Loading...
HomeMy WebLinkAbout3.2 TOWN OF LOS ALTOS HILLS June 10, 1998 Staff Report to the Planning Commission RE: SITE DEVELOPMENT PERMIT FOR A NEW RESIDENCE & POOL; LANDS OF ALLISON; 11030 MAGDALENA AVENUE; FILE#71-98-ZP-SD. FROM: Suzanne Davis, Planner JD APPROVED BY: Curtis S. Williams, Planning Directijj RECOMMENDATION That the Planning Commission: Approve the requested site development permit as submitted, subject to the recommended conditions in Attachment 1. BACKGROUND The subject property is a flag lot located on the south side of Magdalena Avenue, west of Jabil Lane. The driveway is shared by the neighbor to the west. The Town has no map of record for the property so a Certificate of Compliance will be required. All of the existing development including the house, garage, pool and hardscape will be demolished. Surrounding properties are all developed with single-family residences. There is a pending application for a new residence on the adjacent property to the east (accessed from Jabil Lane). There is a fifteen foot wide access easement over the panhandle, continuing along the west property line, with an additional five foot wide access easement from the end of the panhandle to the south property line. CODE REQUIREMENTS As required by Section 10-2.301 of the Site Development Ordinance, this application for a new residence has been forwarded to the Planning Commission for review and approval. Criteria for review from the Site Development Ordinance include grading, drainage, building siting, pathways, landscape screening and outdoor lighting. Zoning Code review encompasses compliance with floor and development area requirements, setbacks, height and parking. DISCUSSION Site Data Gross Lot Area: 1.34 acres Net Lot Area: 1.254 acres Average Slope: 10.8% Lot Unit Factor: 1.23 Floor and Development Area Area Maximum Proposed Existing* Increase Left Development 18,081 17,959 9,654 +8,305 +122 Floor 7,331 7,294 3,186 +4,108 +37 *Existing house,pool,driveway and other hardscape to be demolished. Planning Commission June 10, 1998 Lands of Allison Page 2 Site and Architecture The applicants are requesting approval of a site development permit to construct a new 5,401 square foot one-story residence with a 1,306 square foot attached garage and a pool and spa. The floor area figures in the above table includes 401 square feet that is counted for an outdoor space that has three walls anda roof, and 186 square feet of attic space that has a floor to ceiling height of seven feet or more. Existing development including a residence with attached garage, pool, driveway and other hardscape will all be demolished in favor of the proposed project. Exterior materials would consist of plaster siding, wood windows, doors and trim, and slate tile roofing. The maximum height of the main roof ridge would be 211/2 feet as measured from the building pad. The peak of the round front entry element would be 22 feet from the building pad. The varying wall planes and roof lines, and architectural detailing serve to provide interest and reduce bulk and mass. The moderate height will keep the profile of the house down, and the greater setbacks will reduce visual impacts. Mature vegetation on the property would help screen the property from most off-site views. The new residence has been located in about the same place as the existing house, although the building footprint is larger. Story poles have been placed on the site for the Commission's review. The plans would bring the total development area to within 122 square feet and the floor area to less than 50 square feet of the allowable numbers. Staff has included a condition requiring a disclosure statement to be recorded that states that the floor area has been maximized and the development area is close to the maximum allowed (condition#10). Driveway and Parking The existing driveway is already within the side setback. The new driveway is in the same location, but has an added circular element that would add more paving within the setback. Because the driveway is longer than 150 feet, a fire turnaround is required. The circular portion of the driveway will meet this requirement. The garage is oversized so that more than three vehicles may be parked there. However, the Town does not recognize spaces in tandem, so only three garage spaces are counted towards the parking requirement. The fourth required parking space would be provided in the circular portion of the driveway. The new garage would be angled so that it will not directly face the access driveway, and it would not be seen from Magdalena Avenue. Trees & Landscaping The existing landscaping on the site includes mature trees that would screen most of the view of the residence from properties off Magdalena Avenue and Jabil Lane. Three eight-inch oaks and one 24-inch pine are proposed to be removed. The removal of these trees would not significantly alter the views into the site. The neighbors across the private driveway (11020 Magdalena) would have the most direct view of the new house. The Environmental Design & Protection Committee commented that landscaping will be needed to mitigate the view of the house from this neighbor. The Committee also requested that the existing trees be protected during construction and that the oaks along the driveway be saved. The applicants intend to preserve these oak trees. A landscape screening plan will be reviewed at a Site Development Hearing once the new residence is framed. Condition #2 includes a requirement for three 24-inch box oaks to be planted to replace the three oaks being removed. Condition#9 includes a requirement for fencing at the driplines of those trees potentially impacted by construction activities. Planning Commission June 10, 1998 Lands of Allison Page 3 Outdoor Lighting Proposed exterior lighting is shown on the floor plans (sheet A2). One light is indicated at each exit with two at the front entry and four at the garage. There are some areas where there are two lights off a single room. However, there are double doors in these locations, and the number of lights has been minimized (for example there are two lights off the living room where there are three sliding doors). Staff recommends deletion of one light at the garage. Condition#7 requires lighting specifications to be reviewed and approved by the Planning Department, prior to acceptance of plans for building plan check. Any fixtures that would be visible from off the site will be required to be down shielded or to have translucent glass so that the light source cannot be seen. Any landscape lighting will be reviewed when the landscape screening plan is submitted. Grading & Drainage The Engineering Department has reviewed the preliminary grading and drainage plan, and has recommended conditions of approval included in Attachment 1. Proposed grading is 500 cubic yards of cut and 100 cubic yards of fill. The surplus 410 cubic yards of material is to be removed from the site. The grading is primarily for foundation excavation and to pull the slope back from the south side of the house. There would be a three foot high retaining wall along the southerly end of the house. Site drainage will be directed from a series of catch basins around the house and garage to a piped system that would daylight in two locations. Energy dissipaters will slow the water as it is released and will help prevent erosion. The property will remain on a septic system. A new septic tank and leach field will be installed as required by the Santa Clara County Health Department. The final drainage and grading will be inspected by the Engineering Department, ' and any deficiencies will be required to be corrected prior to final inspection. Fire Department Review The Santa Clara County Fire Department conducted a flow test on the closest hydrant and determined that the water flow is not adequate for a home of the proposed size, and a fire sprinkler system will"be needed. The Fire Department also requested that the property address be placed in a location that is clearly visible from the street (see Attachment 2). The driveway will be 14 feet wide with 131/2 feet of vertical clearance to facilitate Fire Department access. The • driveway design would also allow emergency vehicles to turn around. The Fire Department recommendations have been included with the conditions of approval. Committee Review The Environmental Design & Protection Committee comments were discussed in the landscape and lighting sections of this report (see Attachment 3). The Pathways Committee has no request for pathway improvements or easements (see Attachment 4). Since no pathway improvements are required and the project is adding more than 900 square feet of habitable floor area, a pathway fee has been requested pursuant to Section 10- 2.608 of the Site Development Ordinance. The fee of$7.00 per linear foot of the width of the lot (excluding the pandandle) would provide for future path improvements in the Town (condition #11). Staff is available to answer any questions that the Commission or the public may have. Planning Commission June 10, 1998 Lands of Allison Page 4. ATTACHMENTS 1. Recommended conditions of approval 2. Comments from Santa Clara County Fire Department, dated•May 7, 1998 (two pages) 3. Environmental Design & Protection Committee Evaluation, received April 29, 1998 (one page) 4. Pathway Committee recommendation(one page) 5. Worksheet#2 6. Development plans: site, floor& roof plans, building sections, and elevations (nine sheets) cc Wayne & Gail Allison 150 E. El Camino Rea; Mountain View, CA 94040 Gary Kohlsaat, Architect P. 0. Box 1500 Los Gatos, CA 95031 Susan Roberts Giuliani & Kull, Inc. 20431 Stevens Creek Blvd., Suite 230 Cupertino, CA 95014 ATTACHMENT'1 - RECOMMENDED CONDITIONS FOR SITE DEVELOPMENT PERMIT FOR NEW RESIDENCE & POOL LANDS OF ALLISON- 11030 MAGDALENA AVENUE File #71-98-ZP-SD-GD A. PLANNING DEPARTMENT: 1. Any changes or modifications to the approved plans shall be approved by the Planning Director or the Planning Commission, depending upon the scope of the changes. 2. Subsequent to final framing, a landscape screening and erosion control plan shall be reviewed at a Site Development hearing. Particular attention shall be given to plantings which will help screen the site from neighboring properties and from the roadway. A minimum of three 24-inch box oaks shall be planted to replace oak trees being removed for the project. All landscaping required-for screening purposes or for erosion control (as determined by the City Engineer and the Planning Director) must be installed prior to final inspection, unless the Planning Director finds that unusual circumstances, such as weather or site conditions, require that planting be delayed. In those instances, a deposit of an amount equal to the cost of landscape materials and installation, to the satisfaction of the Planning Director, shall be submitted to the Town. Landscaping shall in any event be installed not later than six months after final inspection, or the deposit will be forfeited. 3. A landscape maintenance deposit (or certificate of deposit), equal to the cost of materials and installation for all landscaping required for screening purposes or for erosion control (as determined by the City Engineer), but not to exceed $5,000.00, shall be posted prior to final inspection. An inspection of the landscape to ensure adequate establishment and maintenance shall be made two years after installation. The deposit will be released at that time if the plantings remain viable. 4. Fire retardant roofing is required for the new construction. 5. Paint colors shall be chosenby the applicant and approved by staff in conformance with the Town's adopted color board, and shall exhibit a light reflectivity value of 50 or less. Roofs shall use materials which have a light reflectivity value of 40 or less. White trim area should be minimized, particularly on large surfaces such as doors, garage doors, columns, railings, and trellises. A color sample shall be submitted to the Planning Department for approval,prior to acceptance of plans for building plan check. All applicable structures shall be painted in conformance with the approved color(s) prior to final inspection. 6. At the time of foundation inspection(s), the location, and elevation of the new residence shall be certified in writing by a registered civil engineer or licensed land surveyor as being in/at the approved locations and elevations shown on the approved site development plan. At the time of framing, the height of the structure shall be similarly certified as being at the height shown on the approved site development plan. The hardscape, driveway and pool locations shall also be certified at time of installation. • Planning Commission June 10, 1998 Lands of Allison Page 6 _ 7. The outdoor lighting locations are approved as shown on the floor plans, except that one light shall be deleted at the garage. Any changes to the approved plan requires approval by the Planning Department prior to installation. Lighting specifications shall be submitted for Planning Department approval prior to acceptance of plans for building plan check. Lighting shall be down shielded, low wattage, shall not encroach or reflect on adjacent properties, and the source of the lighting shall not be visible from off the site. 8. Standard swimming pool conditions: a. Lights shall be designed so that the source is not visible from off-site. b. Drainage outfall structures shall be constructed and located to the satisfaction of the City Engineer. c. Fencing or a locking pool cover is recommended for safety. d. Equipment shall be enclosed on all four sides for noise mitigation and screening, and shall not encroach into any required building setbacks. 9. Any significant trees shall be fenced at the dripline, prior to commencement of any grading or construction. The fencing shall be of a material and structure to clearly delineate the driplines. Town staff must inspect and approve the fencing prior to issuance of any building permits. The fencing must remain throughout the course of construction. No storage of equipment, vehicles or debris shall be allowed within the dripline of the fenced trees. 10. A disclosure statement shall be recorded stating that the floor area approved under this permit is the maximum, and the development area is close to the maximum allowable level of development allowed by the Town. The disclosure statement will be prepared by the Planning Department and shall be signed and notarized by the property owners prior to acceptance,of plans for building plan check. 11. A pathway fee ($7.00 x 220 feet) shall be paid to the Town,prior to acceptance of plans for building plan check. B. ENGINEERING DEPARTMENT: 12. A Certificate of Compliance shall be issued for this property. The property owners shall submit a legal description and plat exhibits prepared by a licensed land surveyor for the boundary of the property in addition to title history from prior to the Town's incorporation in January 1956 to the present. All required documents shall be submitted to and approved by the Town,prior to acceptance of plans for building plan check. 13. Any, and all, changes to the approved grading and drainage plan shall be submitted as revisions from the project engineer and shall first be approved by the Town Engineering Department. No grading shall take place during the grading moratorium (November 1 to April 1) except with prior approval from the City Engineer. No grading shall take place within ten feet of any property line except to allow for the construction of the driveway access. 14. All public utility services serving this property shall be placed underground. Planning Commission June 10, 1998 Lands of Allison Page 7 15. An erosion and sediment control plan shall be submitted for review and approval by the Engineering Department prior to, acceptance of plans for building plan check. The contractor and the property owner shall comply with all,appropriate requirements of the Town's NPDES permit relative to grading and erosion/sediment control. The first 100 feet of the driveway shall be rocked during construction and all cut and fill slopes shall be protected from erosion. All areas on the site that have the native soil disturbed shall be protected for erosion control during the rainy season and shall be replanted prior to final inspection. 16. Two copies of a grading and construction operation plan shall be submitted by the property owner for review and approval by the City Engineer and Planning Director prior to acceptance of plans for building plan check. • The grading/construction plan shall address truck traffic issues regarding dust, noise, and vehicular and pedestrian traffic safety on Magdalena Avenue and surrounding roadways; storage of construction materials; placement of sanitary facilities; clean-up area; parking for construction vehicles; and parking for construction personnel. A debris box (trash dumpster) shall be placed on site for collection of construction debris. Arrangements must be made with the Los Altos Garbage Company for the debris box, since they have a franchise with the Town and no other hauler is allowed within the Town limits. 17. The property owner shall inform the Town of any damage and shall repair any damage caused by the construction of the project to pathways, private driveways, and public and private roadways, prior to final inspection and release of occupancy permits and shall provide the Town with photographs of the existing conditions of the roadways and pathways, prior to acceptance of plans for building plan check 18. The driveway shall be fully constructed to the satisfaction of the City Engineer, prior to final inspection. 19. A permit for the septic system shall be issued by the Santa Clara County Health Department prior to acceptance of plans for building plan check. All conditions of the Health Department shall be satisfied prior to final inspection. 20. The site drainage associated with the development shall be designed as surface flow wherever possible to avoid concentration of the runoff. The proposed drainage shall be designed to maintain the existing flow patterns. A fmal grading and drainage plan that has been stamped and signed by a registered civil engineer shall be submitted and approved by the Engineering Department prior to acceptance of plans for building plan check. Final grading and drainage shall be inspected by the Engineering Department and any deficiencies corrected to the satisfaction of the Engineering Department prior to final inspection. A letter shall be submitted from the project engineer stating that the drainage improvements were installed as shown on the approved plans and in accordance with their recommendations prior to final inspection. Planning Commission • June 10, 1998 Lands of Allison Page 8 C. FIRE DEPARTMENT 21. The property address shall be placed so that they are clearly visible and legible from Magdalena Avenue. Numbers shall contrast with the background and shall be a minimum of four inches high. 22. The driveway shall be a minimum of 14 feet wide and shall have an unobstructed vertical clearance of 13 feet six inches. The driveway shall have an all weather surface that is designed and maintained to support the imposed loads of fire apparatus (40,000 pounds) and the gradient shall not exceed 15%. 23. An on-site fire turnaround is required since the driveway length exceeds 150 feet. If any changes are made to the driveway design, the plans shall be approved by the Santa Clara County Fire Department,prior to acceptance of plans for building plan check. 24. An automatic residential fire sprinkler system approved by the Santa Clara County Fire Department shall be included in the new residence. The details of the sprinkler system shall be included with construction plans. The plans shall be stamped and signed by the Fire Department and submitted to the Town,prior to acceptance of plans for building plan check, and the sprinklers shall be inspected and approved by the Fire Department, prior to final inspection. The applicant may propose alternate means of achieving an acceptable water supply in lieu of fire sprinklers, subject to the approval of the Fire Department. Upon completion of the construction, a final inspection shall be required to be set with the Planning and Engineering Departments two weeks prior to final building inspection approval. CONDITION NUMBERS 5, 7, 10, 11, 12, 15, 16, 17, 19, 20 AND 24 SHALL BE COMPLETED AND SIGNED OFF BY THE PLANNING AND ENGINEERING DEPARTMENTS PRIOR TO ACCEPTANCE OF CONSTRUCTION PLANS FOR PLAN CHECK BY THE BUILDING DEPT. Protective tree fencing shall be installed and approved by the Planning Department, prior to issuance of any building permits. Properties residing within the Los Altos or Palo Alto School District boundaries must pay School District fees before receiving their building permit from Los Altos Hills. The applicant must take a copy of Worksheet #2 to the school district office(s), pay the appropriate fees, and provide the Town with a copy of their receipts. NOTE: The Site Development permit is valid for one year from the approval date (until June 10, 1999). All required building permits must be obtained within that year and work on items not requiring a building permit shall begin within one year and completed within two years. • ATTACHMENT 2 x,ARe�,c `',��� FIRE DEPARTMENT SANTA CLARA COUNTY CONTROL NUMBER 14700 Winchester Blvd., Los Gatos, CA 95030-1818 BLDG PERM NUMBER COURTESY 8SERVICE (408) 378-4010 (phone) • (408) 378-9342 (fax) PLAN REVIEW NUMBER 98- 1093 FILE NUMBER DEVELOPMENT REVIEW COMMENTS CODE/SEC. SHEET NO. REQUIREMENT Review of proposed 4,108 square foot addition to an existing 3,186 square foot single family residence. The new area for this structure is now 7,294 square feet. The planner for this project is Ms. Suzanne Davis. 1 Review of this Developmental proposal is limited to acceptability of site access and water supply as they pertain to fire department operations, and shall not be construed as a substitute for formal plan review to determine compliance with adopted model codes. Prior to performing any work the applicant shall apply to the Building Department for applicable construction permits. UFC 2 Required Fire Flow: Required fire flow for this project is 2,250 GPM at 20 psi Appendix IIIA residual pressure. The required fire flow is notavailable from area water mains and fire hydrant(s) which are spaced at the required spacing. UFC 3 Required Fire Flow Option (Single Family Dwellings): Provide an approved 903.2 fire sprinkler system throughout all portions of the building. The fire sprinkler system shall conform to National Fire Protection Association Standard #13D, 1994 Edition, and local ordinance requirements. See also our standard V-1 attached for fire sprinkler design criteria. UFC 4 Premises Identification: Approved numbers or addresses shall be placed on all 901.4.4 new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Numbers shall contrast with their background and be a minimum of four inches in height. DISTRICT PLANS SPECS NEW RMDL AS OCCUPANCY CONST.TYPE PERMITTEE DATE PAGE LAH .0 0 0 0 0 GARY KOHLSAAT 05/07/98 1 OF 1 SECJFLOOR AREA LOAD DESCRIPTION BY Commercial Construction Hokanson,Wayne NAME OF PROJECT LOCATION SFR-ALLISON 11030 Magdalena Av A California Fire Protection District serving Santa Clara County and the communities of Campbell, Cupertino, Los Altos, Los Altos Hills, Los Gatos, Monte Sereno, Morgan Hill, and Saratoga 06/02/98 t-':'-11:58 "1408 378 9342 CFPD 141003/003 ' 4. ° `'cot, FIRE DEPARTMENT ARTMENNT et 4k 111 QI I a SANTA CLARA COUNTY CONTROL NUMBER ' EST1917 14700 Winchester Blvd.,Los Gatos, CA 95030-1818 BLDG PERMIT NUMBER. 1 (phone)• (408) 378-9342(fax) COURTESY a sEnv�ee (408)378-40 0 • PLAN REVIEW NUMBER 9 8 1093 FILE NUMBER DEVELOPMENT REVIEW COMMENTS CODE/SEC. SHEET NO. REQUIREMENT UFC 5 Firs._Department (Engine) Driveway Turn-around Required: Provide an 902.2.2.4 approved fire department engine driveway turnaround with a minimum radius of 36 feet outside and 23 feet inside. Installations shall conform with Fire Department Standard Details and Specifications D-1. Note that a portion of the new circular drive may satisfactorily accommodate a portion of the turn-around dimension. Refer to standard & detail D-1 attached. DISTRICT PLANS SPECS NEW RMDL AS OCCUPANCY CONST.TYPE I PERMITTEE DATE PAGE LAH 0 0 0 0 0 Ill GARY KOHLSAAT 05/07/98 2 OF 2 SECJELOOR AREA LOAD DESCRIPTION BY Commercial Construction Hokanson,Wayne NAME OF PROJECT LOCATION • SFR-ALLISON 111030 Magdalena Av A California Fire Protection District serving Santa Clara County and the communities of Campbell,Cupertino,Los Altos,Los Altos Hills,Los Gatos, Monte Sereno, Morgan Hill, and Saratoga • • ATTACHMENT 3 ENVIRONMENTAL DESIGN COMMITTEE RZe �► NEW RESIDENCE EVALUATION '�� 2 9 4u r • J vein, 4998 Applicant's Name: U�� l����� Address: Reviewed by: 1,n J-- -,t c ,.2 „,cam Date: -2 q Existing Trees: (Comment on size, type, condition, location with respect to building site. Recommended protection during construction.) • �-)/L C/1r tC -f�-'rte / s s� G fi� — j70c;--) 6-c— Proposed Grading: (Impac on water table, nearby vegetation. rosion poten ial. All grading at least 10' from property line?) Creeks and drainage: (Should a conservation easement be recommended? Sufficient space between house and conservation easement for circulation. Will construction impact wildlife migration (bridges, fences)? Is there a need for removal of invasive species?) Siting: (View impact: ridgeline, across valley, on neighbors. Will driveway impact neighbors' privacy (lights, noise)? Recommended mitigation (height, color,-landscape).) _ �,�-!tom-j r�: �� , ;�•,����� Other Comments: 1 -6I.-r'At- • Ai lAchMEN I LI- Town of Los Altos Hills n.;-. -1:„.. 7p.J 5/21/98 To: Planning Commission & Staff 12010 Elsie Way; Lands,c4 Iurthy& From: Les Earnest, Pathways Srinath Restore H-13patl�f'laPo ALTOS HILLS Committee Chair Concepcion Road. 3/23/98 Subject 1998 Pathway 25935 Estacada Way; Lands of Lee No recommendations request. 2/23/98 This is a cumulative listing of all 25461 Fremont Road; Lands of pathway recommendations for 1998, in Zatparv'an Restore II-B path along alphabetical order by street and number, Fremont and construct II-B path along with the effective date at the end of Robleda. 5/21/98 each item. In cases where a 25518 Hidden Springs Lane;Lands of recommendation for a given address has Bower: Restore II-B path along been revised, two dates are shown but Altamont; reconstruct II-B path along only the final recommendation is listed. eastern boundary. 2/23/98 Where construction or upgrading of 24004 Oak Knoll Circle; Lands of paths to the II-B standard is Gorman: Restore II-B path along Oak recommended, it is to include irrigation Knoll Circle; construct a II-B path along at least 5 feet away from path and a Stonebrook from Oak Knoll Circle to a non-slip surface on any crossing point opposite the beginning of the II-B driveways. Where there is"no request" path on the West side of Stonebrook and the Committee recommends that in lieu from that point construct a native path fees be collected where possible. at the toe of the slope along Stonebrook Recommendations connecting to the existing native path leading to Juan_Prado Mesa Preserve. 12025 Adobe Creek Lodge Road;Lands of 1/26/98 Chang Construct II-B path along Adobe Creek Lodge Road separated from the 11030 Magdalena Avenue; Lands of 1 -- - --road by 5 feet. Construct II-B path in a Allison: No request. 4/27/98 20 foot easement adjacent to Moody 14470 Manuella; Lands of Kwong Road at the toe of the slope. 1/26/98 Construct II-B path along Manuella. 26131 Altadena Drive; Lands of Ewald: 3/23/98 Acquire pathway easement and 12580 Miraloma Way; Lands of Harari construct a II-B path parallel.to No request. 1/26/98 Altadena. 4/27/98 11471 Page Mill Road; Lands of Wilson: 26157 Altadena Drive; Lands of Korman: Provide sufficient easement along Page Require easement along Kingsley Way Mill Road to encompass at least 10 feet and construct a II-B path from the from the top of the bank and construct a entrance to Esther Clark Park to a point native path along this route; construct 20 feet beyond where the path begins an off-road native path on the South on the other side of Kingsley. 5/21/98 side of Buena Vista Drive beginning 12238 Via Arline;Lands of Robinson& about 50 feet from Page Mill Road and Ikeda: No request. 1/26/98 ending adjacent to Buena Vista'at the East.boundary of the property and 12246 Via Arline;Lands of Godby: No provide a pathway easement at least 10 request. 3/23/98 feet wide that encompasses this route. 14470 De Bell Road; Lands of Wong No 1/26/98 request. 1/26/98 11972 Rhus Ridge Road; Lands of Malek: 27760 Edgerton Road; Lands of No request. 1/26/98 Birnbaum: Construct II-B path along 13474 Robleda Road; Lands of Danvers Edgerton. 5/21/98 No request. 3/23/98 • 26379 Fremont Road • L \j s•Hills,California 94024 • (415) 94(-- 222 • FAX(415)941-3160 PLANNING DEP ATTACHMENT Cj WORKSHEET #2 . EXISTLVG AND PROPOSED DEVELOPMENT AREA AND FLOOR AREA . • TURN IN WITH YOUR APPLICATION • r.PROPERTY OWNER'S NAME AL-1...1 SO 0 PROPERTY ADDRESS 11050 V i-6\oe 1.± A CALCULATED BY - C.ItULIAIJI • . W,U l.•tr. I DATE to I q T 1. DEVELOPMENT AREA (SQUARE FOOTAGE) Existinc 1 Proposed Total C� �- d e i L ?(ddi tions tions) • 2.90( A. House and Garage (from Part B) 31 e)G, q 13$ --74-ei23- B. . 12/_&,,,t,06./.4 4.1 14'10•6: ::- . • LI e C. Driveway and Parking (Measured 100' along centerline) 2:1 Qj,2 L-( OJU DeX) D. Patios and Walkways (Pfrirn 1 IP o - l GO poRT E. Tis Court 1 a100 ( 900 F. Pool and Decking 3 7 j S - Z-94.00 O Poo L— OV N.P & •bib's• Sk d_ G. - - _ . : . .. .i.. s 1 G) WOO ( 00 H. Any other coverage tI bldg• 7 ' TOTALS 9 c,s4 i-1 11f11 3 (7J l// 959 . • . Ma lum Development Area Allowed - MDA (from Worksheet #1) I 2cl s 2. FLOOR AREA (SQUARE FOOTAGE) Existing Proposed Total C-D . da..(M.o(,i iuct;(Additions or Deletions) A. House and Garage a. 1st Floor r2-Liq 3 '5,- o l --}D 1 b. 2nd Fleer- Go`C • Porn'oS . 14-o I 44-01 c Attic and Basement - - l 1 d. -arage '7 t} 3 13a (o - b B. Accessory Buildings a. 1st Floor ' b. 2nd Floor c. Attic and Basement - TOTALS 318Co 72941 1 o iS -°- 7 29-1 Maximum Floor Area Allowed - MFA (from Worksheet #1) 1 133/ I TOWN" USE ONLY , 1 CHECKED UY I�a{rl I�1Q, 3Vl�S I DATE Ll-�2l 1 Revised 12/09/93 L M?�C j�lORIGINALS/FL �i`J►NC/W heeC�Z C O -r F DS% (-4-b l sq . - . -ti--- uZeN T:t.rs Wnb 1 t d mi. c, arQa Kl et-. 1!n. liL ,4(1 t-- b r cater — l E6 sq. • -#- •