HomeMy WebLinkAbout3.1 S.
TOWN OF LOS ALTOS HILLS November 10, 1998
Staff Report:.to the Planning Commission
RE: SITE DEVELOPMENT PERMIT FOR A POND AND LANDSCAPE PLAN;
LANDS OF SCOTT, 27860 BLACK MOUNTAIN ROAD;FILE#246-97-ZP-SD.
FROM: Shaunn O'Connor, Assistant Planner
APPROVED BY: Curtis S. Williams, Planning Direr _
RECOMMENDATION That the Planning Commission:
Approve the requested Site Development Permit, subject to the attached conditions of
approval.
CODE REQUIREMENTS
Section 10-2.301(c)(3)(iv) - of the Site Development Ordinance requires Planning
Commission review of excavations exceeding an area of 10,000 square feet. This
application for a new pond and landscaping has been forwarded to the Planning
Commission for review and approval. Criteria for review from the Site Development
Ordinance include grading, drainage, pathways and landscape screening. Zoning Code
review encompasses compliance with development area requirements and setbacks.
BACKGROUND
The subject property for the proposed pond and landscaping is located near the terminus of
Black Mountain Road on the southern side (Assessor's Parcel No. 182-12-078, Lot 3 of
Tract 3908, established in 1965). There are no subdivision conditions of approval for this
site.The property extends approximately 487 feet southeast of Black Mountain Road. A 28-
foot wide driveway and public utilities easement exists along the frontage of Black
Mountain Road. The site is currently vacant (a residence, pool, caretaker house, tool shed
and barn existing on the site were demolished several years ago) and the adjacent lots are
developed. The applicant's residence (Assessor's Parcel No. 182-12-64, Lot 5 of Tract
3908, established in 1965) abuts the back southeastern half of the site.
•
Planning Commission
Lands of Scott
November 10, 1998
Page 2
DISCUSSION
Site Data:
Gross Lot Area: 3.221 acres
Net Lot Area: _ 3.011 acres
Average Slope: 3.7
Lot Unit Factor: 3.011
Floor Area and Development Area:
Area Maximum Proposed Existing Increase Left
Development 45,165 10,451 0 10,451 +34,714
Floor 18,066 0. _ 0 0 18,066 -
The adjoining lot with the Scott residence (lot 5).complies with all development standards -
without the benefit of the subject property. -
Site and Design
The applicant is requesting approval of a site development permit for a new pond and
landscaping. The proposed project will include 10,451 square feet of development area
for the pond and bogs and additional landscaping on the property. A mulch driveway is
proposed as access to the pond for maintenance. No lighting is proposed for this project.
The proposed pond will have a maximum depth of 4 feet and will have a surface area of
approximately 9,000 square feet. The additional 1,451 square feet will be used for bogs
and patio area. A meandering pathway is proposed around the pond with a connection to
the Scott's residence at 27860 Black Mountain Road.
The proposed pond is designed to have a natural form and is located in a clearing between
-the trees on the site. Some-of the excavated soil will be used as fill for existing
depressions on the site and the remainder will be spread in open areas to a maximum
depth of two feet.
Maintenance & Vector Control
The pond will be maintained on a weekly basis. This will include maintaining water
quality and clarity, keeping the filtration system in working order, removal of debris, and
the overall health of the fish and plants. A pond maintenance agreement (condition #3) is
required to be recorded, stating that the property owners will be responsible for
maintaining the pond water clarity, proper vector control and the integrity of the darn on
the northeast side of the pond.
Planning Commission
Lands of Scott
• November 10, 1998
Page 3
The size of the pond requires appropriate vector control and proper County approval.
Staff has included condition #4 requiring an approval letter from Santa Clara County
Vector Control, prior to acceptance of plans for building plan check.
Visibility
The project site is fairly level with an average slope of 3.7%. The mild topography lends
itself to hiding the pond. The landscaping and dam, at the northeast end of pond, will be
the most visible elements on the site.
Trees &Landscaping
The project site is fairly open and is studded with oaks, pines, eucalyptus and fir trees and
a large cluster of trees in the southeast corner of the site. The arborist's report
recommends that trees within the construction zone be fenced to protect roots and
branches from construction injury (see condition#5).
Screening is proposed to be planted along the Black Mountain Road frontage and along
the driveway up to Mr. Scott's residence. Additional trees are shown on the site plan, but
the types of trees have not been selected. The Environmental Design Committee _ -_ •
recommends that plantings consist of native species. Condition #6 requires that planting
emphasize native species and that a landscape plan be submitted for review by staff and
the Environmental Design Committee prior to acceptance of plans for building plan
check.
Grading &Drainage
The pond is shown as having a maximum depth of 4', requiring 945 cubic yards of soil to
be excavated. All of the excavation will be used on site for fill (195 cubic yards for fill in
depressions and 750 cubic yards to be spread on the site, 2 feet maximum) and a dam (35
cubic yards) on the northeastern side of the pond.
Two neighbors that live on Foothill Lane have voiced concern about increased runoff _
from the proposed two feet of fill to be spread on the site. The residences on the east side
of Foothill Lane had drainage problems due to last year's rains. The Commission may
prefer to have the applicant export the 750 cubic yards of excavated soil that is proposed
to be spread on site. If so, condition#1 should be modified accordingly.
The Engineering Department has reviewed the plans and has recommended conditions of
approval as specified in Attachment 1. The Engineering Department has suggested that
the site drainage be designed as surface flow wherever possible to avoid a concentration
of runoff. This has been included in condition #8. The applicant proposes an overflow
mechanism near the dam that will route water forty feet away to a four inch by twenty
foot long perforated tee set on a two foot wide base of cobble stones to dissipate the water
flow. The Engineering Department will review and approve the final drainage plan prior
to acceptance of plans for building plan check.
Planning Commission - -
Lands of Scott _
November 10,1998
Page 4 •
Geotechnical Review
The Town geotechnical consultant, Cotton, Shires & Associates, has reviewed the plans
and has visited the site. Approval of the project is subject to the conditions as specified in
the Town Geologist's report of December 17, 1997 (see Attachment 3). Condition #7
includes the recommendations of the Town Geologist.
Committee Review
The Environmental Design Committee recommends native plantings.
Staff is available to answer any questions that the Commission or the public may have.
ATTACHMENTS
1. Recommended conditions_of approval;
2. Worksheet#2; •
3. Letter from Cotton, Shires &Associates,Inc. dated December 15, 1997.(three pages);
4. Environmental Design & Protection Committee evaluations, received November 11,
1997;
5. Plans.
cc: Daniel Lima Michael Scott
Renaisance Landscaping 27856 Black Mountain Road
2120 Church Ave. Los Altos Hills, CA 94022
San Martin, CA 95046
Planning Commission
Lands of Scott
November 10, 1998
Page 5
ATTACHMENT 1
RECOMMENDED CONDITIONS FOR SITE DEVELOPMENT PERMIT
FOR A POND AND LANDSCAPING PLAN
LANDS OF SCOTT, 27860 BLACK MOUNTAIN ROAD
File#246-97-ZP-SD
A. PLANNING DEPARTMENT:
1. Any modifications to the approved plans shall be approved by the Planning Director
or the Planning Commission, depending on the scope of the changes.
2. No outdoor lighting has been approved with this permit. Any changes to outdoor
lighting shall be approved by the Planning Department. Lighting fixtures shall
generally be shielded and directed downward. Lighting shall be low wattage, shall not
encroach or reflect on adjacent properties, and the source of lighting should not be
directly visible from off site. No lighting may be placed within the setbacks.
3. A pond maintenance agreement shall be recorded for the property, stating that the
property owner will be responsible for maintaining the pond through proper vector
control, water clarity and maintenance of the integrity of the dam on the northeast side
of the pond. The City Attorney will prepare the pond maintenance agreement and the
signed, notarized document shall be returned to the Town prior to acceptance of
plans for building plan check.
4. The applicant shall submit a letter of approval from the Santa Clara County Vector
Control prior to acceptance of plans for building plan check.
5. Prior to beginning any grading operation, all significant trees are to be fenced at the
drip line. The fencing shall be of a material and•structure to clearly delineate the drip
line. Town staff must inspect the fencing and the trees to be fenced prior-to
commencement of grading. The property owner shall call for said inspection at least
three days in advance of the inspection. The fence must remain throughout the
course of construction. No storage of equipment, vehicles or debris shall be allowed
within the drip lines of these trees.
6. Proposed landscaping shall emphasize native species. A landscape plan shall be
submitted for review and approved by the Planning Department and the
Environmental Design Committee prior to acceptance of plans for building plan
check. Staff will visit the site prior to final inspection to determine if any additional
plantings will be needed to screen the pond or to restore areas disturbed by grading or
construction.
Planning Commission
Lands of Scott -
November 10, 1998
Page 6
7. As recommended by Cotton, Shires & Associates in their report dated December 15,
1997, the applicant shall comply with the following:
a. The applicant should retain a geotechnical consultant to address the
items in the above mentioned report regarding fill placement
specifications, pond liner and appropriate amoring for the overflow.
The applicant's geotechnical consultant shall review and approve all
geotechnical aspects of the development plans (i.e., site preparation
and grading, site drainage improvements and design parameters for
foundations and driveway) to ensure that his recommendations have
been properly incorporated.
The results of the plan review should be summarized by the
geotechnical consultant in a. letter and submitted to the Town
_ Geotechnical Consultant- for review and approval prior to the
acceptance of plans for building plan check.
b. The geotechnical consultant shall inspect, test (as needed), and approve
all geotechnical aspects of the project construction. The inspections
should include, but not necessarily be limited to: site preparation and
grading, site surface and subsurface drainage improvements, and
placement pond liner. The consultant shall verify that new fill materials
are properly keyed and benched into competent earth materials.
The results of these inspections and the as-built conditions of the project
shall be described by the geotechnical consultant in a letter and
submitted to the Town Engineer for review prior to final inspection.
For further details on the above requirements, please refer to the letter from Cotton,
• Shires & Associates dated December 15, 1997.
B. ENGINEERING DEPARTMENT:
8. The site drainage associated with the proposed development must be designed_ as
surface flow wherever possible to avoid concentration of the runoff. The proposed
drainage shall be designed to maintain the existing flow patterns. A final grading and
drainage plan shall be submitted for approval by the Engineering Department prior to
acceptance of plans for building plan check. Final drainage and grading shall be
inspected by the Engineering Department and any deficiencies corrected to the
satisfaction of the Engineering Department prior to final inspection. A letter shall be
submitted from the project engineer stating that the drainage improvements were
installed as shown on the approved plans and in accordance with their
recommendations prior to final inspection.
9. Any, and all, changes to the approved grading and drainage plan shall be submitted as
revisions from the project engineer and shall first be approved by the Town
Planning Commission
Lands of Scott _
November 10, 1998
Page 7
Engineering Department. No grading shall take place during the grading moratorium
between November 1 and April 1 except with prior approval from the City Engineer.
No grading shall take place within ten feet of any property line except to allow for the
construction of a driveway access.
10. All public utility services serving this property shall be placed underground.
11. An erosion andsediment control plan shall be submitted for review and approval by
the Engineering Department prior to acceptance of plans for building plan check.
The contractor and the property owner shall comply with all appropriate requirements
of the Town's NPDES permit relative to grading and erosion/sediment control. The
first 100 feet of the driveway shall be rocked during construction and all cut and fill
slopes shall be protected from erosion. All areas on the site that have the native soil
disturbed shall be protected for erosion control during the rainy season and shall be
replanted prior to final inspection.
12.Two copies of a grading and construction operation plan shall be submitted by the
property owner for review and approval by the City Engineer and Planning Director
prior to acceptance of plans for building plan check. The grading/construction plan
shall address truck traffic issues regarding dust, noise, and vehicular and pedestrian
traffic safety on Black Mountain Road and surrounding roadways; storage of
construction materials; placement of sanitary facilities; parking for construction
vehicles; and parking for construction personnel. A debris box (trash dumpster) shall
be placed on site for collection of construction debris, if required by the Engineering
Department. Arrangements must be made with the Los Altos Garbage Company for
the debris box, since they have a franchise with the Town and no other hauler is
allowed within the Town limits.
13. The property owner shall inform the Town of any damage and shall repair any
damage caused by the construction of the project to pathways, private driveways, and
public and private roadways, prior to final inspection and shall provide the Town with
photographs of the existing conditions of the roadways and pathways prior to
acceptance of plans for building plan check.
Upon completion of the construction, a final inspection shall be required to be set with
the Planning and Engineering Departments two weeks prior to final building inspection
approval.
CONDITION NUMBERS 3, 4, 6, 7a, 8, 11, 12 and 13 SHALL BE COMPLETED
AND SIGNED OFF BY THE PLANNING DIRECTOR AND THE CITY
ENGINEER PRIOR TO ACCEPTANCE OF CONSTRUCTION PLANS FOR
PLAN CHECK BY THE BUILDING DEPARTMENT.
NOTE: The Site Development permit is valid for one year from the approval date (until
November 10, 1999). All required building permits must be obtained within that year and
work on items not requiring a building permit shall be commenced within one year and
completed within two years.
• `^WN OF LOS ALTOS MILLS j ATTACHMENT Z
26379 Fremont Road • Los Altos Hills,California 94022.• (415) 941-7222 • FAX (415) 941-3160 _
PLANNING DEP
WORKSHEET #2
EXISTING AND PROPOSED DEVELOPMENT AREA AND FLOOR AREA
• TURN IN WITH YOUR APPLICATION •
PROPERTY OWNER'S NAME SC.O-r1'-
_PROPERTY ADDRESS, 278(DO SLACK MOUNTAIN ZO,\1„'
CALCULATED BY K. LEETS DATE 4 - 11- q 1
1. DEVELOPMENT AREA (SQUARE FOOTAGE) : . -
Existing Proposed Total
(Additions or Deletions) -
A. House and Garage (from Part B) -----
B.
B. Decking
C. Driveway and Parking ___
(Measured 100' along centerline) -
D. Patios and Walkways —
E. Tennis Court - -- I
F. Pool and Decking —
G. Accessory Buildings (from Part B) —
H. Any other coverage ?()-ID — l )
TOTALS 2 1C)-ye-9-f__ L6-1
t0/14S-1
Maximum Development Area Allowed - MDA (from Worksheet #1) I 4511 Los I
2. FLOOR AREA (SQUARE FOOTAGE) ExistingProposed Total
(Additions or Deletions)
A. House and Garage
a. 1st Floor - __
b. 2nd Floor - `-
c. Attic and Basement — - — —_
d. Garage —
B. Accessory Buildings
a. 1st Floor
b. . 2nd Floor
c. Attic and Basement ---
TOTALS d . 0 --
Maximum Floor Area Allowed - MFA (from Worksheet #1) . I 16 ) 0(2. 62 I
E TOWN USE ONLY CHECKED BY DATE - y — _ ._ . =1
La.: MAC FID/ORIGINALS/f LANNINC/w0rkshect 02
Revised 12/I19/93
COTTON, SHIRES & ASSOCIATES, INC. ATTACHMENT
CONSULTING ENGINEERS AND GEOLOGISTS h'`
DEC 17i ,
Decemlier•15,.1997
L3467
TO: Susan Manca
•
Planner
TOWN OF LOS ALTOS HILLS
26379 Fremont Road
Los Altos Hills,California 94022
SUBJECT: Geotechnical Review
- RE: Scott Pond and Landscape Improvements -
#246-97-ZP-SD
27860 Black Mountain Road
At your request, we have completed a geotechnical review of proposed site
improvements using:
Site Development Plan (1 sheet, 20-scale) prepared by Clements
and Associates, dated April 17, 1997.
In addition, we have completed a recent inspection of site conditions and
reviewed pertinent technical maps from our office files.
DISCUSSION
The applicant proposes to construct a pond and bog garden requiring
approximately 1,20. 0 cubic yards of excavation and 400 cubic yards of fill. The proposed
pond is located in the east-central portion of the property. No residential structures are
currently located on the property. -
SITE CONDITIONS
The proposed pond site is generally characterized by relatively level to gently
inclined,north-facing ridge crest topography. Minor grading has previously occurred in
the vicinity of the pond, with existing excavations possibly trapping small amounts of
surface water. An apparent prism of artificial fill is located near the northernmost
portion of the pond and along the eastern edge of the pond. Existing fill may have a
maximum depth on the order of 3 feet.
Northern California Office Southern California Office
330 Village Lane 5245 Avenida Encinas • Suite A
Los Gatos,CA 95030-7218 Carlsbad,CA 92008-4374
(408)354-5542 • Fax(408)354-1852 (760)931-2700 • Fax(760)931-1020
ATTACHMENT.
Susan Manca December 15, 1997
Page 2 L3467.
The site is underlain, at depth, by mapped bedrock materials of the Franciscan
Complex (greenstone and sandstone). The bedrock is overlain by a mantle of potentially
expansive silty clay.
•
CONCLUSIONS AND RECOMMENDED ACTION
Based on our site inspection and review of the development plan, it appears that
construction of the proposed pond is geotechnically feasible. However, to minimize any
potential for failure of fill embankments that retain water, it is important that proposed
fill be placed in a properly engineered manner (to specific compaction specifications)
under the inspection of a geotechnical consultant. Some of the existing site fill may need
to be reworked to provide a suitable base for placement of proposed engineered fill. To
avoid generating any adverse subsurface seepage with potential offsite impacts,
consideration should be given to incorporating a clay liner (or other relatively
impermeable liner material) into the design of the pond. Consideration should also he
given to utilization of appropriate surface armoring at the location of the proposed
overflow to prevent scour/erosion.
We recommend geotechnical approval of the general pond concept with the
• following conditions:
1. Limited Geotechnical Evaluations and Plan Review - The
applicant should retain a geotechnical consultant to address the
above items regarding fill placement specifications,pond liner and
appropriate armoring for the overflow. The consultant shall
review and approve all geotechnical aspects of the development
plans (i.e., site preparation and grading, and site drainage
improvements) to ensure that his recommendations have been
properly incorporated.
The results of the plan review should be summarized by the
geotechnical consultant in a letter and submitted to the Town
Engineer for review and approval prior to issuance of construction
permits.
2. Geotechnical Field Inspection-The geotechnical consultant shall-
inspect, test (as needed), and approve all geotechnical aspects.of
the project construction. The inspections should include,but riot
necessarily be limited to: site preparation and grading, site
surface and subsurface drainage improvements, and placement of
the pond liner. The consultant shall verify that new fill materials
are properly keyed and benched into competent earth materials.
The results of these inspections and the as-built conditions of the
project shall be described by the geotechnical consultant in a letter
and submitted to the Town Engineer for review prior to final (as-
built) project approval.
A cent`TATre TAT!"'
ATTACHMENT ?j
Susap Manca December 15,1997
Page 3 L3467
Thisreview has been performed to provide technical advice to assist the Town in
its discretionary permit decisions. Our services have been limited to review of the
documents previously identified, and a visual review of the property. Our opinions and
conclusions are made in accordance with generally accepted principles and practices of
the geotechnical profession. This warranty is in lieu of all other warranties, either
expressed or implied.
Respectfully submitted,
COTTON, SHIRES AND ASSOCIATES,INC.
TOWN GEOTECHNICAL CONSULTANT
Ted Sayre
Supervising Engineering Geologist
CEG 1795
- C� '"e
Patrick O.Shires
Principal Geotechnical Engineer •
GE 770
POS:TS:rb
Cn-r-rnm STTTRFS &- A SSOCTATES. INC'
ATTACHMENT 9
ENVIRONMENTAL DESIGN COMMITTEE
LANDSCAPE/HARDSCAPE EVALUATION �.
Applicant's Name:
Address: �7/1 a ��✓ �[�C _�%Ly ,/�Gt' �—�-!-
Reviewed by: � Date: //. .1007
Mitigation needed:
Visibility from off site: from distance Ad, (directions), from nearby
neighbors (directions) (include need for screening for privacy).
Noise: from pump/pool C, air conditioner , sport court .
Light: from fixtures , automobile headliglits"
- Fence materials: color , open/s lid . Erosion control •
Other: .-----7?-00G04(714 } 6�?�
Planting Plan Evaluation: (Circle required trees and shrubs on plan) • - -
Are species appropriate: Deciduous?
Future height (view, solar, drive/path blockage)
Fire hazard
Hardiness/frost
Drought tolerance
Meet mitigation needs
Creeks and drainage: Is_there a conservation easement? Are there sufficient
• protections in place. Will fences impact wildlife migration? Invasive species
should not be planted near a waterway.
•
•
Other: Are there obstructions to pathways, including future growth of plants? Are all
noise mitigations in place? No construction in road right-of-way.
cg//tizarfifi-ic 41,0 Kce P
-
P
:.I►,'/
November 3, 1998
City of Los Altos Hills
Attn: Shaunn O'Connor
26379 Fremont Road
Los Altos Hills, CA 94022
Dear Mr. O'Connor,
Thank you for reviewing with my wife and I the proposed plans for Mr. Scott's
property. I have several reservations based on my review. First, I am surprised
by the size of the proposed pond. The excavation of 945 cubic yards of soil
would certainly indicate a major water containment area. This much water
surface area coupled with the proposed adjacent marsh areas would seem to
offer an excellent breeding ground for mosquitoes. I also might add that during
the spring of the year, the din from the assembled frog population could be
interesting. Additionally, it appears this much surface water would be an
attractive refuge for wild birds. I can not judge what impact this would have on
surrounding homes. Perhaps someone that has lived around a duck pond
could offer some thoughts.
I have noted the plans call for raising the grade level adjacent to my property
from an existing topography elevation of 105 to 107. Your map indicates that
the topography level of my driveway is 103 and since my driveway is only a
short distance from the existing 105 elevation, I am very concerned that when
an extra two feet is added to the existing grade level on Mr. Scott's property, we
could encounter a serious drainage problem. It is my understanding that
several of the existing homes on Foothill Lane have experienced drainage
problems, and therefore, anything that alters the current elevation of this
property should be looked at carefully.
I for one would feel more comfortable if the proposed pond is reduced in size-
and that the existing grade on Mr. Scott's property is not altered.
Thank you for your consideration.
Sincerely,
'IYK'an
Michael M. Scott
27856 Black Mountain Road; Los Altos Hills, CA 94022
*Voice: 650-941-3092 *Fax: 650-941-8547 *E-mail: WurmFafner@aol.corn
Thursday, October 29, 1998
To: LAH Planning Committee, LAH Staff and Neighbors
From: Mike Scott4/K,S
Subject: Pond and Landscaping for 27860 Black Mtn Road
Summary: The best way to understand what is proposed is to
visit 27856 Black Mtn Road and see my existing small pond. The
plantings around and in it are very similiar to those planned for
27860. Please call me at the above phone number to arrange for a
mutually agreeable time for your visit.
Comments: The attached plans are to install a pond in the
previous residence basement area. Existing natural drainage •
routes will be maintained. The pond area will be excavated
down 4 feet, a water proof membrane installed, and then will be
partially refilled with dirt to grow water lilies and lotus flowers.
Reeds will be planted in separate "bog" areas. Any left over dirt
will be distributed around the site. No dirt will be removed from
the site. No existing trees will be removed and over 18 new trees
will be planted.
The pond is planned as a "water garden" and not as a "fish
. pond;" although small "Mosquito" fish, provided by Santa Clara
County, will be used to provide pest control. An airation system
is planned to maintain water quality and no chemicals will be
used. I expect an increase in wildlife, particularly birds, that will
visit the area.
RECEIVED
OCT 291998
TOWN OF LOo hLiU6 HILLS
/
�'