Loading...
HomeMy WebLinkAbout4.3 Town of Los Altos Hills June 23, 1998 Staff Report to the Planning Commission RE: SITE DEVELOPMENT PERMIT FOR A NEW RESIDENCE, POOL AND GAZEBO; LANDS OF YEH; 24055 JABIL LANE; File#30-98-ZP-SD-GD. FROM: Susan Stevenson, Planner4S5 APPROVED BY: Curtis S. Williams, Planning Dire tp,) RECOMMENDATION That the Planning Commission EITHER: 1. Approve the requested site development permit with the attached conditions requiring that the applicant reduce the proposed development area so as not to exceed the MDA; reduce the height of the residence by 2 feet and reduce the height of the entry element by 2 feet to reduce massing of the structure; and reduce the height of the proposed fence along the front property line; OR 2. Require the applicant to redesign the residence to reduce the bulk of the second story area, reduce the development area to meet the maximum development area and reduce the extent of retaining wall proposed. BACKGROUND The subject property is located at the southwest corner of the Jabil Lane and Magdalena Avenue intersection. There is no subdivision information on the creation of this lot, therefore, a certificate of compliance will be required with the approval of the new residence (see condition#18). On June 10, 1998, the Planning Commission approved a new residence to the west of this lot at 11030 Magdalena Avenue (Lands of Allison). CODE REQUIREMENTS As required by Section 10-2.301 of the Site Development Ordinance, this application for a new residence has been forwarded to the Planning Commission for review and approval. Criteria for review from the Site Development Ordinance include grading, drainage, building siting, pathways, landscape screening and outdoor lighting. Zoning Code review encompasses compliance with floor and development area requirements, setbacks, height and parking. DISCUSSION Site Data: Net Lot Area: 1.06 acres Average Slope: 15.5% i Lot Unit Factor 1.02 Planning Commission Lands of Yeh June 23, 1998 Page 2 Floor Area and Development Area: Area Max. Prop. Exist. Incrs. Remaining Devel. 12,097 12,097** na* 12,097** 0 Floor 5,349 5,335 3,556* 5,335 14 *Existing development to be removed. **Condition#1 requires the reduction of development area to meet the MDA. Site and Architecture The applicant requests approval of a Site Development Permit for a new-4,465 square foot two story residence with an 870 square foot attached 4 car garage. The second floor area of 2,050 square feet includes areas which have more than 17 foot floor to ceiling heights (although false ceilings have been shown on the cross sections). A pool is proposed to the south of the residence and a 100 square foot gazebo is proposed at the south end of the property. The exterior material proposed for the residence is stucco siding with canvas awnings along the rear elevation and redwood trellises along the rear and front elevations. The applicant proposes to utilize slate tile roofing. A wrought iron fence is proposed along the front property line, 5.5 feet in height. The location of the fence would only allow for a 4.5 foot high open style fence per Section 10- 504(d)(2). Staff has conditioned that the fence be reduced in height to meet the Code (condition#1). Height and Visibility The maximum height of the house on a vertical plane would be 27 feet through the center portion of the house (front elevation), with the height of the roof dropping approximately 3 feet at the sides of the house. The rear, flat roofed portion of the residence (section 2, sheet A6) is designed to be 24 feet in height. The height of the residence from the lowest to highest point would be 27 feet, as the residence is located at a level portion of the site. A slab foundation is proposed at the center of the house to allow for the maximum height in the above ground elevation. It should be noted that the plans are not to scale, but the noted elevations are correct. Story poles have been erected on the site outlining the proposed new residence and gazebo for the Commissioners' review. The proposed structure would not be visible from Magdalena Avenue, as the site is set in from the corner of the intersection of Magdalena Avenue and Jabil Lane and there is mature landscaping along the north property line. As indicated by the story poles, the residence would be visible from Jabil Lane, however, Jabil Lane is a cul de sac which serves only 6 other properties. Much of the existing screening along the front will be cleared with the construction of the residence and driveway. Mature vegetation on the property, especially on the southern property line would help to screen the property from the neighboring parcels, and would limit views of the proposed residence from off site. A small section of new roofline will be visible from the new home to the west, with a minor impact on views from that site. The second story comprises 62 percent of the lower floor area of the main residence (second story includes open areas over 17 feet in floor to ceiling height). The residence has been designed with second story decks, redwood trellises, stucco banding between the first and second floor, the exterior spiral stairway and areas which are indented from the Planning Commission Lands of Yeh June 23, 1998 Page 3 first floor to try to mitigate the vertical massing of the residence. Nonetheless, there are several portions of the building which emphasize the vertical elements of the proposed residence. Specifically, the front entry is proposed to be approximately 24 feet in height, with a small deck at the second level above the front doors. Although the second floor area comprises 62 percent of the lower floor, the exterior elevations appear to have a full second story due to the large portion of open areas which have ceiling heights at or near 17 feet. Staff recommends that the applicant reduce the interior height of the open areas and that these portions of the building have the roof join the exterior wall at a lower height to try _to hide some of the second story area. In addition, the roof at the front entry should be dropped a minimum of 2 feet to allow the applicant to maintain the second story deck while reducing the mass of the front element. Lastly,the interior height of the attic spaces is 7 feet in many areas and could be reduced up to 2 feet to lower the height and profile of the building. A 100 square foot gazebo is proposed at the southern side of the property. The gazebo would be 16 feet in height. The gazebo is proposed approximately 2 feet below existing grade. Parking, Driveway, and Turnaround The applicant proposes to enter the site at the same location as the existing driveway entrance. The driveway entrance is proposed 20 feet in width and would provide entrance and turnaround to the 4 parking spaces provided in the garage. Staff recommends that the driveway be reduced from 20 feet in width to a maximum of 16 feet in width at the entrance and along the leg to the circular element to reduce the amount of proposed - paving in front of the residence and allow more area for screening. The engineer's site plan (second sheet) shows two driveway entrances to the property. The development area for this design was calculated incorrectly and the architect has proposed the design as shown on sheet Al. The elimination of the second entrance would allow for the preservation of the 12 inch oak tree in front of the turnaround in addition to reducing the development area. The applicant has indicated that the circular element would be constructed of grasscrete, to reduce the development area of the guest parking by 50 percent. The development area as calculated by the architect and staff do not coincide. Staff has calculated the driveway with approximately 600 square feet of development area over the maximum. This area could be removed through reducing the width of the driveway entrance and turnaround to 16 feet maximum, and/or reducing the development area for the pool and decking. Staff has included a requirement to reduce the total development area to meet the MDA prior to submittal of plans for building plan check. Lighting and Landscaping No skylights are proposed for the main residence at this time. Staff has included the standard skylight condition #10, in the event that skylights are requested at a later date. House lighting is shown on the site plan (sheet Al), with generally 2 lights at the garage, and 1 at the rear exit. Three lights are shown at the double doors along the rear of the house. Staff has included the standard lighting condition #8 including language for low wattage and downlit fixtures as well as a requirement to reduce the lighting along the rear double doors to 2 fixtures, and to require that landscape lighting be reviewed with the proposed landscaping, after the residence is framed. Planning Commission Lands of Yeh June 23, 1998 Page 4 The existing landscaping on the site includes heavy mature screening over much of the property which would screen the view of the residence from neighboring properties, particularly to the south and west of the site. Several larger pines are proposed to be removed with the construction, as well as because of bark beetle infestation. One 12 inch oak is located within the area of the circular drive, which will be saved with the change to the driveway design. Additional landscaping along the front of the property would help to screen the new residence from Jabil Lane. This has been required in condition#2. Grading and Drainage The plans indicate that the grading for the site would include 300 cubic yards of cut (maximum depth of 2.5 feet) and 110 cubic yards of fill (maximum depth of 1 foot). The residence has been proposed to be located slightly closer to the street than the existing residence, on a level portion of the lot. The residence as proposed would meet the Town's adopted grading policy, with the finished floor approximately 1 foot higher than the existing grade. The garage top of slab would be at the same elevation as the existing grade. The pool is proposed to be located approximately 2.5 feet below existing grade. A small retaining wall is proposed to be located all the way along the southeast side of the property, around the proposed gazebo and along the west property line. The wall is proposed as a curb at the south of the driveway and is up to 4 feet in height to the east of the gazebo, to create a flatter area around the pool. The wall along the west of the pool is proposed to be 2 feet in height. Minor retaining walls are proposed at the entrance of the property. The lowest wall is shown within the first 10 feet of the property and would be required to be moved, as no grading is allowed within the first 10 feet of the property (see condition #12). The Commission may wish to reduce or eliminate a portion of the perimeter walls if construed to be substantial modifications to the existing topography (although they would not be visible from off site). Drainage from the site is proposed to be piped to an existing drainage swale on the property which would flow into a culvert under Jabil Lane. Staff has included a condition (#22) requiring that the final drainage design be reviewed and that drainage be designed as sheet flow. Geotechnical Review and Drainage The Town's geotechnical consultant notes that the septic system has been located in an area of fill and that the applicant's geotechnical consultant should examine the feasibility of the design. The County Health Department has preliminarily approved the proposed septic system. Staff has included condition #9 requiring the review as well as geotechnical evaluation/update prior to preparation of detailed structural drawings or final grading plans. Fire Department Review The Fire Department's review of the plans indicated that there is not adequate fire flow available to the lot for the size residence proposed. The Fire Department has indicated that installing fire sprinklers in the residence would provide adequate fire protection and this has been included as a condition of approval (#26). The remaining comments from the Fire Department include standard conditions for house numbers, access dimensions, surface requirements, and road grade. Staff has included these as conditions#24-27. . Planning Commission Lands of Yeh June 23, 1998 Page 5 Committee Recommendations The Pathways Committee has recommended that a type II-B path be constructed along Jabil Lane from the southeast corner of the property to Magdalena Avenue. The subject property does not extend to Magdalena Avenue, however, and the pathway would be required to be installed only along the frontage of the property (condition #14). The Pathways Committee also requested that a pathway easement be required over Jabil Lane to accommodate the pathway intended to connect to the future pathway along Fernhill Drive. The Environmental Design Committee had a concern about the visibility of the second story from the home located across Jabil Lane. The Committee requested that taller trees be planted along the front to help break up the view from the street and this neighbor. Staff has included the standard condition;of approval (#2) that the landscape screening and lighting will be reviewed after framing of the residence. Staff is available to answer any questions that the Commission or community may have. ATTACHMENTS: 1. Recommended conditions of approval; 2. Revised Worksheet#2; 3. Fire Department letter, dated March 16, 1998; I 4. Letter from Cotton, Shires &Assoc., dated March 31, 1998; 5. Recommendation from Pathways Committee, dated March 23, 1998; 6. Recommendation from Environmental Design Committee, dated April 7, 1998; 7. Note from James Scott, arborist, dated April 24, 1998; 8. Development plans. cc: Bing and Deborah Yeh Kevin Chiang 24055 Jabil Lane 854 Hillview Drive Los Altos Hills, CA 94022 Milpitas, CA 95035 Planning Commission Lands of Yeh June 23, 1998 Page 6 ATTACHMENT j1 RECOMMENDED CONDITIONS FOR A SITE DEVELOPMENT PERMIT FOR A NEW RESIDENCE, GAZEBO AND POOL LANDS OF YEH, 24055 JABIL LANE FILE#30-98-ZP-SD-GD A. PLANNING DEPARTMENT: 1. The applicant shall redesign the height/location of the fence along the front property line to meet the Town's code requirements for fence heights. In addition, the driveway shall be redesigned to reduce the development area so as not to exceed the MDA and to reduce the width of the driveway to 16 feet maximum to reduce the paving in the front of the house. The front entry element shall be reduced a minimum of 2 feet and the ridge height of the residence shall be reduced by 2 feet through reducing the height of the attic space or other means. Plans shall be reviewed and approved by the Planning Director and Town Engineer prior to acceptance of plans for building plan check. Any further modifications to the approved plans requires prior approval of the Planning Director or Planning Commission depending upon the scope of the changes. 2. Subsequent to final framing of the residence, a landscape screening and erosion control plan shall be reviewed by the Site Development Committee. Special attention should be given to planting along front of the residence to mitigate the view of the house from the street. All landscaping required for screening purposes or fo'r erosion control (as determined by the City Engineer) must be installed prior to final inspection, unless the Planning Director finds that unusual crcumstances, such as weather or site conditions, require that planting be delayed. In those instances, a deposit of an amount equal to the cost of landscape materials and installation, to the satisfaction of the Planning Director, shall be submitted to the Town. Landscaping shall in any event be installed not later than 6 months after final inspection, or the deposit will be forfeited. 3. A landscape maintenance deposit (or; certificate of deposit), equal to the cost of materials and installation for all landscaping required for screening purposes or for erosion control (as determined by the City Engineer), but not to exceed $5,000.00, shall be posted prior to final inspection. An inspection of the landscape to ensure adequate establishment and maintenance shall be made two years after installation. The deposit will be released at that time if the plantings remain viable. 4. Paint colors shall be chosen by the applicant and approved by staff in conformance with the Town's adopted color board, and shall exhibit a light reflectivity value of 50 or less. Roofs shall use materials which have a light reflectivity value of 40 or 'less. White trim area should be minimized, particularly on large surfaces such as doors, columns, railings, and trellises. A color sample shall be submitted to the Planning Department for approval prior to acceptance of plans for building plan check. All applicable structures shall;be painted in conformance with the approved color(s)prior to final inspection. Planning Commission Lands of Yeh June 23, 1998 Page 7 5. Fire retardant roofing is required for the new construction. 6. At the time of foundation inspection for the house and gazebo, the location, and elevation of the new structures shall be certified in writing by a registered civil engineer or licensed land surveyor as being in/at the approved location and elevation shown on the approved site development plan. At the time of framing, the height of the structures shall be similarly certified as being atthe height shown on the approved site development plan. The hardscape, driveway, and pool locations shall also be certified at time of installation. 7. Prior to commencement of any grading on the site, all significant trees are to be fenced at the drip line. The fencing shall be of a material and structure to clearly delineate the drip line. Town staff must inspect the fencing and the trees to be fenced prior to commencement of grading. The property owner shall call for said inspection at least three days in advance of the inspection. The fence must remain throughout the course of construction. No storage of equipment, vehicles or debris shall be allowed within the drip lines of these trees. 8. The lighting for the exterior of the residence and accessory building is approved for locations as indicated. Any additional outdoor lighting requires approval by the Planning Department prior to installation. Lighting shall be down shielded, low wattage, and shall not encroach or reflect on adjacent properties. The source of the lighting shall not be visible from off the site. Light fixtures must be approved by the Planning Department prior to acceptance of plans for building plan check. No lighting may be placed within setbacks except for two driveway or entry lights. Lighting (other`than exterior house and accessory building lighting) shall be reviewed with the landscape screening plan for the residence. 9. As recommended by William Cotton & Associates in their report dated April 14, 1998, the applicant shall comply with the following: a. The applicant's geotechnical consultant should characterize the peak and repeatable ground motion in percent gravity for the Berrocal and San Andreas fault zones, using a current attenuation relationship. In addition, minimum standard-of-care pier design as discussed above (see letter) should be considered. The potential for adverse slope stability impacts associated with the septic leachfield system should be addressed. The applicant's geotechnical consultant shall review and approve all geotechnical aspects of the development plans (i.e., site preparation and grading, site drainage improvements and design parameters for retaining walls, foundations, driveway, and swimming pool) to ensure that his recommendations have been properly incorporated. The results of the plan review and supplemental evaluations should be summarized by the geotechnical consultant in a letter and submitted to the Town for review and approval by the Town Planning Commission Lands of Yeh June 23, 1998 Page 8 Geotechnical Consultant prior to acceptance of plans for building plan check b. The geotechnical consultant shall inspect, test (as needed), and approve all geotechnical aspects of the project construction. The inspections should include, but not necessarily be limited to: site preparation and grading, site surface and subsurface drainage improvements, and excavations for foundations prior to placement of steel and concrete. The consultant shall verify that new fill materials are properly compacted, keyed and benched where appropriate into competent earth materials. _ The results of these inspections and the as-built conditions of the project shall be described by the geotechnical consultant in a letter and submitted to the Town Engineer for review prior to final (as • built)project approval. For further detail, please refer to the Cotton, Shires & Associates letter dated April 14, 1998. 10. Skylights, if used, shall be designed to reduce emitted light and no light fixtures may be placed within skylight wells. 11. Standard swimming pool conditions: a. Lights shall be designed so that the source is not visible from off- site. b. Drainage outfall structures shall be constructed and located to the satisfaction of the City Engineer. • c. Fencing or a locking pool cover is recommended for safety. d. Equipment shall be enclosed on all four sides for noise mitigation and screening. B. ENGINEERING DEPARTMENT: 12. Any, and all, changes to the approved grading and drainage plan shall be submitted as revisions from the project engineer and shall first be approved by the Town Engineering Department. No grading shall take place during the grading moratorium between November 1 and April 1 except with prior approval from the City Engineer. No grading shall take place within 10 feet of any property line except to allow for the construction of the driveway access. 13. All public utility services serving this!property shall be undergrounded. 14. The applicant shall construct a type IIB pathway fronting the property along Jabil Lane. A 10 foot wide pathway easement shall be granted over Jabil Lane to accommodate the path. A legal description and plat prepared by a licensed land surveyor shall be submitted, and the applicant shall return the signed, notarized document to the Town,prior to acceptance of plans for building plan check. The work shall be completed to the satisfaction of the Engineering Department prior to final inspection. • Planning Commission Lands of Yeh June 23, 1998 Page 9 15. An erosion and sediment control plan shall be submitted for review and approval by the Engineering Department prior to acceptance of plans for building plan check. The contractor and the property owner shall comply with all appropriate requirements of the Town's NPDES permit relative to grading and erosion/sediment control. The first 100 feet of the driveway shall be rocked during construction and all cut and fill slopes shall be protected from erosion. All areas on the site that have the native soil disturbed shall be protected for erosion control during the rainy season and shall be replanted prior to final inspection. 16. Two copies of a grading and construction operation plan shall be submitted by the property owner for review and approval by the City Engineer and Planning Director prior to acceptance of plans for building plan check. The grading/construction plan shall address truck traffic issues regarding dust, noise, and vehicular and pedestrian traffic safety on Jabil Lane and surrounding roadways; storage of construction materials; placement of sanitary facilities; parking for construction vehicles; and parking for construction personnel. A debris box (trash dumpster) shall be placed on site for collection of construction debris. Arrangements must be made with the Los Altos Garbage Company for the debris box, since they have a franchise with the Town and no other hauler is allowed within the Town limits. 17. The property owner shall inform the Town of any damage and shall repair any damage caused by the construction of the project to pathways, private driveways, and public and private roadways,prior to final inspection and shall provide the Town with photographs of the existing conditions of the roadways and pathways prior to acceptance of plans for building plan check. 18. A Certificate of Compliance is required to be issued by the Town for this property. The property owner shall submit legal description and plat exhibits prepared by a registered civil engineer or a licensed land surveyor for the boundary of the property in addition to the title history for the property prior to the Town's incorporation in January 1946. The Town shall prepare the Certificate of Compliance. The required exhibits and tite history shall be submitted and approved by the Town prior to acceptance of plans for building plan check 19. A permit for the secptic system shall be issued by Santa Clara County Health Department prior to acceptance of plans for building plan check. 20. Conditions of Santa Clara County Health Department shall be met prior to final inspection. 21. The driveway shall be required to be fully constructed, to the satisfaction of the City Engineer,prior to final inspection. 22. The site drainage associated with the proposed development must be designed as surface flow wherever possible to avoid concentration of the runoff. The proposed drainage shall be designed to maintain the existing • flow patterns wherever possible. A final grading and drainage plan shall be submitted for approval by the Engineering Department prior to acceptance Planning Commission Lands of Yeh June 23, 1998 Page 10 of plans for building plan check. The plan shall show angular rock to be used at the outlet of the proposed storm drain system as it enters the existing culvert. Final drainage and grading shall be inspected by the Engineering Department and any deficiencies corrected to the satisfaction of the Engineering Department prior to final inspection. A letter shall be submitted from the project engineer stating that the drainage improvements were installed as shown on the approved plans and in accordance with their recommendations prior to final inspection. 23. The property owner shall grant a 30 foot wide storm drain easement to the Town over the drainage swale located within the property. The property owner shall provide legal description and plat exhibits that are prepared by a registered civil engineer or a licensed land surveyor and the Town shall prepare the grant document. The grant document, includig the approved exhibits, shall be signed and notarized by the property owner and returned tot he Town prior to submittal of plans for building plan check. C. FIRE DEPARTMENT: 24. Approved numbers or addresses shall be placed on all new and existing buildings to be plainly visible and legible from the street or road fronting the property. Said numbers shall contrast with their background and be a minimum of 4 inches in height with a 3/8 inch stroke. 25. The vertical clearance for the driveway shall be a minimum of 13 feet 6 inches. This dimension shall be maintained. The driveway shall have an all weather surface that is designed and, maintained to support the imposed loads of fire apparatus (40,000 pounds). The gradient for a fire apparatus access road (driveway) shall not exceed fifteen (15) feet. 26. Prior to final inspection, the applicant shall install a fire sprinklering system to assure that adequate flowIs available to the residence. The design of the fire sprinklering system shall be reviewed and approved by the fire department prior to acceptancie of plans for building plan check. 27. The gates shall be designed so that when open gates shall not obstruct any portion of the required access roadway or driveway width. If provided, all locks shall be fire.department approved. Installations shall conform with Fire Department Standard Details and'Specifications G-1. Planning Commission Lands of Yeh June 23, 1998 Page 11 Upon completion of construction, a final inspection shall be set with the Planning Department and Engineering Department at least two weeks prior to final building inspection approval. CONDITION NUMBERS 1, 4, 8, 9, 14, 15, 16, 17, 19, 22 and 26 SHALL BE COMPLETED AND SIGNED OFF BY THE PLANNING DIRECTOR AND THE CITY ENGINEER PRIOR TO ACCEPTANCE OF CONSTRUCTION PLANS FOR PLAN CHECK BY THE BUILDING DEPARTMENT. All properties must pay School District fees to either the Los Altos School District or the Palo Alto Unified School District, as applicable, before receiving their building permit from Los Altos Hills. The applicant must take a copy of Worksheet #2 to school district offices (both the elementary and high school offices in the Los Altos School District), pay the appropriate fees and - provide the Town with a copy of their receipts. NOTE: The Site Development permit is valid for one year from the approval date (until June 23, 1999). All required building permits must be obtained within that year and work on items not requiring a building permit shall be commenced within one year and completed within two years. s' � • ate= ATTACHMENT TOWN OF LOS ALTOS HILLS PLANNING DEPARTMENT 26379 Fremont Road• Los Altos Hills, California 940221•(650)941-7222 • FAX(650)941-3160 WORKSHEET #2 EXISTING AND PROPOSED DEVELOPMENT AREA AND FLOOR AREA • TURN IN WITH YOUR APPLICATION • PROPEK'1Y OWNER'S NAME h PROPERTY A15DRESS is • Imo► Lane • • I ; • DATE l e 16 1. DEVELOPMENT AREA (SQUARE FOOTAGE) Existing ' Proposed Total (Additions or Deletions) A. House and Garage (from Part 2. A.) 5 3j5 B. Decking j 3 at) C. Driveway and Parking (Measured 100'along centerline) 4 -.5 D. Patios and Walkways ct Gj E. Tennis Court F. Pool and Decking c,Q I 1-1 G. Accessory Buildings (from Part B) H. Any other coverage cr C p v TOTALS ] -4' Maximum Development Area Allowed - MDA (from Worksheet#1) 1 off, C>T 2. FLOOR AREA (SQUARE FOOTAGE) +See C Existing Proposed Total (Additions or Deletions) A. House and Garage _ a. 1st Floor � y I� b. 2nd Floor od5f) c. Attic and Basement d. Garage ISt o B. Accessory Buildings a. 1st Floor b. 2nd Floor c. Attic and Basement TOTALS,! Maximum Floor Area Allowed - MFA (from Worksheet#1) e , . TOWN USE ONLY CHECKED BY DATE� (p f I (( • Revised 8/6/97 ARA cL FIRE DEPARTMENT °, n 5 77. � SANTA CLARA COUNTS R,■ FTDT,1rCONTROL NUMBER IE :: *- 14700 Winchester Blvd., Los Gatos, CA 95030-1818 BLDG PERMIT NUMBER COURTESY 65ERVICE (408) 378-4010 (phone) • (408) 378-9342 (fax) PLAN REVIEW NUMBER 98- 0562 pn c FILE NUMBER 30-98-ZP-SD DEVELOPMENT REVIEW COMMENTS CODE/SEC. SHEET NO. REQUIREMENT Review of proposed new 4465 square foot single family residence with an attached 870 square foot garage. The planner for this project is Ms. S-u-zaane-Davis. (Cu s;n S4-e.0 e.n sa n 1 Review of this Developmental proposal is limited to acceptability of site access and water supply as they pertain to fire department operations, and shall not be construed as a substitute for formal plan review to determine compliance with adopted model codes. Prior to performing any work the applicant shall apply to the Building Department for applicable construction permits. UFC . 2 Required Fire Flow: Required fire flow for this project is 2000 GPM at 20 psi Appendix Aresidual pressure. The required fire flow is not available from area water mains II and fire hydrant(s) which are spaced at the required spacing. • UFC 3 Required Fire Flow Option (Single Family Dwellings): Provide required fire 903.2 flow from fire hydrants spaced at a maximum of 500 feet OR Provide an approved fire sprinkler system throughout all portions of the building. The fire sprinkler system shall conform to National Fire Protection Association Standard #13D, 1994 Edition, and local ordinance requirements. UFC 4 Emergency Gate/Access Gate Requirements: When open gates shall not 902.2.4.1 obstruct any portion of the required access roadway or driveway width. If provided, all locks shall be fire department approved. Installations shall conform with Fire Department Standard Details and Specifications G-1. DISTRICT PLANS SPECS NEW RMDL AS OCCUPANCY CONST.TYPE PERMITTEE DATE PAGE LAH ❑ ❑ ❑ ❑ ❑ KC ASSOCIATES 03/16/98 1 of 2 SECJFLOOR AREA LOAD DESCRIPTION BY Residential Development Hokanson,Wayne NAME OF PROJECT LOCATION LANDS OF YEH 24055 Jabil Ln A California Fire Protection District serving Santa Clara County and the communities of Campbell, Cupertino, Los Altos, Los Altos Hills, Los Gatos, Monte Sereno, Morgan Hill,and Saratoga ° A °o FIRE DEPARTMENT `�' SANTA CLARA COUNTY e' CONTROL NUMBER E5f.1 ar 7 14700 Winchester Blvd., Los Gatos, CA 95030-1818 BLDG PERMIT NUMBER COUPTESY B'SERVICE (408) 378-4010 (phone) • (408) 378-9342 (fax) PLAN REVIEW NUMBER 98- 0562 0c FILE NUMBER 30-98-Zp-SD DEVELOPMENT REVIEW COMMENTS CODE/SEC. SHEET NO. REQUIREMENT UFC 5 Premises Identification: Approved numbers or addresses shall be placed on all 901.4.4 new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Numbers shall contrast with their background and be a minimum ;of four inches in height. • • • DISTRICT PLANS SPECS NEW RMDL AS OCCUPANCY CONST.TYPE PERMITTEE DATE PAGE LAH El D 0 ❑ 0 KC ASSOCIATES 03/16/98 2 OF 2 SECJFLOOR AREA LOAD DESCRIPTION I BY Residential Development Hokanson, Wayne NAME OF PROJECT LOCATION • LANDS OF YEH 24055 jabil Ln • A California Fire Protection District serving Santa Clara County and the communities of Campbell, Cupertino, Los Altos, Los Altos Hills, Los Gatos, Monte Sereno, Morgan Hill, and Saratoga ra. COTTON, SHIRES & ASSOCIATES, INC.TACHMENT (4 RECEIVED APR 0 1 1998 CONSULTING ENGINEERS AND GEOLOGISTS AT IUWtl OF LOS ALIOS HILLS March 31, 1998 L3088 TO: Susan Stevenson Planner TOWN OF LOS ALTOS HILLS 26379 Fremont Road Los Altos Hills, California 94022 SUBJECT: Preliminary Geologic and Geotechnical Review RE: Lands of Yeh,New Residence and Pool File #30-98-ZP-SD-GD 24055 Jabil Lane At your request, we have completed a preliminary geologic and geotechnical review of the subject property using: • Geotechnical Investigation Proposed Yeh Residence (report) by Wayne Ting & Associates, Inc., dated March 6, 1998; and • Site Development Plan, Architectural plans (5 sheets, 20 scale) prepared by KC Associates, dated February 26, 1998. In addition, we have reviewed pertinent documents from our office files and completed a site reconnaissance. DISCUSSION Our review of the referenced documents indicates that the applicant is proposing to remove the existing residence and pool, and construct a new, single-family two-story residence and pool. The new residence will require the construction of a new septic system. Access to the proposed residence is via a circular driveway from Jabil Lane. We have not received estimated grading volumes for the project, but submitted cross sections appear to indicate relatively minor grading. SITE CONDITIONS The lot is characterized by existing cut and fill slopes forming the building pad for the existing residence. Drainage of the site is characterized by sheetflow to the north to a swale that borders the northern property line. The Town Geologic Map indicates that the house site is underlain, at depth, by greenstone bedrock of the Franciscan Complex. The bedrock is, in turn, overlain by clayey sand to silty clay (potentially expansive soil, colluvium, alluvium, and artificial fill). The mapped trace of the potentially active Berrocal fault and the active San Andreas fault is 1,200 feet northeast and 3 miles southwest, respectively, from the subject property. Northern California Office Southern California Office 330 Village Lane 5245 Avenida Encinas • Suite A Los Gatos,CA 95030-7218 Carlsbad,CA 92008-4374 (408)354-5542 • Fax(408)354-1852 (760)931-2700 • Fax(760)931-1020 e-mail:losg@csageo.come-mail:carl@csageo.com Susan Stevenson March 31, 1998 Page 2 L3088 CONCLUSIONS AND RECOMMENDED ACTION The proposed development is constrained'by soil creep, existing potentially non- engineered fills,expansive soils,and susceptibility to strong seismic ground shaking.We understand from the architectural plans that little excavation will be performed. We also understand that site drainage design will be addressed to the satisfaction of the Town Engineer. The northeastern 25 feet of the proposed leachfield is located in existing fill. We understand that the County Environmental Health Department will review whether the leachfield is acceptable. We recommend that the Project Geotechnical Consultant evaluate the potential for adverse slope stability impacts associated with the leachfield system and characterize the expected seismic ground motion in percent gravity using a current attenuation relationship and known earthquake sources in the area.. Also, the current standard-of-care designfor foundation piers within the Town with similar soil conditions is a minimum 16-inch diameter pier reinforced with a minimum of four, #5 vertical rebars. . The basic site development plan appears geotechnically feasible if the proposed leachfield design is favorably evaluated by the County Environmental Health Department and the Project Geotechnical Consultant. Prior to issuance of permits for construction,the Project Geotechnical Consultant should review all geotechnical.aspects of the building plans, including specific evaluation of the design and placement of the proposed swimming pool, foundation, cut and fill, and drainage" alterations. Consequently,we recommend geotechnical approval of permits for project construction with the following conditions: 1. Supplemental Evaluations and Plan Review - The applicant's geotechnical consultant should_ characterize the peak and repeatable ground motion in percent gravity for the Berrocal and San Andreas fault zones,using a current attenuation relationship. In addition, minimum standard-of-care pier design as discussed above should be considered. The potential for adverse slope stability impacts associated with the septic leachfield system should be addressed. The applicant's geotechnical consultant shall review .and approve all geotechnical aspects of the development plans (i.e., site preparation and grading, site drainage improvements and design parameters for the foundation, retaining walls, and swimming pool) to ensure that his recommendations have been properly incorporated. The results of the plan review should be summarized by the geotechnical consultant-in a letter and submitted to the Town Engineer for review and approval prior to issuance.of building permits. 2. Geotechnical Field Inspection -The geotechnical consultant shall inspect, test (as needed), and approve all geotechnical aspects of COTTON, SHIRES& ASSOCIATES, INC. Susan Stevenson March 31, 1998 Page 3 L3088 the project construction. The inspections should include, but not necessarily be limited to: site preparation and grading, site surface and subsurface drainage improvements, and excavations for foundations and retaining walls prior to the placement of steel and concrete. The consultant shall verify that new fill materials are properly compacted, keyed and benched where appropriate into competent earth materials. The results of these inspections and the as-built conditions of the project shall be described by the geotechnical consultant in a letter and submitted to the Town Engineer for review prior to final (as- built) project approval. This review has been performed to provide technical advice to assist the Town in its discretionary permit decisions. Our services have been limited to review of the documents previously identified, and a visual review of the property. Our opinions and conclusions are made in accordance with generally accepted principles and practices of the geotechnical profession. This warranty is in lieu of all other warranties, either expressed or implied. Respectfully submitted, COTTON, SHIRES &ASSOCIATES,INC. TOWN GEOTECHNICAL CONSULTANT xJ Chris Willoughby Engineering Geologist (, Patrick O. Shires Principal Geotechnical Engineer GE 770 POS:CW:rb COTTON, SHIRES & ASSOCIATES, INC. 47% 7 2)/5T'? r, a7 a 'ATTACHMENT 5 MINUTES OF THE LAH PATHWAYS, PARKS & RECREATION .C. . }iii 3a`E .MEETING • March 23, 1998 APR 1 Roll Call: Present : Les Earnest, Diane Barrager, Betsy Bert v},, ylvia Jensen, Katy Stella, Bob Stutz, Scott Vanderlip. Absent : Harry Emt..11.-iNPettty Rooker. Minutes: February minutes 'approved. Announcements: Next pathway inspection walk is scheduled- for Saturday, April 4 at_ 1:15 pm. Next pathway meeting is scheduled for Monday, April- 27 .at - 7 :30 pm at Town Hall . Pathways Day Hike is scheduled for Sunday, Mayl31 beginning at 1 : 00 pm from Town Ball Fields . This will preceed the Town picnic scheduled for about 2 :30 the same day. Reports ?lanning Commission liaisons will be Betsy Bertram on March 25, Diane Barrager )n April 8, and Katy Stella on April 22 . • Down Council turned down path along Beth Am property. Les Earnest will draft a Letter to Council in response. The ,entire committee - agreed that this does not appear to be consistent with the Master Pathway •Plan. • )ld Business: • • ies . Earnest will redo the Top Ten Maintenance Requests list. First ' on the list sill be the route that will be used for the Pathway Day Hike on 5/31 . The :apitol Expenditure list will also be redone. • FEW BUSINESS .2246 Via Arline; Lands of Godby: No request'. • .2010 Elsie Way; Lands of Murthy & Srinath: Restore II-B path along Concepcion oad. • 4055 Jabil Lane; Lands of Yeh:-- Construct a IIi-B path along Jabil Lane from lagdalena to the Southeast corner of the property and acquire pathway easement n order to connect to future path to Fernhill . 4470 Manuella; Lands of Kwong: Construct II-B path along Manuella . 3474 Robleda Road; Lands of Danver: No request . • • 7760 Sherlock Road; Lands of Huang: Provide a pathway easement on Sherlock. ubmitted by Sylvia Jensen • • • • • • TOTAL P.02 _ATTACHMENT L ENVIRONMENTAL DESIGN COMMITTEE RECEIVED LAN CAPE 4 38 PEE&ALUATION APR 0 7 1998 LL� Applicant's Name: L l/Z TOWN OF LOS ALTOS HILLS Address: , 9,p5:3-- jezA/Z,E' /cy Reviewed by:`7'd/'CZe S7' aI%ei•5� ate: J / /6_z_/- fop Mitigation needed: ,Cf� ��` Gt�5 biz/Uk ` Sided 4 tome e�/�1>eY�zc �t *-/ f // rm5id Sir , Visibility from off site:.from distance (dxfections), from nea neighbors A4'h% (directions) (include need for screening for privacy). Noise: from pump/pool , air conditioner 7X-_, sport court Light: from fixtures , automobile headlights" Fence materials: color , open/solid . Erosion control Other: Planting Plan Evaluation: (Circle required trees and shrubs on plan) Are sPecies appropriate: Deciduous? Future height(view, solar, drive/path blockage) Fire hazard Hardiness/frost Drought tolerance Meet mitigation needs `e 1'`y li'�Sc ale o474-= Y �S d 'teed `7�J//`-K`�s S,des 1 GU,00id D6 7/o See lakc/.s /e, Creeks and drainage: Is there a conservation easement? Are there sufficient protections in place. Will fences impact wildlife migration? Invasive species should not be planted near a waterway. • Other: Are there obstructions to pathways, including future growth of plants? Are all noise mitigations in place? No construction in road right-of-way. • CERTIFIED ATTACHMENT '7 RECEIVED 1....-,. Certified, Insured Expertise 75-7v,...;..-7. at Owner-Operator Rates PR ? , i,99`'� MI,M11,4•8040 1B JAMES SCOTT TOWN OF LOS ALTOS HILLS ARBORIST Contractor's Lic.#667786 I L( 3 )-S/1/40 3 eW fry 4.je, Bonded&Insured Arborist#971 36—na)i r5-0 3 0 . . &e(), fi) ) 8- -__ 3 5si79S0 k . 6-co -r(r - i}eNto.c. s vi).- s- 4 TtAt.3 TR.vAii) (Ailm•6 11 W ' , peS q thJ.k) • f'iVoc (it*�4 CK ( ( p(4)(0 7 (7 .5 Gv Pr)5-ec c. ikrct'C-1 7 P c�S q cBUJS eue{(41 3---L/ruPek 5 T-T2 TR,ASLI11 n.:(1)1siifii" t/ Ce Ift),3 C1.0---1 ,Bt-e7(r l 5 ,c-7-(,?1 Atcl fik-J-P) 3 c(-- kP4/-e12 131( •_s ru----ae sum4A4_0.-t. AtAdvtedq 3 -c-- I2eIV<I-e S Re (Dsdoxi) fe.4,A.,,,ti . wi�e,3 e 1 7e Ilk2,e ,e,sotlU , 43 Viet,u-e(f), .Vel,“4". . A-3 Luz./ 6 tecinv-5,• 7-64JA-5 i ' s'qc •` 408-370-2089 ` Eve da rv, c)- 9) orv\ o! voiLoa,20A01 ( v k52-)..1j (vo"(),0_, (C194-cll'CA- V 0--) 5 ) Verv- i)a-n\rifh\o 1(v) 'CI