HomeMy WebLinkAboutItem 3.1TOWN OF LOS ALTOS HILLS June 23, 2005
Staff Report to the Planning Commission
RE: SITE DEVELOPMENT PERMIT FOR SLOPE ALTERATION AND GRADING
POLICY EXCEPTION; LANDS OF WESSBECHER; 11021 MAGDALENA
ROAD; FILE #18-05-ZP-SD-GD.
FROM: Brian Froelich, Assistant Planner
APPROVED BY: Carl Cahill, Planning Director C
RECOMMENDATION That the Planning Commission
Approve the Grading Policy exception finding that the project may enhance slope
stability and improve area drainage.
ALTERNATIVE
The Planning Commission may choose to deny the Grading Policy exception if it is
determined the project applicant has not submitted sufficient evidence to justify the
request.
This is a joint project application by three property owners. The lead applicant is the
Wessbechers. The lead applicant is also currently in the construction stages for a new
residence at 11021 Magdalena Road. The new residence, secondary unit, and pool were
approved through a Fast Track hearing in September, 2002. The site borders the northern
boundary of the Quarry Hills Subdivision and is adjacent to the quarry wall. The quarry
wall has slopes that range from 40% to over 100% and has a vertical elevation of over
165 feet at its highest point, which is the proposed area of work. The applicant proposes
to remove approximately 675 cubic yards of earth material from the uppermost portion of
the quarry wall. The applicant submitted a slope stabilization plan and a geotechnical
report to the Town for review.
CODE REQUIREMENTS
This proposal requires Planning Commission review because the 675 cubic yard
excavation will result in a grading cut of 11 feet, which exceeds the Town's Grading
Policy maximum of four (4) feet.
i(
Planning Commission
[ands of Wmbecher
June 23, 2005
Page 2
DISCUSSION
Grading Data
Maximum
Proposed
Cut
4'
11'
Fill
3'
0
Total Cubic Yards
1,000
675
Visibility and Views
The proposed grading cut would
enhance the views of the Wessbecher
property toward the quarry and to the
northwestern hillsides and ridgelines in
the area. Photo #1 illustrates the
existing view from the ground level of
the Wessbecher residence currently
under construction. Conversely, the
Wessbecher home would become more
visible from the residents of the quarry
and possibly existing homes along
Stonebrook Drive and Northcrest Lane.
Slow Stability
Photo NI (approximate cut)
The applicant's geotechnical consultant, Jo Crosby & Associates, has submitted
geotechnical findings related to the proposed grading operation. In their review they have
included findings from previous geotechnical evaluations of the quarry wall associated
with the Quarry Hills Subdivision. These reports are dated from the late 1980's to the
early 1990's. Jo Crosby & Associates outline that concerns were raised in those reports
about the long term stability of the quarry wall and the weathered greenstone slopes. They
document the presence of talus (sloping rock masses) slopes due to spalling (flaking and
chipping) of the greenstone along the quarry face and that landslide features were mapped
in a report prepared by Harlan Tait Associates in 1991.
"In summary, it is our opinion that the proposed grading along this segment of the
property would not have an adverse effect on the long term stability of the slopes of the
general area. There is potential for slope instability in this area even with grading
improvements. According to the reports reviewed, if such slide features were to develop,
they would be relatively shallow and impact an area 20 to 30 -feet from the quarry face. If
such features do occur, they can be promptly mitigated by slope stabilization methods.
The grading in itself will cause some surficial disturbance of the slopes and the removal
of existing vegetation. A soil erosion plan should be implemented to include hydro
seeding and protection of the slopes with hay, or the use of other means of erosion
reduction." —Jo Crosby & Associates October 12, 2004
Planning Commission
Lands of Wessbwher
June 23, 2005
Page 3
In review of this project the conclusion of the Town's geotechnical consultant, Cotton,
Shires, & Associates, is as follows:
"We concur with Jo Crosby and associates that the proposed grading would not
negatively impact the stability of the slopes, provided that adequate drainage and erosion
control measures are implemented. We also agree with the previous Nielson Geotechnical
conclusion that the proposed residence does not appear to be at significant risk with
respect to potential quarry rim instability; however, potential failure of the existing quarry
rim (over time) could reduce the distance between the residence and brink of the quarry
rim. Proposed project grading will result in some reduction of earth material loading, in
this isolated area at the top of the quarry rim, and thereby could help to reduce the scale of
future quarry rim failures. We do not have geotechnical objections to the proposed
grading as long as appropriate measures are added to the current grading plan to properly
control surface drainage." —Cotton, Shires, & Associates March 1, 2005
Drainage
Currently, drainage in the area of proposed grading is characterized by sheet flow to the
north and northeast down an unpaved access road toward the lands of Neary-Vidovich.
The Jo Crosby & Associates report raises concerns that rain water concentrated on this
unpaved road may filter into pre-existing ground cracks in the rock and further weaken
the quarry wall increasing the potential for a slide. With the proposed plan the drainage
from this area would be redirected back onto the Wessbecher property and into onsite
drainage installations. If the project is approved, staff has included a condition that a
revised drainage plan be reviewed prior to any grading.
Erosion Control
The area of proposed grading is currently vegetated with sparse, low growing vegetation.
If the project is approved, the Town's engineer has included a condition that an erosion
and sediment control plan be submitted and reviewed by engineering staff and the
operations must comply with NPDES standards.
Conclusion
Based on the submitted geotechnical analysis and the Town Geologist report, the project
may enhance slope stability. According to the Town Geologist, the proposed residence is
not at significant risk with respect to potential quarry rim instability. The proposed
grading operation may improve the drainage in the area and reduce the severity of
potential slides. The immediate benefit, however, for the property owner would be
enhanced views toward the Quarry Hills Subdivision and up to the hillsides and
ridgelines to the northwest.
Planning Commission
Lands of Wessbeche,
June 23, 2005
Page 4
ATTACHMENTS
1. Recommended conditions of approval
2. Town of Los Altos Hills Grading Policy
3. Jo Crosby & Associates letter October 12, 2004
4. Cotton, Shires & Associates letter March 1, 2005.
5. Guiliani & Kull grading plans April 13, 2005 (Commission only)
cc: Uwe and Beth Wessbecher
11021 Magdalena Road
Los Altos Hills, CA 94024
Planning Commission
lands of Wcnbmher
June 23, 2005
Page 5
ATTACHMENT 1
RECOMMENDED CONDITIONS FOR SITE DEVELOPMENT PERMIT AND
GRADING POLICY EXCEPTION
LANDS OF WESSBECHER, 11021 MAGDALENA ROAD
File #18-05-ZP-SD-GD
A. PLANNING DEPARTMENT:
I. Prior to final inspection of the residence and the grading project,
additional landscaping for this area shall be installed by the applicants to
restore areas disturbed by grading.
2. Prior to beginning any grading operation or demolition, all significant trees
are to be fenced at the drip line. The fencing shall be of a material and
structure (chain-link fencing) to clearly delineate the drip line. Town staff
must inspect the fencing and the trees to be fenced prior to
commencement of grading. The property owner shall call for said
inspection at least three days in advance of the inspection. The fence
must remain throughout the course of construction and grading. No storage
of equipment, vehicles, or debris shall be allowed within the drip lines of
the fenced trees.
3. An updated project grading and drainage plan shall be prepared that
depicts the properly controlled conveyance of surface drainage (formerly
conveyed along an unpaved roadway alignment along the quarry rim) in a
south to north direction through the area of proposed grading. No new
surface flow shall be directed over the quarry rim. Drainage improvements
in the Quarry Hills Subdivision common area shall be designed for low
maintenance requirements. A revised plan shall be submitted to the Town,
for review by the Town Engineer, prior to issuance of grading permits.
4. The geotechnical consultant shall review and approve all geotechnical
aspects of the project grading plans (i.e., site preparation and grading, and
site drainage improvements) to ensure that their recommendations have
been properly incorporated. The consultant shall specifically address the
proposed drainage design and locations of drainage discharge locations in
terms of minimizing adverse impacts to the slope stability. The results of
the Geotechnical Plan Review shall be summarized by the geotechnical
consultant in a letter and submitted to the Town Engineer prior to
issuance of grading permits.
5. The geotechnical consultant shall inspect, test (as needed), and approve all
geotechnical aspects of the project construction. The inspections shall
Planning Commission
Lands of Wesshecher
June 23, 2005
Page 6
include, but not necessarily be limited to: site preparation and grading, and
site surface drainage improvements. The presence of anticipated earth
material properties shall be confirmed. The results of these inspections
shall be described by the geotechnical consultant in a letter and submitted
to the Town Engineer for review prior to final inspection.
I el�:iRf fIS 77 cl 7 h [H e7:17\ ;71 Yu t alp Y YI
6. Final grading shall be inspected by the Engineering Department and any
deficiencies corrected to the satisfaction of the Engineering Department
prior to final inspection. A final letter shall be submitted from the project
engineer stating that the grading was constructed in conformance with the
approved plan prior to final inspection.
7. Any, and all, changes to the approved grading plan shall first be approved
by the Town Engineering Department. No grading shall take place during
the grading moratorium (November I to April 1) except with prior
approval from the City Engineer.
8. Two copies of an erosion and sediment control plan shall be submitted for
review and approval by the Engineering Department prior to issuance of
grading permit. The contractor and the property owner shall comply with
all appropriate requirements of the Town's NPDES permit relative to
grading and erosion/sediment control. All areas on the site that have the
native soil disturbed shall be protected for erosion control during the rainy
season and shall be replanted prior to final inspection.
9. The property owner shall inform the Town of any damage and shall repair
any damage caused by the construction of the project to pathways, private
driveways, and public and private roadways, prior to final inspection and
shall provide the Town with photographs of the existing conditions of the
roadways and pathways prior to issuance of grading permit.
10. Two copies of a grading and construction operation plan shall be
submitted by the property owner for review and approval by the City
Engineer and Planning Director prior to issuance of grading permit. The
grading/construction operation plan shall address truck traffic issues
regarding dust, noise, and vehicular and pedestrian traffic safety on
Magdalena Road and surrounding roadways; placement of sanitary
facilities; parking for construction vehicles; and parking for construction
personnel.
11. The property owner shall pay a roadway impact fee to the Town prior to
issuance of grading permit. Three cost estimates from the contractors will
be submitted to the Town for review. The cost estimates must include all
Planning Commission
[ands of Wessbecher
June 23, 2005
Page 7
cost associate with the grading, hauling the soil, and dumping the soil to
an appropriate site.
Upon completion of the grading, a final inspection shall be required to be set with the
Planning and Engineering Departments.
CONDITION NUMBERS 2, 3, 4, 8, 9, 10, AND 11 SHALL BE COMPLETED AND
SIGNED OFF BY THE PLANNING DIRECTOR AND THE CITY ENGINEER
PRIOR TO ISSUANCE OF THE GRADING PERMIT.
NOTE: The Site Development permit is valid for one year from the approval date (until
June 23, 2006). All required grading permits must be obtained within that year.
LOSAfLTOS HILLS ATTACHMENT z
GRADING POLICY
`1
CALIFORNIA
Code Sections
Section 10-2.7020 of the Site Development Ordinance states that: "The amount of
grading, excavation, or fill shall be the minimum necessary to accommodate proposed
structures, unless grading is proposed to lower the profile of buildings." Section 10-
2.703(a) requires: "Type 11 foundations — step -on -contour, daylight, pole foundations, or
a combination thereof — shall be used on building sites with natural slopes in excess of
fourteen percent (14%)."
Intent:
The purpose of this policy is to outline desired criteria for grading which assure that
construction retains the existing contours and basic landform of the site to the greatest
extent feasible. It is also intended that the policy provide guidance for "stepping"
structures down sloped hillsides, and emphasizes cut to lower the profile of structures
over fill or foundation walls, which tend to raise the profile of the structure. While
balanced cut and fill is desirable to minimize import or export of soil, to or from a site, it
is recognized that the Town's policies and the guidelines below may encourage export as
cut is generally preferred over fill.
These policies are intended to be used by staff in evaluation and making
recommendations to the Planning Commission and/or City Council regarding site
development applications, and as guidance for applicants. Individual sites may dictate a
need to deviate from the criteria, to the extent permitted by the Planning Commission
and/or City Council.
26379 Fremont Road
Los Altos Hills
California 94022
650/941-7222
Fax 650/941-3160
Policy Re: Grading
page 2
Policies:
1. Cuts and fills in excess of the following levels generally will be considered
excessive and contrary to Town ordinances and policies to grade only to the
minimum extent necessary to accommodate structures and to site structures
consistent with slope contours, i.e., "step down" the hill*:
Cut Fill
House
8'**
3'
Accessory Bldg.
4'
3'
Tennis Court
6'
3'
Pool
4'***
3'
Driveways
4'
3'
Other (decks, yards) 4' 3'
* Combined depths of cut plus fill for development other than the main
residence should be limited to 6 feet, except that for tennis courts cut
plus fill may be permitted up to a maximum of 8 feet.
** Excludes basements meeting Code definition.
*** Excludes excavation for pool.
2. The height of the lowest finished floor(s) of a structure should generally not
be set in excess of three (3) feet above the existing grade, to assure that
structures step with the slope.
3. Driveway cut may be increased up to a maximum of eight feet (8') for the
portion of the driveway or backup area which is adjacent to a garage that
has been lowered with a similar amount of cut.
4. Cut and/or fill for drainage shall be limited consistent with the guidelines set
forth above for each type of structure, but shall be the minimum grading
needed for drainage purposes, as determined by the City Engineer.
Approved by City Council: April 2, 1997
FPOM : Jo Crosby n AssoipIatC5 FHOIJE 140. Feb. 04 2005AJTiq.CHMEWT
RECEIVED
II �. r „
r EOM iw: s (IN;ut nN FEB 1 1 2005
«,,,,�� w ^ter„�• "O°'r""iq'�F�r09S1ALTOSHflLS
SINCE 1965
Project 4387A-6
October 12, 2004
Mr. Wessbecher
11021 Magdalena Road
Los Altos Hills, California 94022
Subject: Review of Proposed Grading Along the Northwest Property Line as a Part of
the Residential Development, 11021 Magdalena Road, Los Altos Hills, Cali-
fornia
Dear Mr. Wessbecher
At your request, we have reviewed the proposed grading along the northwest area of your
property captioned above, and provided comment on the planted work. The purpose of
our involvement with this phase of the project has been to form a generalized opinion as to
the feasibility of the excavations proposed along thissegmentof the project site and the
impact of this grading on the slope stability at the residential development. Our work has
been completed in accordance with the conditions of our proposal dated September 13,
2004
We have reviewed the following as a part of this work:
1. Grading plan entitled "Slope Stability Plan," prepared by the firm of Giuliani &
Kull, Inc., and dated 9/30104.
2. Geotechnical Evaluation, Neary Property, Los Altos Hills, California: Report pre-
pared by the firm of Earth Systems Consultants, with a date of June 30, 1989.
3. Geologic and Seismic Study, Quarry Hills Subdivision, Santa Clara County, Califor-
nia: Report prepared by Harlan Tait Associates, and dated May 10, 1991...
4. Geotechnical Investigation, Quarry Hills Subdivision, Santa Clara County, Califor-
nia: Report prepared by Alan Kropp & Associates, Inc., and dated June 7, 1991.
5. Various letters prepared by Alan Kropp Associates from September 13. 1994, to
March 5, 1998, in response to review comments.
FINDINGS
We understand that it is proposed to cut approximately 650 cubic yards of material along
the ridge that parallels the northwest property line. This area is located on the cast rim of
a previously operated, open,pit quarry that was reclaimed to form the Quarry Hills
FFOI'I : ]o Crosby 9 Associates PHONE NO. . Feb. 04 2005 10:53AM P2 ' '
Project 4397A-6
October 12, 2004
page 2
Subdivision in Los Altos Hills, California. As noted above, various geological and geo-
technical hazard studies have been prepared for that subdivision. The main geological
concern outlined in these reports pertains to the long term stahility of the near -vertical,
weathered -bedrock slopes of the ahandoned, open -pit quarry.
The Harlan Tait Associates study identified in detail the geologic structure of the quarry
site, and provided detailed geologic maps and cross-sections of various quarry faces.
Based on the Harlan 'gait information, the exposed face of the east quarry rim contains
bedrock units identified as Franciscan Complex greenstone (KJgs). This same formation
was identified as underlying the Wessbecher property. Landslide features have been
mapped along this quarry face in the form of rockfall-topple and translational slides. In
addition, talus slopes have formed due to surficial rock spalling along the quarry face. It
should be noted that the slide features identified on the Harlan Tait maps are relative
shallow in this general area. Also of note is the presence of ground cracks mapped along
the cast quarry rim, parallel to the quarry face.
Alan Kropp & Associates conuncnted on the possibility of grading the slopes back along
The east quarry rim adjacent to the Wessbecher and other neighboring properties in their
report dated June 7, 1991. Their firm's comments are as follows
"We understand that there is a possibility of grading material off the upper portions of the
east quarry rim, adjacent to the neighboring houses. The purpose of this would be to
provide more level backyards and views for these properties. This would also reduce the
height of the quarry walls and consequently improve the stability of the quarry walls
somewhat. If proper drainage is maintained in this area, as described above, there should
not be any adverse effects from this potential grading option, and a portion of the unstable
quarry wall would be eliminated."
CONCLUSIONS
Our firm is in general agreement with Alan Kropp & Associates comment stated above.
In theory, the proposed grading would reduce the height of the quarry walls and improve
the stability of these slopes. According to the grading plan, surface drainage presently
flows along the existing fire road from south to north and onto the Lands of Neary-Vido-
vich. The concern of this drainage location is that water from rain storms is concentrated
along the road alignment above and immediately adjoining the quarry face. Such a condi-
tion could allow water to filter into fractures within the rock or into pre-existing ground
cracks, identified by others, and lead to slope instability. On the other hand, the currently
proposed grading will allow some of the water to flow onto properties where it had not
flown before and to spread the flow over a larger area which would improve the concern
for concentrated drainage infiltration immediately above the cut slope to some degree.
In summary, it is our opinion that the proposed grading along this segment of the property
would not have an adverse effect on the long-term stability of the slopes of the general
area. There is the potential for slope instability in this area even with grading improve-
ments. According to the reports reviewed, if such slide features were to develop, they
would be relatively shallow and impact an area 20 to 30 -feet from the quarry face. If such
JO CROSBY S ASSOCIATES
uEu rtc HN i CAL COMs,u. TANrr
SINCE 1955
FFON -Jo Crosby @ nssoclate=_. PHONE NO. : Feb. 04 2005 11: 1IPM Pt
Project 4387A-6
October 12, 2004
page 3
features do occur, they can be promptly mitigated by slope stabilization methods. The
grading in itself will cause some surficial disturbance of the slopes and removal of existing
vegetation. A soilerosion plan should be implemented to include hydroseeding and pro-
tection of the slopes with hay, or the use of other means of erosion reduction.
We wish to thank you for using our firm for this project, and hope that we may be of
further service to you. We will be pleased to answer any questions that you might have
regarding this consultation letter.
Exclusion of Warranties: Our services consist of professional opinion only, derived in
accordance with current standards of professional practice. No other warranty is either
expressed or implied,
Very truly yours,
10 CROSBY & ASSOCIATES
/h,A. Stillman
C.E.G. 1868
G.157 25 QPpFESS/0/
R
o K. Crosby co . GE250
C.E.G. ;:v
357 cs
G.E. 250 w E,:p. 9-05
JO CROSEV & ASSOCIATES
.Fn RCnm¢m ,.rm.uirary*.
SINCE 1965
RECEIVED
0 COTTON, SHIRES & ASSOCIATES, INC. ATTNFwm q
CONSULTING ENGINEERS AND GEOLOGISTS rrsrs�ea n[ JOS AITOS 0.11ILS
March 1, 2005
L0184
TO: Carl Cahill
Planning Director
TOWN OF LOS ALTOS HILLS
26379 Fremont Road
Los Altos Hills, California 94022
SUBJECT: Geotechnical Peer Review
RE: Wessbecher, Grading
#18-05-ZP-SD-GD
11021 Magdalena Road
At your request, we have completed a geotechnical peer review of the subject
application using:
Review of Proposed Grading (letter), prepared by Jo Crosby and
Associates, dated October 12, 2004;
Site Development Plan (1 sheet, 20 -scale), prepared by Giuliani
and Kull, Inc., dated November 18,2004; and
Slope Stabilization Plan (1 sheet, 10 -scale), prepared by Giuliani and
Kull, Inc., dated September 30, 2004.
In addition, we have reviewed pertinent maps from our office files and
completed a recent site inspection.
DISCUSSION
The applicant proposes to remove a portion of an existing cut slope on the west
side of the property. Proposed grading extends west onto common areas of the adjacent
Quarry Hills Subdivision along the top of the quarry rim. According to the referenced
documents, proposed cuts will be up to 11 feet (maximum depth) and proposed
earthwork quantities include 650 cubic yards of material to be excavated and exported
from the site. The proposed grading would bring a portion of the adjacent quarry rim to
the elevation of the existing building pad.
We understand that the applicant is concerned about slope stability issues
potentially impacting the residence currently under construction on the property. In our
previous project peer review letter Qune 7, 2002), we indicated concurrence with the
Project Geotechnical Consultant's (Nielsen Geotechnical, Inc.) conclusion that the
proposed residence was not at significant risk with respect to potential quarry rim
instability.
The proposed grading area is generally characterized by a steep to precipitous
(43 to over 100 percent inclinations) west- north- and east -facing hillslopes. These slopes
have been previously graded in association with construction of residences on the site
Northern California Office Southern California Office
330 Village Lane 5245 Avenida Encinas • Suite A
Los Gatos, CA 95030-7218 Carlsbad, CA 92008-4374
(408) 354-5542 • Fax (408) 354-1852 (760)931-2700 • Fax: (760) 931-1020
e-mail: losgatos@cottonshires.com www.cottonshires.com e-mail: Carlsbad®cottonshires.com
Carl Cahill March 1, 2005
Page L0184
and an access road along the top of the quarry. Adjacent to, and downslope of the
proposed grading area, previous quarry grading activity resulted in several precipitous
to near vertical stepped excavations/benches that extend down to the current water
level in the abandoned quarry pit. The individual slopes are ten to fifteen -feet high. The
top of the west facing quarry slope is approximately 30 feet west of the property line.
Drainage at the site is primarily characterized by sheetflow along the cut slopes, and
north -directed, channelized flow along the quarry access road.
The property is underlain, at depth, by mapped greenstone bedrock of the
Franciscan Complex. Greenstone is exposed in the cut slopes described above.
The proposed grading is constrained by precipitous slopes, potentially pre-
existing ground cracks, potential landslides within the unstable quarry rim, potential
rock fall hazards during project grading, and possible redirection of runoff to potentially
unstable slopes. The referenced letter by Jo Crosby and Associates acknowledges
similar constraints, and while they conclude that the proposed grading would not have
adverse effects on long-term stability of the slopes in the general area, they note that
such grading does not guarantee long-term slope stability. However, they cite previous
reports indicating that future landsllding may affect areas within 30 feet of the quarry
rim, and recommend erosion control measures be implemented.
0 We concur with Jo Crosby and Associates that the proposed grading would not
negatively impact the stability of the slopes, provided that adequate drainage and
erosion control measures are implemented. We also agree with the previous Nielsen
Geotechnical conclusion that the proposed residence does not appear to be at significant
risk with respect to potential quarry rim instability; however, potential failure of the
existing quarry rim (over time) could reduce the distance between the residence and
brink of the quarry rim. Proposed project grading will result in some reduction of earth
material loading, in this isolated area at the top of the quarry rim, and thereby could
help to reduce the scale of future quarry rim failures. We do not have geotechnical
objections to the proposed grading as long as appropriate measures are added to the
current grading plan to properly control surface drainages We recommend that the
following conditions be attached to the application:
Updated Grading and Drainage Plan - An updated project grading and
drainage plan should be prepared that depicts properly controlled
conveyance of surface drainage (formerly conveyed along an unpaved
roadway alignment along the quarry rim) in a south to north direction
through the area of proposed grading. No new surface flow should be
directed over the quarry rim. Drainage improvements in the Quarry Hills
Subdivision common area should be designed for low maintenance
requirements.
A revised plan should be submitted to the Town, for review by the Town
Engineer, prior to issuance of permits for project construction.
2. Geotechnical Plan Review- The applicant's geotechnical consultant should
review and approve all geotechnical aspects of the project grading plans (i.e.,
site preparation and grading, and site drainage improvements) to ensure that
COTTON, SHIRES & ASSOCIATES, INC.
Carl Cahill
Page 3
March 1, 2005
L0184
thew recommendations have been properly incorporated. The consultant
should specifically address the proposed drainage design and locations of
drainage discharge locations in terms of minimizing adverse impacts to slope
stability.
The results of the Geotechnical Plan Review should be summarized by the
geotechnical consultant in a letter and submitted to the Town Engineer prior
to issuance of permits for project construction.
3. Geotechnical Field Inspection - The geotechnical consultant should inspect,
test (as needed), and approve all geotechnical aspects of the project
construction. The inspections should include, but not necessarily be limited
to: site preparation and grading, and site surface drainage improvements.
The presence of anticipated earth material properties should be confirmed.
The results of these inspections should be described by the geotechnical
consultant in a letter and submitted to the Town Engineer for review prior to
final (as -built) project approval.
LIMITATIONS
This review has been performed to provide technical advice to assist the Town
with discretionary permit decisions. Our services have been limited to review of the
documents previously identified, and a visual review of the property. Our opinions and
conclusions are made in accordance with generally accepted principles and practices of
the geotechnical profession. This warranty is in lieu of all other warranties, either
expressed or implied.
POS:TS:RR:st
Respectfully submitted,
COTTON, SHIRES AND ASSOCIATES, INC.
TOWN GEOTECHNICAL CONSULTANT
Ted Sayre
Su ervismg Engineering Geologist
CEG-) 7995
atrick O. Shires
Principal Geotechnical Engineer
GE 770
COTTON, SHIRES & ASSOCIATES, INC.