An automatic residential fire sprinkler system approved by the Santa Clara County Fire Department shall be included in all portions of the building. Tbree sets of plans prepared by a sprinkler contractor shall be submitted to the Santa Clara County Fire Department (14700 Winchester Blvd., Los Gatos, CA 95032) for review and approval. The sprinklers shall be inspected and approved by the Fire Department, prior to final inspection and occupancy of the new residence. 30. The project is located within the designated Wildland-Urban Interface Fire Area. The building construction shall comply with the provisions of California Building Code (CBC) Chapter 7A. Note that vegetation clearance shall be in compliance with CBC Section 701A.3.2.4 prior to final approval. Check with the Planning Department for related landscape plan requirements. Staff Report to the Planning Commission Lands ofAgam April 2, 2009 Page 12 31. Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Numbers shall contrast with their background. CONDITION NUMBERS 14, 18, 21, 22, 23, 25 AND 26 SHALL BE COMPLETED AND SIGNED OFF BY TOWN STAFF PRIOR TO ACCEPTANCE OF CONSTRUCTION PLANS FOR PLAN CHECK BY THE BUILDING DEPARTMENT. Project approval may be appealed if done so in writing within 22 days of the date of this notice. The building permit cannot be issued until the appeal period has lapsed. The applicant may submit construction plans to the Building Department after April 24, 2009 provided the applicant has completed all conditions of approval required prior to acceptance of plans for building plan check. Upon completion of the construction, a final inspection shall be required to be set with the Planning and Engineering Departments two weeks prior to final building inspection approval. NOTE: The Site Development permit is valid for one yew from the approval date (until April 2, 2010). All required building permits must be obtained within that year and work on items not requiring a building permit shall be commenced within one you and completed within two years. Staff Report to the Planning Commission Lands of Aga. Apri12, 2009 Page 13 ATTACHMENT RECOMMENDED FINDINGS FOR GRADING POLICY EXCEPTION LANDS OF AGAM, 25611 VINEDO LANE File # 315-08-ZP-SD-GD 1. The proposed grading is consistent with Section 10-2.702.c of the Los Altos Hills Municipal Code, the proposed grading will help lower the profile of a portion of the structure and render it less visible from off-site. 2. The proposed area of grading will not result in the substantial visual alteration of the natural terrain. The property's existing contours and basic landform are retained. 3. The proposed grading will not result in the placement of retaining walls that are visible from off-site. 4. The Grading Policy emphasizes cut to lower the profile of structures over fill or foundation walls, which tend to raise the profile of the structure. The proposed underground garage requires no fill. �P" Ooa FIRn DEPARTMENT SANTA CLARA COUNTY 14700 Winchester Blvd., Los Gatos, CA 95032-1818 (408) 378-4010 • (408) 378-9342 (fax) • vnx sccfd.org PLAN REVIEW No. PLAN REVIEW COMMENTS PERMRNo CODMEC. i SHEET i NO. I REQUIREMENT Attachment 3 Nemutio S /uvdRed AB, 08 3516 CM PIANS SPECS NEW PMOL 15 OCCUPANCY CONST, TYPE Plan review of a 9,290 square foot two-story single-family residence with two DATE PAGE LAB N ❑ ® ❑ ❑ attached garages, basement, covered patio and cabana. CFCPr Stotler Design Group 1 Required Fire Flow: The fire flow for this project is 1,500 gpm at 20 psi residual Appendix B MFA LDAD pressure. The adjusted fire flow is available from area water mains and fire BY LOT 3, 2 story 9290 sf hydrant(s) which are spaced at the required spacing. Residential Construction Harding, Doug I 2 Wildland-Urban Interface: This project is located within the designated SFR 25611 Vineda Ln Wildland-Urban Interface Fire Area. The building construction shall comply with the provisions of California Building Code (CBC) Chapter 7A. Note that vegetation clearance shall be in compliance with CBC Section 701A.3.2.4 prior to final approval. Check with the Planning Department for related landscape plan requirements. CFC Sec. 3 Fire Sprinklers Required: Approved automatic sprinklers are required in all new 903.2, as and existing modified buildings when gross floor area exceeds 3,600 square feet or adopted that are 3 or more stories in height. Exception:One-time additions to existing and nse� buildings made after 01 / 01 / 2008 that do not exceed 500 gross square feet. An automatic sprinkler shall be provided in all new structures located in the designated Wildland-Urban Interface area. Exception: Any non -habitable accessory structures to single family residences that have gross floor area of 500 square feet or less. A State of California licensed (C-16) Fire Protection Contractor shall submit plans, calculations, a completed permit application and appropriate fees to this department for review and approval prior to beginning their work. CFC Seo. 503 4 Fire Apparatus (Engine)Access Driveway Required: Provide an access driveway with a paved all weather surface, a minimum unobstructed width of 14 feet, vertical clearance of 13 feet 6 inches, minimum circulating turning radius of 36 feet outside and 23 feet inside, and a maximum slope of 157o. Installations shall CM PIANS SPECS NEW PMOL 15 OCCUPANCY CONST, TYPE APPIIU"A'" DATE PAGE LAB N ❑ ® ❑ ❑ R -3,U V -B Stotler Design Group 12/15/2008 1 OF 2 CFChLODR MFA LDAD SCRIPTN OEp BY LOT 3, 2 story 9290 sf Residential Construction Harding, Doug I NAME OF PROJECTLOCATION SFR 25611 Vineda Ln as the Santa Clara Countv Central Fire Protection District Serving Santo Clam County and ON, mnlmanjN. of Campbell, CUpertmo, Los Altos, Los Altos Hills, Los Gams, Monte Sereno, Morg n Hill, and Saratoga ��POLAnA o00 FIRr- DEPARTMENT SANTA CLARA COUNTY 14700 Winchester BW., Los Gatos, CA 95032-1818 (408) 378-4010 • (408) 378-9342 (fax) • uw scafd..rg PUN FEVIEW No. PLAN REVIEW COMMENTS KING Nu JOESEC. I SHEET I NO.I REQUIREMENT Sec. C Sec. a°ma�a° M 1 r....J nWm AIR. A[amiit� Agenry 08 3516 to Fire Department Standard Details and Specifications sheet D-1. ?ire Department (Engine) Driveway Tum -around Required: Provide an ipproved fire department engine driveway turnaround with a minimum radius of 16 feet outside and 23 feet inside. Installations shall conform with Fire Department itandard Details and Specifications D-1. NOTE: Plans show'Grasscrete' as the surface of the Fire Dept. turnaround. This )roduct must be installed and maintained to the satisfaction of this department and rer manufacturers instructions. The Grasscrete surface must be provide ill -weather performance equal to asphalt or concrete and must support he imposed loads of fire apparatrus. Written certification that this installation will rrovide sufficient load-bearing capabilities and all-weather durability must be )rovided to this office by a properly licensed engineer. ises Identification: Approved numbers or addresses shall be placed on all and existing buildings in such a position as to be plainly visible and legible the street or road fronting the property. Numbers shall contrast with their ns not approved. not issue Building Permit. CM PUNS SPECS NEW PMOL AS OCCUPANCY CONST. TYPE ApplbMHema GATE PAGE AH ® C]N El ElR-3,U V -B Stotler Design Group 12/15/2008 2 OF 2 IChLOOX APFA LOA. OESCflMTION 9Y 0T 3, 2 story 9290 sf Residential Construction Harding, Doug AMEOFPNOJECT LOCATON SFR 25611 Vinedo Ln Organized as the Santa Clara County Central Fire Protection District Senting Santo Clam County and the comm unities of Campbell, Cupertino, Los Alms, Los Altos Hilh, Lus Gotos, Monte Sereno, Morgan Hill, and Samtoga rAE.COTTON, SHIRES & ASSOCIATES, INC. CONSULTING ENGINEERS AND GEOLOGISTS TO: Debbie Pedro Planning Director TOWN OF LOS ALTOS HILLS 263'9 Fremont Road Los Altos Hills, CA 94022 SUBJECT: Geotechnical Peer Review RE: Agam, New Residence 315-08-ZP-SD-GD 25611 Vinedo Lane Attachment 4 January 9, 2009 L0388 At your request, we have completed a geotechnical peer review of the subject application for the proposed new residence using: • Geotechnical Investigation (report) prepared by JF Consulting, Inc., dated July 11, 2007; • Architectural Plans (13 sheets, various scales) prepared by Stotler Design Group, dated March 20,2008; and • Civil Plans (4 sheets, various scales) prepared by NNR Engineering, dated December 4, 2008. In addition, we have reviewed pertinent technical documents from our office files, including a previous subdivision plan including the subject property in 2007 (10227), and completed a recent site inspection. DISCUSSION Based on our review of the referenced plans, we understand that the applicant proposes to construct a new two-story, single-family residence with basement on one of Norttiem California Office 330 Village lane Los Gatos, CA95030-7218 (408) 354-5542 • Pax (408) 3541852 e-mail losgatos®cottomhires.cam www.cottonshires.com Centcal Califomia Office 6417 Dogme a Road San Andreas, CA 95249-9640 (2)9) n6A 2 • Fax (209) 936-1212 e-mail cottonedres®starband.net Debbie Pedro January 9, 2009 Page L0388 the three recently subdivided lots. At the time of our recent site inspection, the lot was covered with grass, and mature trees. Access to the lot is to be provided via a new asphalt driveway extending from Vinedo Lane. Proposed project grading includes approximately 4,825 cubic yards of cut to be exported from the site. This volume includes excavation for the basement and a swimming pool. The project includes a storm water retention system, bubbler boxes, and dissipater structures. SITE CONDITIONS The subject property is generally characterized by gentle (5 to 10 percent inxlination) southeast -facing hillside topography. Drainage at the site is charactenzed as uncontrolled sheet flow to the east and southeast. According to the Town Geologic Map, the subject property is underlain, at depth, by weathered greenstone bedrock of the Franciscan Complex. According to exploratory borings presented in the referenced investigation, greenstone bedrock materials are locally overlain by relatively shallow, potentially expansive sandy clay (colluvium) in the vicinity of the proposed building pad. According to the Town Geotechnical Hazards Map, the site lies partially within "A" and "D" geotechnical zones. The nearest traces of the potentially active Monta Vista and Berrocal faults are mapped approximately 600 feet northwest and 1,150 feet southwest, respectively, of the subject property. Additionally, the active San Andreas fault is located approximately 3.1 miles southwest of the site. CONCLUSIONS AND RECOMMENDED ACTION Site development is constrained by anticipated strong seismic ground shaking, mid potentiaiiy expansive earth materials. The Project Geotechnical Consultant has previously conducted an investigation of the entire subdivision and provided geotechnical design recommendations that generally appear appropriate for apparent constraints to the currently proposed development. We note that presented seismic design parameters were based on the 1997 UBC. Updated 2007 California Building Code (CBC) seismic design parameters should be prepared. The design of project drainage systems should be evaluated from a geotechnical perspective by JF Consulting. We do not have geotechnical objections to the proposed layout of site improvements. We recommend that documentation to address the following Items 1 and 2 be submitted to the Town along with other documents for building permit plan -check. COTTON, SHIRES & ASSOCIATES, INC. Debbie Pedro Page 3 January 9, 2009 L0388 1. Updated CBC Design criteria - The applicant's geotechnical consultant should prepare updated 2007 CBC seismic parameters for utilization in preparation of final construction plans by the Project Structural Engineer. 2. Geotechnical Plan Review - The applicant's geotechnical consultant shall review and approve all geotechnical aspects of the project building and grading plans (i.e., site preparation and grading, site drainage improvements and design parameters for foundations) to ensure that their recommendations have been properly incorporated. The consultant should specifically evaluate the proposed locations and design of subsurface drainage retentionipercoiation systems with respect to geotechnical compatibility with other site improvements (including basement subdrain systems). Any appropriate design revisions from a geotechnical perspective should be recommended. The results of the CBC update and geotechnical plan review should be summarized by the geotechnical consultant in a letter and submitted to the Town along with other documents for building permit plan -check. Geotechnical Field Inspection - The geotechnical consultant shall inspect, test (as needed), and approve all geotechnical aspects of the project construction. The inspections should include, but not necessarily be limited to: site preparation and grading, site surface and subsurface drainage improvements, and excavations for foundations and retaining walls prior to the placement of steel and concrete. The results of these inspections and the as -built conditions of the .project should be described by the geotechnicai consultant in a letter and submitted to the Town Engineer for review prior to final (granting of occupancy) project approval. LIMITATIONS This geotechnical peer review has been performed to provide technical advice to assist the Town with discretionary permit decisions. Our services have been limited to review of the documents previously identified, and a visual review of the property. Our opinions and conclusions are made in accordance with generally accepted principles COTTON, SHIRES & ASSOCIATES, INC. Debbie Pedro Page 4 January 9, 2009 L0388 and practices of the geotechnical profession. This warranty is in heu of all other warranties, either expressed or implied. TS:DTS:JS:kd Respectfully submitted, COTTON, SHIRES AND ASSOCIATES, INC. TOWN GEOTECHNICAL CONSULTANT Ted Sayre U Principal Engineering Geologist CEG 1795 , David T. Schrier Principal Geotechnical Engineer GE 2334 COTTON, SHIRES & ASSOCIATES, INC. Attachment 5 Environmental —esign and Protection Committee -- ri New Residence/Remodel Evaluation Reviewedby: , b�%cC:, Date RECEIVED Applicant DEC 15 2008 luRtoFtosurosypy� Address ,�- P�� OI,h.Q Lu 1 j,�w (jr-3 Site lµ1 kU rtylo UA4W4E*Am LZ l t — t fRE(t GOWN OF LOS ALTOS HILL Attachment 6 PLANNING DEPARTMENT 1-, 26379 Ftemont Road •Los Altos Hills, California 94022 • (650) 941-7222 •FAX (650) 94 �-3160 WORKSHEET #2 TOWN OF LOS ALTOS HILLS EXISTING AND PROPOSED DEVELOPMENT AREA AND FLOOR AREA PROPERTY OWNER'S NAME Isaac Agam PROPERTY ADDRESS 25611 Vinedo Lane, Los Altos Hills, Ca CALCULATED BY SCOTT STOTLER I DATE December 10, 2008 1. DEVELOPMENT AREA (SQUARE FOOTAGE) A. House and Garage (from Part 3. A.) B. Porch (Non -MFA) C. Driveway and Parking (Measured 100' along centerline) D. Patios/Walkways/egress/lightwells E. Cabana F. Pool and Decking G. Accessory Buildings (from Part B) H. Any other coverage (Terraces) TOTALS Existing (to be removed) 0 0 0 0 0 0 0 0 0 Proposed Total (Additions/Deletmns) 5411 5411 50 50 3485 3485 2952 2952 0 0 533 533 Icr oci 12682 Maximum Development Area Allowed - MDA (from Worksheet #1) 2. TOTAL IMPERVIOUS SURFACE Existing Proposed (SQUARE FOOTAGE) TOTALS 12682 13913 Total 0 11670 11670 3. FLOOR AREA (SQUARE FOOTAGE) Existing Proposed Total (Additions/Deletions) A. House and Garage a. 1st Floor 0 3000 3000 b. 2nd Floor 0 1974 1974 c. Attic and Basement (Non -MFA) 0 0 0 d. Garage 0 437 437 e. Porch (MFA) 0 50 50 B. Accessory Buildings a. 1st Floor 0 251 251 b. 2nd Floor 0 0 0 c. Attic and Basement 0 0 0 TOTALS 0 5712 5712 Maximum Floor Area Allowed - MFA (from Worksheet #1) 5855 TOWN USE ONLY CHECKED BY DATE Rev. 3/20/02 Page 1 of 1 Town of Los Altos Hills r- Attachment 7 Giuliani & Kull, Inc. San Jose - Oakdale - Auburn March 20, 2009 Project No. 07172 Nicole Horvitz David Keyon Planning Dept. Town of Los Altos Hills 26379 Fremont Road Los Altos Hills, CA 94022 Subiecf 25631 Elena Road (Lot 1) & 25611 Elena Road (Lot 3) Dear Nicole and David: This letter is to state that Giuliani and Kull, Inc. has reviewed the story poles constructed on both of the subject sites. We found that the poles have been constructed, both horizontally and vertically, in general conformance with the construction stakes that we provided, as well as the architectural plans prepared by Stotler Design Group, and the grading plans prepared by NNR Engineering. If you have any questions or comments regarding this matter, please do not hesitate to contact our office. Sincerely, GIULIANI & KULL, INC. ark A. Helton, PE, PLS 4880 Stevens Creek Blvd„ Suite 205 • San Jose, CA 95129 • (408) 615-4000 • Fax (408) 615-4004